The question of whether to install the water heater first or first to install the water heater mainly considers the question of whether the water heater tank is all-inclusive, half-packed, or surface-mounted.
-
It depends on whether you are installed in the open or concealed,,, it doesn't matter if you are installed in the surface,,, measure the size, reserve the hot and cold water pipes, install the bracket to see ,,, install the ceiling first,,, if it is concealed,,, it is definitely the water heater is preferred,,, personal opinion is for reference only.
-
This needs to be decided according to the actual situation, for example, I installed the water heater first, because the height of the water heater needs to be pressed as much as possible, if the ceiling is hung first, it will affect the installation of the water heater. If you don't affect each other, you can do whatever you want.
-
If the water heater is concealed, install the water heater first. If the water heater is surface-mounted, install the gusset plate first. Look at the interface you reserved in **.
-
The newly installed water heater is very beautiful, and the generous ruler is also very suitable.
-
Bathroom decoration should first hang the ceiling, and then install the water heater, right.
-
Of course, we have to do hydropower first. Because hydropower is wired. In general, it is necessary to run the line inside the wall.
-
Of course, it is to do hydropower first, because if you install the ceiling first and then install the hydropower, it will stir up a lot of sand and dust, which will stain the ceiling.
-
Hydropower should be done first, these are the most basic things, and in many cases these things are still very much needed.
-
It is best to install the ceiling first and then install the gas water heater.
Since the gas water heater is usually installed in the kitchen, the kitchen is an integrated suspended ceiling, and the aluminum gusset can be installed and then removed, so that it will not affect the pipe laying of the gas water heater, and the construction will be much easier. In addition, gas water heater is a high-power product, which has strict requirements for the environment, and the earlier it is installed, the more chances of damage during decoration.
The construction of the ceiling will be a little difficult, but the ceiling also needs to plan the installation location of the gas water heater in advance, and the flue is best reserved in advance, otherwise it can only be punched from the wall. Gas water heaters are usually wall-mounted, and the ceiling should also be reserved according to the overall appearance, and the ceiling should not be hung too low, and it is not convenient to use it if it is not beautiful.
Precautions for installing gas water heaters:
When installing a kitchen water heater, it is necessary to consider not only the height of the water heater itself, but also the height and requirements of supporting facilities. For example, the water pipe of the pier cloth pool is required to be 750 mm from the ground. The door extends 300mm outward and on both sides, and the waterproof paint is evenly painted, and the boundary is clear and neat.
The middle wire of the wire box should be meters above the ground.
According to the standard voltage of 220 volts, it is between 198 volts and 235 volts, and for kitchen water heater products, the deviation is correspondingly expanded to -15% to 10%, that is, between 187 volts and 242 volts. In areas where the electricity load is relatively concentrated, it should be appropriately expanded.
-
It is recommended to install the ceiling first, and then install the water heater, because when installing the water heater, it is necessary to punch holes in the aluminum gusset to install the smoke pipe, and the smoke pipe interface also needs to be wrapped with aluminum foil tape to avoid smoke leakage into the room.
If the water heater is installed first and then the ceiling is installed, the master who installs the ceiling will not remove the smoke pipe and reinstall it, even if the ceiling master removes the punch hole and then installs it, whether he can seal the flue tightly is also a problem, there are potential safety hazards, so it is recommended to suspend the ceiling first.
Install the ceiling rib keel first, then install the gas water heater, and finally install the ceiling. The height of the gas water heater is determined by installing the suspension bar and keel first, and then the exhaust pipe of the water heater is also installed, and finally the ceiling is determined according to the installed water heater.
If the order of the two installations is reversed, there is nothing wrong with it, but it may be more troublesome to install.
Because generally when we install gas water heaters, the position of the water heater installation is closely adjacent to the ceiling, at best, there is a gap of about 10 cm between the ceiling and the water heater, which is about the same, if you install the water heater first and then do the ceiling, it is not easy to do, the position of the water heater installation will affect the construction of the ceiling, which will increase its difficulty.
Under normal circumstances, it is from top to bottom in turn, but the pipeline position of the water heater is reserved first, and the position where the ceiling is blocked generally must be installed first. Under normal circumstances, when decorating the kitchen, first install the ceiling, then install the cabinets, and then install the gas water heater, and install these before the ceiling, when the time comes, there will be a lot of things on these, which is easy to get flowers and dirty.
-
Many installers encounter this situation of the ceiling, the ventilation pipe is directly thrown on the ceiling and is not connected to the vent, at this time, check the exhaust fan function can check the suction, but in actual use can not extract the toilet moisture, remember to remember! If it is not opened, it is inconvenient to operate, and the ceiling can only be removed. Judging from the ** provided by the subject, it is an integrated ceiling, which can be disassembled and assembled.
This kind of gusset is inserted into the keel when the ceiling is suspended, and it can be removed by force downward.
After the overall decoration of the <>, the first building material in the home decoration is our integrated ceiling, starting from the kitchen and bathroom, and control the size in advance when installing the integrated ceiling! This size is generally and cabinets, sanitary ware, etc. to confirm that the ceiling height of the kitchen is subject to the strict requirements of the cabinets, the current kitchen cabinets are the overall customization, in the cabinet design will directly give the height of the later integrated ceiling, the later stage must do a good job of the ceiling, and then the cabinet can be installed, the integrated ceiling is a combination of metal square plate and electrical appliances, divided into heating module, lighting module, ventilation module, with the advantages of simple installation, flexible layout, convenient maintenance, etc., becoming the mainstream of bathroom and kitchen ceiling.
Many friends are seeing what to install when decorating, but they don't know that the decoration is also in order, and the unreasonable order will affect the process of the later decoration, and may also lead to the inability to carry out the work behind, or even dismantle and reinstall.
If the ceiling is completed in the later stage, the ceiling needs to be removed again for installation. Generally, the flue hole of the kitchen should be opened when the bricklayer is completed, and the smoke machine should be determined when the style and size are renovated in water and electricity, and the detailed size of the smoke machine should be provided when making cabinets. Therefore, when decorating, it is recommended that friends try to be careful and concerned about every detail.
-
Of course, the bath bomb is installed first, because the pipe of the bath bomb must be made, and the ceiling will be made after installation.
-
Now the decoration ceiling and bath bomb are installed at the same time, but now many families do not choose to use bath bombs, they are all warm air, and they will not be as dazzling as bath bombs.
-
Install the ceiling first, because you will know how high the bath bomb will be installed after installation.
-
Bathroom renovation is the focal point of every new home. Was it the first to install a suspended ceiling or the first to install a water heater? The answer for most renovation gurus is to install suspended ceilings first because they make it easy for them to work. Is that the case?
How about the first suspended ceiling?
For the decoration master, if the ceiling is installed first, the water heater will not hinder the smooth progress of the ceiling work, save time, and will not affect the aesthetics of the rear ceiling.
For residents, if you want to install the water heater on the ceiling, unless the construction technology of the decorator is special, you must not install the ceiling first.
Because a hole needs to be reserved for the water heater when installing a suspended ceiling, the reserved hole is usually not suitable and you will need to readjust the ceiling later. This will affect the overall aesthetic of the suspended ceiling.
Recommend. If you want to pack the water heater completely inside the suspended ceiling, the bathroom decoration will be better after installing the water heater and then installing the suspended ceiling. In this case, the position of the water heater is relatively fixed, and the gap in the ceiling does not appear too large.
Bath bombs, exhaust fans, etc. are also reasons. In particular, the ceiling of the bathroom is usually an aluminum triangular ceiling. If the fan is directly turned into the ceiling, the life of the ceiling will be shortened.
You can get it for free
-
The decoration of the home is almost fixed, there is a small place in the bathroom. This place is small, but there are many people who have a lot of kung fu. Many were tortured.
I had planned to install the ceiling and reinstall the water heater. I didn't expect a master to visit, but said that I was stupid and hurried to reload, or regretted waiting, I listened to his explanation and understood.
Because I felt that the renovation was finished, then I bought the appliances and went home, and then stayed, the steps are like this, I didn't expect that after the installation of the water heater was completed, the ceiling could be installed.
Now the renovation method has changed. Install the water heater first, then install the ceiling after the fight. Here's why.
1。The ceiling is installed behind the bathroom, where the wires and pipes are placed. Inside the ceiling, if you install the ceiling and reinstall the water heater, it will clutter up the plumbing. If we install the water heater first, then we can slowly plan the layout of the wiring and pipes.
2。If you install the ceiling first, you will need to install the water heater outside the ceiling. The house is not tall, so the installation is narrower.
So I suggest that everyone here, install the water heater and then install the ceiling, so that the water heater can be hidden, and the layout of the wiring is also planned, so that the toilet looks much bigger.
You can get it for free
Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More
In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door. >>>More
1. Aluminum gusset.
Aluminum gusset is a metal material with a painted or metal-coated surface. It can be said that it is a special top material for the kitchen and bathroom, which is easy to install and durable, and it is not expensive. >>>More
Kitchen decoration, the procedure flow is generally: water and electricity decoration embedded parts, waterproof treatment, floor tile parquet, lighting power switch comes with it, ceiling, overall cabinet, stove kitchen appliances installation. In the case of people's decoration, the first ceiling or the first installation of the cabinet order is not necessarily, some people restaurant kitchen ceiling lamp selection is the modeling roof, that is, made of paper gypsum board, this kind of top needs to be carried out first, and more people choose the integrated ceiling, the order of installation is not certain, the pursuit of each person is not the same, kitchen decoration, not the first ceiling, not the first installation of cabinets, the first decoration of the wall and pavement, is the first paste of tiles, and then paving tiles, Below are the ceilings and cabinets. >>>More