Can the bathroom still be waterproofed after tiling?

Updated on home 2024-07-03
21 answers
  1. Anonymous users2024-02-12

    The bathroom is not waterproofed, what are the treatment methods after pasting the tiles.

    Ideas to solve the problem] Through the above analysis of the determinants of water leakage in the bathroom, we will find that the reason why the leakage toilet will leak depends on two aspects. The first aspect is that the waterproofing of the bathroom is not done well; The second aspect is that the bathroom tile gaps are not properly handled. So, we can start to solve these problems.

    Solution] The solution recommended by the individual is to deal with the gaps in the bathroom tiles. What we need to do is to ensure that the gaps in the bathroom tiles are tight, so that water does not penetrate down through the gaps. In this way, the leakage of the bathroom is fundamentally solved.

    Of course, what we can only do is this protection, then the other protection is the waterproofing of the bathroom that we can't solve. The first method can use the most common beauty joint agent at this stage to seam these tiles. The key to control here is that the tile should not be cracked after the seam is opened.

    The second method is to use a waterproof adhesive that is used to repair the cracks in the restroom. This type of glue is sold in many places, and it is very simple to operate. After cleaning the gaps, you can directly brush these glues.

  2. Anonymous users2024-02-11

    In the traditional sense, the bathroom cannot be waterproofed after tiling. But from the perspective of modern material science, it is possible to apply film on the outside of the tile and redo the waterproofing.

  3. Anonymous users2024-02-10

    The bathroom has been tiled, and there is no way to do waterproofing! Only when it was found that the bathroom was leaking again, as a last resort, it could only be planed, re-waterproofed, and re-tiled.

  4. Anonymous users2024-02-09

    After the bathroom is tiled, it can no longer be waterproofed, and there is no point in you doing it again, and. It's also not aesthetically ple Unless you do waterproofing, is it necessary to stick to the wall and sink the ship?

  5. Anonymous users2024-02-08

    First of all, use plastic bags to block the drain of the floor drain, then mix the gel-type waterproof material with water, and finally pour the prepared waterproof material on the ground and let it stand for about three hours; In this way, the paint will automatically flow into the cracks or unevenness to fill in the waterproofing layer after curing.

  6. Anonymous users2024-02-07

    No, the waterproof layer is under the tiles, and I really help you look forward to it

  7. Anonymous users2024-02-06

    Yes, use special waterproof leakage repair materials to make tile joints or pour them under the tiles to achieve the purpose of waterproofing.

  8. Anonymous users2024-02-05

    Under normal circumstances, after the hydropower renovation is completed, the ground garbage will be cleaned up, and the waterproofing can begin; When brushing waterproof, we should also pay attention to the following details: 1. Brush the pipe mouth several times, and the second time must wait for the first time to dry before brushing; 2. After brushing, start the water discharge test, and wait for the results after 48 hours, and there must be no problems in the test before construction.

  9. Anonymous users2024-02-04

    It's not that it can't be done, but the effect won't be very good, and it's best to do it before laying bricks.

  10. Anonymous users2024-02-03

    Hello, you can directly paste the tiles after waterproofing, which will make it look cleaner!

  11. Anonymous users2024-02-02

    The steps of bathroom waterproofing are: first do the wall waterproofing wall tiles, and then do the ground waterproofing 2 3 times, the curing period is 5 7 days, and the ground is covered with cement mortar protective layer and floor tiles after passing the closed water experiment.

    The waterproofing workflow of the bathroom is to level the ground with cement mortar once, and then do waterproofing after it is dry. Those owners who ask whether they can put tiles immediately after waterproofing must first make it clear that waterproofing is not just done once.

  12. Anonymous users2024-02-01

    It takes 3 to 4 days to lay the floor tiles.

    There is a curing period of about 2 days after the waterproofing is done, and after the curing period is over, it is necessary to do a closed water test, under normal circumstances, it is necessary to wait at least 3 to 4 days before the brick laying operation can be carried out. In addition, after the closed water test, if there is no water leakage, it is recommended to make a layer of waterproof protection with cement mortar on the waterproof layer before tiling, the purpose of which is to prevent the waterproof layer from being artificially damaged before or during tiling, affecting the overall waterproof effect.

    1. Choose the right waterproof material: there are two kinds of waterproofing: JS and K11, JS is flexible and waterproof is only suitable for the ground, and K11 is rigid waterproof and suitable for the wall. Make no mistake.

    2. Keep the wall clean: the wall and wall should be cleaned first, and you need to wait 3-4 days to paste the tile after the decoration is waterproof, and the tile gaps and grooves should be filled and smoothed.

    3. Draw the hair before the wall tile is paved: after the waterproof is dry, use cement to "pull the hair" before starting to paste the brick. Otherwise, the adhesion between the cement mortar and the wall will decrease due to the impermeability of the waterproof layer, which will cause the tile and the cement mortar to fall off as a whole.

    4. The wall waterproof should not be too thick: the wall tile paving must be applied with waterproof paint in strict accordance with the correct proportion, and the application should not be too thick, otherwise it will have a certain impact on the later tiling.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  13. Anonymous users2024-01-31

    No, the waterproofing is to be done at the base level, the surface layer has been completed, and the special honey with the waterproof performance can only be used to fill all the gaps in the right of the wall and floor tiles seriously, and fill all the floor drains.

    After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    Waterproof construction is a concealed project, the follow-up construction may also damage the waterproof layer, if the floor tiles have been laid, do not smash the floor tiles, with professional joint waterproof materials, all the gaps are blocked to do a good job of waterproofing. It is also suitable for waterproofing projects after the failure of the waterproof layer in the bathroom.

  14. Anonymous users2024-01-30

    You can use the construction method of non-smashing brick waterproofing agent as an example 1Add 17-20 kg of water to this product and stir to dissolve completely.

    2.Add a small packet of curing agent, the dosage is determined according to the temperature, (about half a packet in summer, pour all in winter) stir to dissolve completely.

    3.Then add the vial liquid material to increase solidification, stir and dissolve completely, increase adhesion, and increase strength.

    4.Ensure that the ground is free of water before construction.

    5.Before construction, plug the floor drain and the drained area.

    6.Pour the stirred material directly on the kitchen and bathroom floor, (note: the surface of the tile must have 1-2 cm of raw materials), and then sweep with a broom from low to high, lasting about 10-15 minutes, the longer the sweeping time, the longer the solidification time, the better the plugging effect.

    7.After the material is completely cured, the shape is jelly transparent colloid, and the residue on the tile can be exhausted with a putty knife or shovel.

  15. Anonymous users2024-01-29

    How to do waterproof after the tiles are pasted? The bathroom has a shower, a washing machine, the water consumption is large and humid, and the waterproof is not done well, and the water will leak downstairs, affecting the adjacent relationship. To decorate the house, the first thing to do is to do the waterproofing of the bathroom, and to do the water storage test to ensure safety.

    Only then can the tiling be carried out. After the bricks are pasted, they can no longer be waterproofed.

  16. Anonymous users2024-01-28

    Bathroom waterproofing can be tiled after 5-7 days, under normal circumstances, after the waterproof layer is done 2 to 3 times, there will be a curing period of 5 to 7 days, the curing period is up, we need to test whether the waterproof is good or not, leakage or not, which requires a water storage test. The water storage depth of the water storage test should not be less than 20mm, the water storage height is generally 30 100mm, the water storage time is 24 hours, and the water surface is qualified if there is no obvious drop.

    This test is generally done on the roof, bathroom or room with waterproof requirements. In the early stage of the water storage test, it should be inspected downstairs every 1 hour, and every 2-3 hours in the later stage. If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.

    If there is no leakage, the tile can be attached.

  17. Anonymous users2024-01-27

    1。First of all, the dirt on the wall should be removed. It is recommended that the wall be mixed with a clay knife and then smoothed with cement slurry, mainly to prevent hollowing after sticking bricks.

    At the same time, in order to prevent exhaust fans and install suspended ceilings, attention should be paid to the height. In addition, the dimensions of wall tiles and floor tiles should correspond to each other and should not be too different. In the end, this is correct based on the height, size, and overall effect.

    When the uniform wall tiles are different, the large bricks are pasted from the bottom up, and the small bricks are pasted from the top down.

    2。The ingredients must be adjusted according to the ratio on the instructions and stirred until the lubrication is uniform and there are no lumps or pastes. After stirring, the construction mud is static for 5-10 minutes, stirred for 1-2 minutes, and it can be used.

    Finally, scrape the freshly mixed adhesive slurry evenly onto the wall so that it is in full contact with the back of the tile. Just lay the tiles on top of it.

    What are the precautions for tiling?How long does it take for the wall to be waterproofed before it can be tiled?

    1。For most people, it is obvious that bricks need to be soaked in water before they can be laid. It is recommended to soak in water for about half an hour, so that the tiles can absorb water more fully, adhere to the cement, and lay more firmly on the wall;In addition, before laying the tiles, it is necessary to check whether the cracks need to be repaired and whether the putty powder has not been removed.

    Direct paving will cause the tiles to fall off at a later stage.

    2。When paving, it is necessary to choose the appropriate cement grade and the ratio of cement to sand. Generally speaking, the higher the cement ratio, the stronger the adhesion of the tile. However, the higher the cement mix ratio, the greater the expansion coefficient of cement mortar, and the brick is easy to crack after paving.

  18. Anonymous users2024-01-26

    After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.

  19. Anonymous users2024-01-25

    If you are not in a hurry, it is recommended that after the waterproof material dries naturally (depending on the indoor situation, generally 3-5 days), do a closed water test, do it for 48 hours, plug the funnel, and fill it with water. After 48 hours, if there is no problem, you can put the tiles.

  20. Anonymous users2024-01-24

    The waterproofing of the lightweight wall is very critical, and its requirements are relatively high, otherwise it is very easy to have problems later, according to my suggestion: do two waterproofing, first use the membrane to do a waterproofing, and then use the paint to do a waterproofing. This is a more secure approach, but also a more formal approach, if your cost is too high, I suggest you consider it comprehensively.

  21. Anonymous users2024-01-23

    1: To wait for 24 hours to test the water, the water test time is at least 24 hours, the test height is best to put the water flush with the door as well.

    2: On the surface of the waterproof layer of the wall, a layer of net cement is smeared, and the ground can be filled with light bricks or cinders, vermiculite and other things to wipe the cement leveling.

    Wait until the cement is dry before you can start tiling.

    It is best to use flexible waterproof coatings for waterproof coatings, such as: asphalt oil, asphalt membrane and so on. The kind of cement is not good, and it is easy to crack after a while. This is a very painful lesson for me.

Related questions
18 answers2024-07-03

After the bathroom is tiled, it is better to use it for a long time. >>>More

22 answers2024-07-03

Tile joints can effectively solve the problems of blackening, falling off, and peculiar smell between the gaps of ceramic tiles. >>>More

27 answers2024-07-03

To must, when the rough house comes down, the real estate developer is waterproof, but their hydropower location is not in line with their own home, generally have to carry out hydropower transformation, in the hydropower transformation of the original waterproof layer destroyed, the bathroom water consumption, the environment is humid, so the waterproof division must do, the general shower place to do 1800mm, others to do 600mm from the ground, on it.

10 answers2024-07-03

Bathroom renovation tile steps.

1. Delete the old bricks. >>>More

15 answers2024-07-03

Generally, the waterproof base layer should be 20-40cm high on the wall, and the main test scope is the place where a large number of water stains will be splashed in the rain. >>>More