There are many kinds of raw materials used in home decoration, mainly including floor tiles and waterproof materials for bathroom waterproofing. Then the problem comes, the toilet pavement is not waterproof, can it be pasted with wall tiles? According to the steps of interior decoration, the toilet must be made of waterproof materials, and then it is considered that the wall tiles are not waterproofed, and <>
Can't stick to the floor tilesToday's real estate developers will do a moisture-proof solution for toilets and restaurant kitchens before taking houses to residents, because the list of quantities for waterproofing is large, and the construction quality will inevitably be negligent, resulting in peeling and falling off the ground waterproofing. If the moisture protection is not good or the quality is weak, the water in the toilet will leak to the bottom of the building. The basement toilet is not waterproof, and the concrete cracks will crack the concrete layer over time, causing the hot water to penetrate the ground, making the toilet wet and cold, and the floor tiles will grow mold.
Although it is not easy to damage the next-door neighbor, the toilet will smell bad. The bathroom is decorated according to the order of steps, the water and electricity are reinstalled, and the damaged position of the wall must be smoothed out, for example, the wall is made of a concave groove with a hand drill, and the water and electricity decoration is done, and the outside is not smoothed with mixed mortar, how to paste the floor tiles? Even if you make do with the floor tiles, once there is a problem with the hydropower project installed in the wall, how can you repair it?
Therefore, the wall is not solved by ground leveling, and there is no way to stick the wall tilesIt is important to follow the sequence of steps. Before the toilet sticks the floor tiles, it is necessary to carry out the trial paving, the floor tile specifications and the total area of the toilet, remove the deformation joint in the middle of the floor tile, it is unlikely to close the seam tightly, which is to carry out the floor tile trial paving before pasting the floor tile, the wall and the road surface are not made of waterproof materials, and it is not very neat, there is no way to test the paving, because the wall and the road surface are uneven, the role of the test paving is not accurate, so the toilet is not waterproof, it is not possible to stick the floor tiles.
-
No, because the bathroom has to be in contact with and use water for a long time, if it is not waterproof, then it is easy to leak over time, and the tile itself has a water absorption rate, so there is no waterproof effect, so it is necessary to use professional waterproof materials to do waterproofing. The requirements of the waterproof standard for the bathroom are that the ground needs to be done all, and the wall should be at least full high, and if it is a lightweight wall, then it must be done full height.
-
No, because the bathroom is not waterproofed, it is easy to cause leakage problems in the house and downstairs after using water, resulting in certain economic and mental losses.
-
Yes, because the bathroom is particularly humid, we will take a bath in the bathroom in the future, if the bathroom is not waterproof, it will be easy to leak in the later stage, which will lead to inconvenience downstairs, and will also lead to water leakage downstairs.
-
I think that if the bathroom floor is not waterproof, it is not allowed to pave floor tiles; Because if you don't do a good job of waterproofing, it is easy to destroy these floor tiles, and it will also penetrate downstairs, causing a serious impact on the downstairs, I think you should do a good job of defense at this time.
-
In the case of interior decoration of the bathroom, the most important thing is to do a good job of water leakage, if the bathroom is not waterproof, it will be very easy to leak, will not affect their next-door neighbors at the same time, so that many community owners feel very annoyedThen, the reason for the leakage of the bathroom is expected to affect everyone. Dig up the old "odor-proof floor drain and the outer edge of the sewage pipe and the concrete floor slab", connect the anti-odor floor drain with the socket of the sewage pipeline, and then use 1:1 mixed mortar and 15% of the concrete composition of the alum stone concrete expansion agent to make up, you can.
Originally, the bathroom moisture-proof was the overall rigid waterproof, and after moving here, "use cement mortar and 20% of the concrete composition of Ming 1."Knock on the wall and floor tiles with your hands, and find that the wall is hollow, which proves that the floor tiles are not pasted well, and should be chiseled and moisture-proof. I didn't find that there were many hollow drums on the wall, and it was confirmed that the porcelain *** has a certain moisture-proof effect and a way to save it:
Use glacial acetic acid (vinegar for home use) to penetrate into the floor tiles, and then tap water laminated glass (chemical name sodium metasilicate) is constantly coated with sassafrass so that the acid meets sodium metasilicate and will reflect into a strong silicone rubber. Silicone can make up for system vulnerabilities that are likely to leak and has a moisture-proof effect.
The wall is vertical, only 1 point of the floor tile is not hollow, and the leakage problem will be dealt with after the above solution. Then, if the opposite side of the wall is not painted with Xiaobai, you can first make up for the moisture and then make Xiaobai, so that it is impossible for the other wall to cause mildew to disassemble the floor tiles, and carry out the floor tile parquet after doing the waterproof solution again.
In the order of the decoration project of the bathroom, the basic solution of moisture-proof should be carried out first, and then the floor tile veneer layer should be paved. Laying wall tiles on the ground waterproofing can improve the beauty of the wall, and the second is that it also has a guarantee effect on the ground waterproofing. If the floor tiles are not disassembled, a variety of glue or moisture-proof organic solvents are used to solve the leakage method at the interface of the floor tiles, and the potential safety hazards of water leakage can not be dealt with in essence.
-
It will lead to water leakage in the bathroom, and it will also affect the residents downstairs, making the bathroom in a damp state all day long, affecting its own quality of life, and making the later construction very cumbersome; You can stop using water appropriately, repair the putty properly, or apply some waterproofing agent to do the relevant waterproof edge treatment.
-
It may cause water leakage in the bathroom, it will also lead to cracking of the floor in the bathroom, it will lead to penetration of the floor, and it will also lead to complaints downstairs, which will affect your personal interests. The floor of the bathroom can be re-laid, and the work of floor heating must be carried out, and the work of waterproofing must be done.
-
It can cause the floor to crack, it will cause the bricks to crack directly, it will cause the floor tiles to warp, it will also cause the walls to get wet, and it will also cause some odors in the bathroom. Bathrooms can be redecorated.
-
Whether the bathroom floor can be tiled or not is not necessarily related to whether it is waterproof, that is to say, the bathroom floor can be tiled without waterproofing! However, if the bathroom doubles as a shower, or if there is a large demand for water, the floor must be waterproof!
I understand that the original intention of the subject's question is this, whether you can put tiles in your bathroom when the ground is not waterproofed. Since there are this concerns, I think the subject should have realized that in the case of no waterproofing, water seepage may occur when the tiles are directly pasted, that is, the bathroom will have a shower function or a large amount of water demand in the future. If this is really the case, it is recommended not to have a fluke mentality, and be sure to do waterproofing!
Otherwise, if there is water seepage in the future, you have to rework and make up the waterproofing, and all the tiles have to be knocked off and restarted, which is definitely a waste of money and labor! Not only should the ground be waterproof, but the bathroom with shower function should even be waterproof in the shower area, and the height should be at least higher than the shower meeting, and it is best to be able to access the roof of the bathroom, so as to ensure that nothing goes wrong!
Of course, if it is determined that the bathroom does not have a shower function or a large amount of water demand in the future, then the floor can be directly tiled without waterproofing. Because in this case, the risk of water seepage is small, and there is no need to do waterproofing for the ground, which can save a waterproofing cost and shorten a certain construction period. However, the tiled floor, especially the bathroom, gives people the first feeling that they can basically splash water directly, but they don't know that there is really the possibility of not doing waterproofing.
In this case, when using the bathroom, you must pay attention to prevent a large amount of stagnant water from remaining on the ground for a long time, and do not expect to splash water directly on the surface of the tile to achieve the purpose of quickly cleaning the bathroom, because it is likely to produce water seepage. Therefore, it is somewhat inconvenient to use a bathroom that is not waterproof!
To sum up, if the bathroom floor is not waterproof, it is best not to directly paste tiles.
-
When decorating, try to waterproof the floor of the bathroom, if you don't do it, you can also paste tiles, if you encounter water leakage in later life, it will be more troublesome.
-
I don't think so, because you have to do the waterproofing and then the tiles so that there are no leaks.
-
I think of course not, because all the decoration of the bathroom is based on waterproofing.
-
In order to ensure the quality of the floor and normal life, it is recommended to do waterproofing. Reason: If it is not waterproofed for a long time, it will cause the sewage in the bathroom to drip downstairs, causing inconvenience to the downstairs neighbors, and at the same time reducing the life of the floor.
-
Before paving the floor tiles, you have to do waterproofing, and you don't do waterproofing, but it's also a good thing to use temporarily, the water will slowly penetrate down, and it won't take long, or you live on the first floor, so it's not too much of a problem if you don't do it, or you build your own house, even if it leaks, it doesn't matter much.
-
It needs to be done, and the waterproofing needs to be done so that it doesn't cause trouble for yourself and your downstairs neighbors!
-
There are many kinds of data used for home decoration, including tiles, waterproof coatings for toilets. Then the question arises, the bathroom floor is not waterproof, can it be tiled? The answer I gave, the bathroom does not do waterproof coating, it is not able to paste tiles, according to the process order of decoration, the bathroom needs to do waterproof coating, and then tile pasting.
The bathroom is not waterproof, and it can't be tiled.
The bathroom is decorated in accordance with the process sequence, the water and electricity are reinstalled, and the damaged parts of the wall need to be smoothed, such as the wall is grooved with an electric drill, and the water and electricity are installed, and there is no smoothing cement mortar outside, how to paste the tiles? Even if the tiles are barely pasted, if there is a problem with the water and electricity installed in the wall, how can we repair it? Therefore, the wall has not been leveled, there is no way to paste tiles, and it is important to construct in accordance with the process sequence.
Before pasting tiles in the bathroom, it is necessary to carry out trial paving, tile specifications and bathroom area, remove the expansion joint in the middle of the tile, it is impossible to close the seam tightly, which requires the tile to be paved before pasting the tile, the wall and the ground are not waterproof coating, and it is not very smooth, there is no way to try to pave and paste, because the wall and the ground are uneven, and the effect of the trial paving is not accurate, so the bathroom is not waterproof, and the tile can not be pasted.
Do waterproofing three times first, and then lay the tiles.
Make waterproof coatings. When the bathroom is decorated, do three waterproof coatings, change water and electricity to the end, after the wall and ground leveling, clean up the dust, and then start to do waterproof coatings, the first waterproof evenly smooth the wall, the joints between the wall and the ground, the drain at the drain, repeatedly brush several more waterproof coatings, the wall is more than one meter high and the same waterproof three times, when taking a shower, the water will not penetrate into the opposite side of the wall, and the waterproof key parts are done well, so you don't have to worry about water seepage and leakage.
After pasting the tiles. After the waterproof coating is done three times, the tile is test-paved, for example, there is half a tile, which can be pasted on the wall, or in an invisible position in the corner of the wall. Paste the wall tiles first, after the wall tiles are solidified and dry, the floor tiles are paved from the inside out, the floor tiles are paved around the floor drain, and the tiles are cut into a zigzag pavement as much as possible, so that it looks good and will not appear to store water.
The tiles are solidified and dry, the dust in the gaps is cleaned up, and the gaps in the tiles are evenly smoothed with waterproof joints.
Tiling is carried out in accordance with the requirements.
Check the water absorption characteristics of the tiles when tiling, some tiles need to be fully soaked in water, and some tiles cannot be soaked in water. When mixing the proportion of cement mortar for mixed bonding, it is also necessary to mix according to a reasonable ratio, and the cement mortar is mixed too dry, which is easy to cause the bathroom to form floor tiles after tiling, and the mortar is not firmly bonded, and the hollow drum of the floor tiles appears.
The cement mortar is mixed too thinly, which is easy to cause the bathroom to be tiled in time after being tiled, and the floor tiles slide and extrude the mortar from the gaps, which affects the slope of the bathroom. When the mortar is plastered on the back of the tile, the whole surface is uniform, and the mortar can not be wiped only on the four sides and the center point of the tile because of the saving data, which is easy to cause the hollowing of the tile, and also has a certain impact on the force of the tile.
-
The bathroom floor is not waterproofed and cannot be tiled, which will affect future use.
-
No, otherwise it will lead to water leakage in the later stage, which will cause unnecessary troubles and disputes.
-
If the waterproof performance is too poor, it will cause the tile to be hollow or blistered, so that people will scratch their feet or fall down, and it will also affect the appearance.
It is enough to make waterproofing twice with waterproof mortar.
Toilet waterproofing (including closed water experiments) takes 3-5 days. >>>More
To do waterproofing, you need to do it on the surface of the water, and you can do it yourself. >>>More
I think totally.
During the construction of the building, the construction party has done waterproofing, that is, there is a waterproof layer when you receive the house, if you do not destroy the waterproof layer during the renovation construction, then it should be no problem. For the sake of insurance, you'd better do a closed water test, that is, use a little cement sand ash at the door to make a 5-minute high water retaining strip, and then block the water, and then the bathroom is full of water, after 24 hours to the downstairs residents to see if there is leakage, if not, you don't have to re-do waterproofing, if there is leakage, then you must re-do waterproofing, then you can only knock open the part of the floor tiles and wall tiles below half a meter, re-do the waterproof layer, and then do the closed water test, confirm that there is no problem and then re-inlay the tiles. This must be done, and it must not be too troublesome, otherwise it will be even more troublesome to find the problem after moving in. >>>More
The waterproof coating is applied coldly twice, and the second scraping direction is perpendicular to the first. The perimeter of the wall extends from the ground up to a height of not less than 30 cm.