The water and electricity construction is quite heavy during the decoration, how to transform the wa

Updated on home 2024-07-04
21 answers
  1. Anonymous users2024-02-12

    Although it is small, if you are not careful, it will affect the convenience of life in the future. So how to design the waterway and circuit of the bathroom to meet the specifications? The following is a summary of 10 toilet water and electricity renovation experiences summarized in the past 10 years!

    To check that the ventilation duct is installed and sealed. This is because some workers skip this step in order to save trouble, and then wait until you live in it, and the house will smell every day.

    <> where to put the wash basin, shower, toilet squatting toilet, bathroom pendant, whether to install glass partitions, as well as lighting, heating, exhaust requirements, these are to communicate with the decoration company, workers to communicate well, otherwise the modification is time-consuming, laborious and costly, but also leave the hidden danger of destroying the waterproof layerFor example, more than 10 years ago, the hydropower transformation was completed for one or two thousand yuan, and now almost all of them cost seven or eight thousand yuan, and some even tens of thousands of yuan. The main reason for this problem is that there are more and more contents of hydropower transformation, which shows that it is becoming more and more important.

    For example, living room, dining room, bedroom, study, bathroom, kitchen, etc., if the requirements are high, you can separate the socket and lighting circuit, and where there are many electrical appliances, such as the kitchen, the bathroom should use 4 square meters or even higher specifications of wires, mainly according to the electrical appliances. Reserve the pipe from top to bottom to achieve the required size, so that the part of the pipe in the wall has no joint, and the inner wire elbow can be welded below, but this cost is high, some owners do not accept, the disadvantage is that the pipe is installed in the bathroom cabinet, mirror, towel rack, bathroom decoration construction, often everyone thinks, not is the shower, toilet and basin, there are not many things, and the water and electricity are much better than the kitchen. The most important thing in the bathroom is that it is waterproof.

    And the kitchen is much more important than the bathroom, all kinds of electrical equipment, "gold kitchen and silver bathroom" is not in vain. One is to go to the roof, and the other is to go underground. The two methods have their own advantages and disadvantages, if you walk on the ground, due to the heavy water vapor in the bathroom, the large water consumption and the greater impulse force when flushing, it is more conducive to daily use.

    If you go to the roof, it will be much easier to maintain and replace it later.

  2. Anonymous users2024-02-11

    The main problem of water and electricity decoration in the bathroom is waterproofing, whether it is water or electricity, it must be waterproofed, and the ground should also be waterproofed to avoid water leakage.

  3. Anonymous users2024-02-10

    The water pipe is best to go from the top of the toilet to facilitate the detection and maintenance of water leakage in the later stage. Toilet circuits, bathroom joints and latches are not able to be exposed to air. Toilet switches should be designed outside the restroom to avoid water.

  4. Anonymous users2024-02-09

    Buy your own materials Ensure the quality of the water pipes Don't believe the renovation company's so-called horizontal and vertical It is money-saving.

    The water pipes are all on the ground, and you can rest assured that they will be pressed and tested for water leakage after they are done.

    Yes, the bathroom should have a separate set of 4 square wires, because the water must be connected to a leakage protection switch.

  5. Anonymous users2024-02-08

    If you want to renovate the water and electricity in the bathroom, the best way is to dredge this circuit, and then this pipe should be dredged in all directions to achieve good results.

  6. Anonymous users2024-02-07

    Arrange all water facilities in the toilet appropriately. The most common water supply facilities for toilets are showers, toilets, wash basins, and washing machines. The first step in restroom renovation is to accurately arrange all the water facilities in the restroom.

    At this time, we need to accurately locate the size and the corresponding space size to meet our decoration needs.

    Confirmation of water points. At this point, we can accurately determine the position of the water point above the corresponding position of the wall. For example, the water supply pipe in a restroom is usually about 350 mm from the finished surface of the floor.

    The water used for the washing machine is generally about one meter away from the finished surface of the ground. Similarly, for washbasins and shower rooms, draw water points on the walls as required.

    Snaps and slots. At this point, we should cut off the line from the original reserved water supply point. This line was the layout of our later water pipe flow.

    Therefore, when snapping the line, snap the line from the original water storage point of the toilet bowl to each new storage point. The width of the elastic wire is determined by the diameter of the water supply pipe installed in the trench. In general, it can be increased by two centimetres depending on the pipe installed in the trench.

    Installation and acceptance of pipelines. After we have fully opened the ditch, we can arrange the water pipes in the ditch. When laying out the pipes, it is recommended that you choose the most commonly used PPR pipes and install them with the method of hot melt connections.

    It is then tied with copper wire and fixed in the groove. After all pipes and fittings are installed, the local points in the pipe trench should be fixed with cement mortar before the pressure test. After the pressure test is qualified, the ditch is restored and the waterway reconstruction is completed.

    We should first divide all the circuits within the restroom into a master circuit, which should be laid out from the indoor distribution box. There is a special leakage protection switch in the distribution box, that is, the main switch of the bathroom. At this time, it is recommended that you choose the 20A leakage protection switch, and then choose the 4 square copper core flexible wire.

    Three wires are connected from the distribution box to our bathroom.

    Arrangement of conduits. We need to confirm the power consumption point of the bathroom. The main confirmation here is the location of the wall socket and the location of the light switch.

    For example, the most common sockets in the bathroom include the socket for the washing machine, the socket for the electric water heater, and the socket next to the vanity mirror, which need to be checked in advance. In addition, a junction box for exhaust fans is reserved above the top plate. In addition, light switches and ventilator switches should remain in place and installed.

  7. Anonymous users2024-02-06

    We first have to plan the design of each area of the bathroom, if it is a non-sinking toilet, the original sewer pipe developer in the bathroom has been done, without changing the layout, we can directly use the original sewer pipe, I need to change the layout, we need to use the original sewer pipe to transform again, and at the same time can install sockets next to the toilet and on the top of the sink, so that it is convenient to install an electric toilet in the future.

  8. Anonymous users2024-02-05

    First of all, the water and electricity of the house should be renovated, the waterway and circuit can be reconstructed, and the wires should be repaired, and the wires should be replaced, and the wires with a larger square should be replaced, and then the water pipes should be dredged.

  9. Anonymous users2024-02-04

    When renovating the bathroom, you should first install the electricity, and then carry out the waterproofing work.

  10. Anonymous users2024-02-03

    Hydropower construction is very important, how should water and electricity be done when decorating the bathroom?

    Most of the installation methods of hydropower project routes are to go to the ground, go to the wall, and go to the top of the line. No matter which way, the route of the toilet hydropower project needs to be horizontal and vertical, mainly to facilitate the regular inspection of the middle and late assembly of small pendants to prevent the water and electricity line casing, when the toilet is decorated, the drainage pipe road is the pipe of all the tap water in the toilet. Basic restrooms generally have potable water as well as raw water.

    It is very simple to deal with raw water, and it is generally a raw water pipeline embedded in the side of the toilet.

    The waterway includes drainage and drainage pipes and water seepage, the drainage pipe is simply to discharge the sewage in the house, such as showering, brushing dishes, and draining the water after cleaning, and the water seepage is simply the tap water pipe, and there are many water machines and equipment in the toilet, and the water hammer effect is large, and the damage to the pipeline is also great. The water pipeline line goes to the top, which is conducive to the water pipe itself to resist the water hammer according to the vibration. The water pipe and the trunking road are not very waterproof, and the moisture-proof is not easy to seep, and the water will seep out of the pipe in the case of water leakage.

    Because the toilet has heavy water vapor and is wet and cold for a long time, it is more suitable to set the power circuit on the roof. Lighting fixtures and power switches should preferably be protected with safety protection, and connectors and plugs do not have to be exposed. It is best to build the switching power supply circuit outside the restroom.

    Nowadays, the common tap water pipes are almost all PP-R pipes, and this kind of pipe fittings are divided into cool water pipes and heating pipes.

    For the design and construction of water and electricity for the installation of toilets, because the design scheme is the owner of the community and the master of water and electricity installation, the construction of the project is the master of water and electricity installation, and most of them rely on the experience of the master to accurately locate and make the requirements possible. Moreover, it has the effect of safety protection for the internal structure of the toilet and the external power flow into the toilet, which is the most important reliable natural barrier for the power supply circuit of the toilet.

  11. Anonymous users2024-02-02

    The bathroom does not need to install too many sockets, just enough, so as not to cause unnecessary electric shock, water and electricity treatment to suit their own needs, must be waterproof, this is the most important.

  12. Anonymous users2024-02-01

    First of all, the slotted wiring should be made on the wall, and then the wiring slot should be closed, and a layer of waterproof should be made before tiling.

  13. Anonymous users2024-01-31

    Hydropower construction is very important, if the hydropower change is not good, it will bring great hidden dangers in the later use, so you must ask a professional master when changing the hydropower.

  14. Anonymous users2024-01-30

    The potential should be reserved for the location of the electrical appliances to be installed. Smart toilets, hair dryers, water heaters, washing machines, bath bombs, exhaust lights, mirror front lights, electric towel racks and other necessary electrical appliances should be reserved. It is said that it is simple, and the average family does not have too special requirements for the bathroom, and it can meet the basic needs.

    But for others, the installation of bath bombs and smart toilets is quite particular about line decoration. Toilet decoration water and electricity, really can't be careless, once there is a leakage in the later stage. That will cost us a lot of energy and money, so when the toilet is renovated, the home miscellaneous altar provides you with the following experiences, which are all summed up after suffering.

    <> decoration is a complex project, because there are many things in each functional area design, and there are a wide range of problems that need to be paid attention to, so many people will hope to stop decorating in the next few years after the decoration, because it is too energy-consuming and too expensive. The most important thing is waterproof! Important things said three times, waterproof, waterproof, waterproof!

    If there is a problem with waterproofing, all the subsequent processes are in vain, waterproofing is the first point, if the first point can not be obtained, the next ninety-nine points are equal to zero. It avoids the wet state of the circuit in the floor, greatly prolongs the service life of the wire, and the waterway goes to the top, which can also be avoided, the pipeline is buried under the floor, and the water leaks downstairs! Resulting in property damage!

    Compare photos of hydropower finishes and avoid installing water heaters, pendants, and mirrors in the later stage! Hit the pipe.

    The water of the toilet, the water and the sewer, if some brands of smart toilets are used, they also need to consider the water pressure of the water, the water pressure is not enough for the toilet to be filled with water, and a pressure machine must be installed; The ground is waterproof twice. Waterproof after 48 hours, acceptance. When doing water and electricity, pay attention to the floor drain and the location of the toilet.

    There is also the toilet whether to squat or sit. There are also some differences in the practice of overhead and filling ceramsite at the end. . .

  15. Anonymous users2024-01-29

    When decorating the bathroom, the first thing to do is to design the location of the bathroom first, which is to do a good job in the position of the water and electricity pipe fittings and switches. In particular, the waterway and circuit should go to the top and the ground, the electric pipe should be on the water pipe, the main light switch in the bathroom should be left outside the door, and the indoor power switch should be equipped with a waterproof box, in short, it should be safe and practical.

  16. Anonymous users2024-01-28

    The bathroom of the family is the most important place in a family, if the transformation is reasonable, it is very easy to use, I prefer the bathroom, you can take a bath, you can be convenient, you can wash clothes, you can wash your hair, so the washing needs to be completed in the bathroom, then you need to transform a little, it will be easy to use, the transformation of the wire must be safe, and the dry sound, but also to reduce a little, are worth noting.

  17. Anonymous users2024-01-27

    1. After the location of the washing machine is determined, the drainage pipe of the washing machine can be made into the wall, which is beautiful and convenient;

    2. If you want to close the excess floor drain, you must block the gap between the drainage pipe and the floor drain to prevent the water from overflowing;

    3. Think about whether to use gas or electricity water heaters in advance, and avoid temporary replacement of water heater types, resulting in repeated transformation of waterways;

    4. Waterway design should first think about all the equipment related to water, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, etc., their location, installation methods and whether hot water is needed;

    5. There should be a suppression test after the waterway transformation, and now many decoration teams do not have a suppression test, so we should pay attention to communicating with the decoration team.

  18. Anonymous users2024-01-26

    1. Washbasins and toilets should be equipped with angle valves to facilitate future maintenance 2. The power switch is best equipped with a waterproof box.

    3. After the pipeline is completed, the pressure test should be carried out, and then the waterproof treatment should be done 4. The flushing test should be carried out quickly after the floor drain is installed.

    5. It is also necessary to pay attention to the lights in the bathroom, and it is best to choose cold light sources, anti-fog, waterproof and energy-saving lamps, which are safe and energy-saving.

  19. Anonymous users2024-01-25

    Then it is necessary to find a special worker to lay the water circuit, and it is necessary to carry out inspections.

  20. Anonymous users2024-01-24

    The water and electricity in the bathroom must be safe to avoid electricity connection. And there should be a water trap on the socket. Prevents water vapor from corroding the socket.

  21. Anonymous users2024-01-23

    Hydropower should go to the ceiling, so that in case it breaks down later, it is easy to repair.

Related questions
21 answers2024-07-04

Workers install exhaust fans to check whether the ventilation duct is installed and sealed. This is because some workers skip this step in order to save trouble, and then wait until you live in it, and the house will smell every day. Bathroom pendants, whether to install glass partitions, as well as lighting, heating, exhaust requirements, these are to communicate with the decoration company, workers to make a good disclosure, otherwise it is time-consuming, laborious and expensive to modify, and it also leaves the hidden danger of destroying the waterproof layer, and the positioning of the functional area is very critical. >>>More

4 answers2024-07-04

1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More

7 answers2024-07-04

Precautions should be paid when designing and constructing houses for water and electricity: >>>More

21 answers2024-07-04

It is a new material, compared with some traditional Chinese building backfill materials on the market, it has good strength and durability, so it belongs to a low-carbon and environmentally friendly backfill material. The use of it can make the concrete produce some countless independent small air holes, and do not communicate with each other, and the adhesion to the wall is also particularly strong, and its overall strength of water repellency characteristics is also very good, which immediately eliminates the need for the second moisture-proof operation of the plastering layer. >>>More

19 answers2024-07-04

Because from the perspective of this construction engineering procedure, it is divided into three partsIf it's yoursRenovation companyTo undertake your renovation, then your decoration company is directly responsible, but if it is said that you hire your own workers, then it depends on your own prior agreementAfter all, such a thing as filling the pipe groove does not require high technical content. <> >>>More