When fixing the doorway tiles, you should first clean the ground, then plaster cement and sand, and then paste the tiles on it.
-
If you want to fix the tile at the door, you can first lay a layer of cement under the tile, and then apply a layer of glue, which can play a good fixing role.
-
Generally speaking, the tiles at the door will be selected as the threshold stone, and the position of the threshold stone will be reserved for ordinary tiles, and then you can paste it like ordinary tiles.
-
Before tiling.
The copier the wall, the better, so as to increase the contact area between the cement and the wall. The specific method is to use an electric drill to drill more pits on the wall, the more the better.
When tiling, the bricklayer must be required to pull the line, supplemented by a level, no matter how good the bricklayer boasts of his craftsmanship and how good he feels, it is recommended that you still insist that he use tools to control the quality.
Generally, cement mortar can be used for load-bearing walls, but when the kitchen flue, bathroom air duct, and kitchen and bathroom are tiled on the wall covered with pipes, 108 glue must be added to the cement mortar to increase the viscosity.
To prevent hollowing, check that the tile hollowing drum can not be knocked just after pasting, it is best to wait for two or three hours before knocking, especially pay attention to the four corners of the tile. I suggest that you should knock one by one, hear the empty drum must be reworked, don't be soft-hearted, because at this time if you make do, and wait until the end of the installation of things to punch the hole in the tile you will know the harm of the hollow drum, then if you hit the tile on a corner of the corner, you will want to cry without tears.
The ground at the door of the bathroom must slope to the floor drain opening, appropriately increase the slope, and try to avoid changing the original drainage and sewage pipes and floor drain locations when the bathroom pipes are decorated, so as to avoid leakage caused by damage to the waterproof layer due to the re-discharge of pipes and chiseling the floor slab.
-
I don't think you have to smash the tiles, you should have titanium and gold sliding doors, just cut a centimeter of tiles and put them on.
But this one is ugly and the average family answers.
Decoration will not be done like this, I think it will be a little better, after all, the tiles are not very cheap.
-
Tile sleeve line to door treatment method:
1. Use three nails to fix the corner line at the installation place so that the corner line of the tile is parallel to the wall. (Note: When the corner line is fixed, reserve the space with the same thickness as the tile used to connect the corner line when the corner of the wall is paved with tiles on the other side.) )
2. Lay the tile adhesive or cement on the tile corners, paste the tiles, and keep the arc surface of the tile corners tight with the tile joints.
3. Lay the tiles on the other side, use the tiles to close the corners, and keep the contact between the corners and the tiles smooth and seamless.
4. The tile is paved, the corner line of the tile and the arc surface are wiped clean, and the installation is completed.
-
The high-grade adhesive can be glued by dot frame.
-
Deepen the original nail hole, so that you can use the extended expansion bolt (2 cm longer than the original screw), and the best screw diameter is also increased accordingly, such as the original 4 diameter, now you can use 5 diameter screws. This will allow for a secure installation.
I hope my answer can help you.
-
If you don't want to make an eye, you can use AB glue to paste.
How to install a door stopper:
1. First of all, you must confirm with the owner the installation method of the door sucker, whether it is installed on the ground or on the wall. Since this is a bathroom, the owner decided to install the door suction absorber directly on the floor tiles, leaving space behind the door.
2. The second step is to open the door to the maximum position required, test whether the door suction effect is reasonable, whether the distance of the door suction on the door is suitable for positioning the position of the door, after the general positioning, open the door, and try whether the actual operation is reasonable, including whether the door suction is a little in, or a little out, and the specific angle of the door sucker.
3. After the final position is determined, the positioning is done on the ground tiles, and the stopping position of the door is located first.
Use a pencil to confirm the position of the door on the floor tiles, and the worker master uses a pencil to draw a line on the ground, first confirm the last position of the door opening, and then confirm the last installation position of the door sucker.
4. After the door is positioned, draw the positioning position of the door sucker.
The worker master is making the mark of the last position of the door sucker, the reason why it is positioned twice, both to locate the door, but also to locate the door sucker, this is for better installation. This is the best way to confirm the angle of the door stop and the door opening.
5. The next work is to play an electric drill, and the installation hole of the door suction on the ground is drilling holes in the floor tiles, and the tiles installed by the Aijia masons are really strong enough, and this door suction only needs to drill a hole.
6. Assemble the fixed end of the door suction.
The fixed end of the door suction is being installed, tighten the screws on it, the door suction is divided into the fixed end and the door end, the fixed end needs to be tightened before installation, and then use the supplied inner angle wrench to tighten the Qi fixation on the ground or wall.
7. Fix the door suction on the ground.
After going through the procedure of confirming the position, punching and assembling, the next work is to install the fixed end on the ground, and tighten the screws on the fixed end with the included inner corner gadget, and the door suction will be automatically installed.
8. Confirm the position of the door suction at the end of the door.
As long as the door suction end on the door is tightened with screws, it is useless to install the fixed end of the door absorption, and it is necessary to install the door well, the key is the positioning of the door end, the method is to open the door to the maximum first, and then find the accurate position on the door, and tighten the door end door suction with screws.
9. Fine-tuning. Fine-tune the angle of the fixed end of the door stopper.
Then fully tightened, the last step of the door suction installation is to fine-tune, rotate the angle of the door suction so that it is all fit with the door end door suctor, and finally tighten the screws thoroughly.
-
A 15mm drill bit punches holes in the desired location, then implants the wooden block, cuts it flat with the wall, and then secures the door sucker.
This is the method I use, I wonder if it will help you? When punching, be sure to fix it before drilling.
-
If you don't want to make an eye, you can use AB glue to paste.
-
Deepen the original nail hole, so that you can use the extended expansion bolt (2 cm longer than the original Song Cong screw), and the best screw diameter is also increased accordingly, such as the original 4 diameter, now you can use 5 diameter screws. This will allow for a secure installation.
Kino and Sakura hope that my answer can help you with the hidden ruler.
-
You can use sealant to fill the gap between the nail and the wall, and then the door suction is rough and also use sealant to glue the wall, do not use silicone glue to volt, use MS glue, Greenridge's.
-
Two ways to do it:
1. Dry bonding method: first use a 15mm large core board to make the bottom frame of the door sleeve, and then paste the cut bricks on the large core board with marble glue, and the cross-head bricks at the top of the door should open a small groove, hook it with copper wire or stainless steel wire and then stick it.
2. Wet paste method: open small grooves in all bricks, hook them with copper wire or stainless steel wire, and then hang them directly on the door opening with cement mortar to make a door cover.
Refer to:
-
This kind of professional live puppet is to find a bricklayer to deal with, just communicate more in advance.
-
It's no different from the general one, as long as it's sturdy and good-looking.
-
Professional questions are best found by professionals.
-
The tiles are punched and fastened with expansion bolts, or wooden wedges are installed, which are fastened to the wooden wedges with screws.
The floor tiles and wall tiles of the bathroom have been tangled for a month, and the merchants who sold bricks have been tossed several times in the middle, either the size is not right or out of stock, and the deposit is returned, and they are tired, which god gives some advice, small apartment, no design company and no designer to draw, all rely on their own imagination, refer to a lot of Sumitomo's drawings, or can't settle down, to blow up wow, the first self-installed house, I'm afraid that the effect I want can't come out.
to commit "the first to bear the brunt."Leakage! Because once the wall leaks, it will separate the putty powder decorative layer on the wall from the wall, and finally it will be unable to withstand the attack of leakage, and it has no choice but to "part ways" with the wall! Therefore, in this case, we must first rule out the possibility that there is a rainwater pipe in the load-bearing column, if there is, then block the rainwater pipe and reinstall it on the exterior wall, if not, then find other reasons. >>>More
The mirror faces the toilet door, and when the toilet door is open, the mirror will reflect a lot of doors opposite, which is really bad. This will form a collision between the virtual and the real. Therefore, it is important to avoid this in the family. >>>More
What causes mold on the floor at the bathroom door? What to do? Because people's regular hot water will seep into the mixed mortar layer according to the tile joints, if the infiltration exceeds the evaporation of the water surface, then for a long time, the water will fill the mixed mortar layer and seep into the room according to the mortar layer. >>>More
Because it is in a damp state for a long time, it will become moldy, and only need to replace the floor to solve the problem.