How long does it take to use the toilet tiles?

Updated on Car 2024-07-03
12 answers
  1. Anonymous users2024-02-12

    Introduction: What floor tiles are used in the bathroom.

    What is the best sticker? What should I do if my bathroom is leaking? How long does it take to use the toilet floor tiles? Let's take a look at it! <>

    First, what kind of tiles to use.

    The toilet uses ceramic tiles, to consider the water absorption rate of the tile, because the toilet has high humidity all year round, so it is necessary to choose a tile with high water absorption, and judge the water absorption rate of the tile by dripping to see the diffusion degree of water droplets on the surface of the tile. Choose tiles with more glaze, because the environment of the toilet is relatively closed, if the tile is less glazed, it is easy to store stolen goods, and the smell of the toilet will become unpleasant. Regarding the color, try to choose lighter tiles for the toilet, which will make the bathroom look brighter.

    2. How long can it be used after sticking.

    If the bathroom is ventilated, it can be used for two days. If you don't ventilate, it's best to wait a few more days. It should be noted that the firmness of the tile paste mainly depends on whether the material used for the paste is dry and solid, cement mortar.

    The onset time for full cure is 72 hours later. Therefore, domestic hot water can be used 24 hours after the bathroom decoration is tiled. When laying the floor tiles, after being hammered hard by a rubber hammer, it has been mixed with the yellow sand below, and it does not move its position very much.

    Protect the tile when paving, do not scratch the brick surface and pollute the brick surface. In addition, walking around on the brick surface without drying, painting the wall, and painting the floor without using protective film are often occurring in the process of construction, which will cause damage to the tiles. <>

    3. What should I do if there is a water leakage?

    If it is water seepage on the surface of the bathroom, it is actually the leakage of the waterproof layer, which may be that the waterproof layer is not done well when the bathroom is decorated, or it may be that the waterproof layer is destroyed in the later use. But in either case, the first thing to do is whether it is surface water seepage. You can observe the bathroom floor by taking a bath or mopping the floor to see if there is water or seepage between the ground and the wall.

  2. Anonymous users2024-02-11

    It can be used at least three months later. In this way, it will not affect the effect of the tile, and it can also make the tile fully solidified, and the quality will be better.

  3. Anonymous users2024-02-10

    It's best to use them for a month or so, because it will make these tiles more sturdy and won't show any problems in the shower.

  4. Anonymous users2024-02-09

    After the floor tiles in the bathroom are pasted, they can be used after three days, and then they are completely secure.

  5. Anonymous users2024-02-08

    It will take about three months, so that the glue inside will be completely dry, and it will not affect the daily use, and there will be no warping of the floor tiles.

  6. Anonymous users2024-02-07

    After 24 hours, the cement will solidify, and you can go up and walk around, but you can't do a big move, because the cement and the floor tiles are not very firmly bonded. It's best to cool it for a few more days. Four hours later, I went up and wiped it, as long as it didn't get out of shape and didn't collapse, and there was no need to remedy it, because the cement had not yet solidified.

    The floor tiles are made of a mixture of cement and yellow sand, mainly yellow sand, with only a small amount of cement, and it is basically relatively dry, and it does not need to wait for a long time to solidify. When laying the floor tiles, after being hammered hard by a rubber hammer, it has been mixed with the yellow sand below, and it does not move its position very much. The house decoration is generally not protected for a long time before you can leave.

    It will be left to dry for a few days, and it will be more durable and will not loosen when used later. It's better to have a beautiful seam with a beautiful seam, which is better. It is best to use quick-setting cement to close the gaps in the tile gaps in the bathroom, which is more effective in waterproofing.

  7. Anonymous users2024-02-06

    Nowadays, the decoration of the home is to be pasted with tiles and floor tiles, which can protect the cement wall and floor, and it will look more beautiful, and it is more convenient to clean and maintain it daily. However, it should be noted that after the floor tiles are just laid, because they are not completely dry, they cannot be walked and stepped on immediately after they are paved, otherwise the effect of pasting will be affected. So how long do you have to wait for the freshly pasted floor tiles to be used?

    It is recommended that you walk and step on the floor tile 48-72 hours after the caulking work is completed. Under normal circumstances, the caulking work can only be carried out 24 hours after the tile is laid, and within 72 hours after the tile is pasted, it must be careful not to get wet, so as not to affect the final bonding effect of the tile.

    Generally speaking, the floor tiles can be watered after two days. Generally, two hours after the pavement is completed, the cement mortar will begin to solidify. After 48 hours we can walk on the floor tiles, but it will take 4-5 days for the floor tiles to dry completely.

    Generally, watering and maintenance can be carried out 24 hours after tiling and 48 hours under normal temperature conditions. Be careful not to use your feet during the maintenance interval.

    1. Remove the cement mortar and other foreign objects attached to the brick surface during construction in time, and always keep the brick surface clean.

    2. When other operations need to be carried out after the product paving is completed, the dust on the surface of the product should be removed with a dry mop, and no sand, sewage and other substances that damage the surface should be left. At the same time, a protective layer is applied to the surface.

    3. It is forbidden to polish the surface of the product and clean it with hydrofluoric acid and hydrofluoric acid-containing liquids.

    4. In daily use, the infiltrated stains should be removed in time. If you encounter stubborn stains, you need to clean them with a professional cleaner to prevent hard objects from damaging the surface of the tile. Do not perform other operations on tile surfaces without a protective layer.

  8. Anonymous users2024-02-05

    Look at the local climate, normally after a week.

  9. Anonymous users2024-02-04

    It is best to make the wall first, but the requirements for the DU technician are very high, because the bathroom floor should be sloped, and then it should be made special to facilitate drainage.

    As far as I know, first the floor tiles and then the wall tiles. The most standardized method of bathroom tiles is "wall tiles pressing floor tiles", that is, the bottom row of tiles of wall tiles, which should be pasted after the floor tiles are pasted, and the final paving effect is that the wall tiles press the floor tiles instead of the floor tiles press the wall tiles. The advantage of this paving is that there are not only no joints, which is visually good-looking, but also the joints are glazed with tiles, which is waterproof.

  10. Anonymous users2024-02-03

    Decoration of the rough room: water and electricity first, after the distribution of the pipeline, go to the kitchen room, bathroom balcony, waterproofing, paste the wall tiles of the kitchen and bathroom, and then the floor tiles of the whole house and the mortar leveling of the room (the room is paved with wooden floors) and other plastering work such as wall base, carpentry entry, on-site production and installation of furniture and modeling, ceiling and painting, ceiling wall scraping, whitewashing, latex paint, installation of customized wardrobes and other furniture, installation of wooden floors, installation of lamps, switches, sockets and sanitary ware, plumbing accessories, etc., and finally latex paint repair Professional sanitation cleaning OK!!

    But the specific depends on the decoration plan and content and then refine the construction sequence Hello, I am the renovation and decoration of the house, only the ceiling side is not broken wall. The original walls of the hall have been demolished below the meter, and the walls of the kitchen, dining room, and balcony have also been removed, and the wall tiles have to be pasted in these places. The walls of the room and ceiling are scraped and whitewashed with latex glue.

    As a carpenter, I only have a suspended ceiling, and I make a little partition with the hall, not a cabinet. In this case, the correct thing is how to arrange the order. Now it's done:

    The sanitation is clean, and the walls are also demolished to pave the wall tiles. Below the hall, the kitchen, dining room, and balcony were all demolished. The plumber's pipes and wires are laid quickly.

    Masons installed the door today. What's next?

    Answer: wall base mortar plastering repair, waterproof kitchen and balcony wall waterproofing treatment After pasting wall tiles, the kitchen and balcony floor are cleaned and the ground is waterproofed, and the whole house floor tiles are paved (first the kitchen, living room, and then the balcony is not adjacent to the kitchen), and then the ceiling and partition are scraped and brushed with latex paint, and electrical appliances are installed

  11. Anonymous users2024-02-02

    The bathroom is first pasted with wall tiles and then on the ground to prevent the tiles from being damaged, and the bricklayer bluntly said that he would take the money for good craftsmanship.

  12. Anonymous users2024-02-01

    Yes, but the requirements for the mechanic are very high, it is better to make the wall first, and then the floor, because the bathroom floor should be sloped to facilitate drainage.

Related questions
18 answers2024-07-03

The longer the brewing time, the better, and the second stage of the brewing soy sauce in Lake Mishiba is fermented twice, and the brewing period is as long as one year.

26 answers2024-07-03

**It is better to have children at least half a year later. Because all kinds of induced abortions require uterine suction or curettage in order to remove the embryonic tissue in the uterine cavity. During the procedure, the endometrium will be damaged to varying degrees, and there needs to be a recovery process after the surgery >>>More

8 answers2024-07-03

1 is actually very simple, after you put the dumplings into the pot, the dumplings will sink, after the water boils, the dumplings will float to the surface, then add some cold water to let the dumplings sink again, when the dumplings float again, the dumplings will be cooked >>>More

2 answers2024-07-03

Suitable for a nap after 20 minutes after eating.

After a meal, a large amount of blood flows to the stomach, blood pressure drops, and the oxygen supply and nutrition to the brain drop significantly, which will cause insufficient blood supply to the brain, and in severe cases, reflux esophagitis may occur. Don't eat too much or greasy lunch, and move for 10 minutes before napping to allow food to digest; It is best to rest for about 20 minutes before taking a nap. >>>More

31 answers2024-07-03

Herpes zoster will be painful when it is cured, because many people take medicine with infusion in the hospital**, and when they see the blisters disappear, they think they are getting better, but they are not. The pain does not decrease, or even worse, which is a clear symptom of herpes zoster neuralgia. Once the pain is found to be unrelieved, it must be replaced as soon as possible, the pain or post-herpetic neuralgia will not heal itself during the onset of the disease, and the ** of postherpetic neuralgia is to relieve pain and improve sleep, the focus is to remove the blister poison of the nerves, many people go to the hospital for infusion, but the blister poison is not in the body, but in the deep nerves, so there are many people who stay neuralgia after infusion. >>>More