  1. Anonymous users2024-02-16

    Legal analysis: The commencement report is a report on the permanent construction of the proposed project that is formally carried out by the contractor of the construction project after the contractor of the construction project applies for the construction of the project and is approved by the owner.

    Legal basis: "Law of the People's Republic of China on the Management of Urban Real Estate" Article 2 The land use right of real estate development land is obtained within the scope of state-owned land in the urban planning area of the People's Republic of China (hereinafter referred to as state-owned land in Changdong), and the land use right of real estate development land is engaged in real estate development and real estate transactions, and real estate management shall be complied with. "Houses" as used in this Law refers to buildings and other buildings and structures on land.

    The term "real estate development" as used in this Law refers to the act of carrying out infrastructure and housing construction on land that has obtained the right to use state-owned land in accordance with this Law.

  2. Anonymous users2024-02-15

    Legal analysis: prepared by the construction unit, reviewed by the supervision unit, and then reported to the construction unit.

    Legal basis: "People's Republic of China Lenient Construction Law" Article 8 to apply for a construction permit, the following conditions shall be met: (A) has been through the approval procedures for the construction project land; (B) in accordance with the law shall be handled for the construction project planning permit, has obtained the construction project planning permit; (3) Where demolition is required, the demolition progress meets the construction requirements; (4) The construction enterprise has been determined; (E) to meet the needs of the construction of financial arrangements, construction drawings and technical information; (6) Specific measures for the quality and safety of the project.

    Construction administrative departments shall, within seven days from the date of receipt of the application, the application for the issuance of a construction permit in accordance with the conditions of the application.

  3. Anonymous users2024-02-14

    Legal analysis: before the start of construction (with the conditions for the start of construction) before the sale: construction permit (provided by the construction unit), construction organization design (including the application form, approval form), construction report (construction report for review), engineering geological exploration report, construction site quality management inspection record (for review), quality personnel qualification certificate (collection and review), special type of work certificate (collection and review), measurement and pay-off (for review).

    The construction permit is issued by the construction administrative department to approve the commencement of construction documents, it has a certain legal effect of slow rock, where in accordance with this law should apply for a construction permit for the construction of the project, without a construction permit can not be started. At the same time, it also stipulates that certain conditions should be met for applying for a construction permit.

    Legal basis: Article 7 of the Construction Law of the People's Republic of China Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's ** construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

Related questions
1 answers2024-08-12

Summary. Hello! Dear, I'm glad to answer for you, the following is the main content and structure of an enterprise land application report: >>>More

5 answers2024-08-12

Construction Engineering.

Application (Registration) Time: >>>More

11 answers2024-08-12

Generally speaking, the feasibility study report of a project prepared by a professional organization should include six parts: cover, abstract, objective, body, annexes and drawings. 1.Cover: >>>More

4 answers2024-08-12

Report on the application for funds to solve road hardening County Transportation Bureau: Donghai Village is located in the karst deep mountainous area in the west of Yongkang Township, 5 kilometers away from the township, the total number of households in the village, the total population of the village, the village has cultivated land area (mu), mountain forest area (mu. All of them are Shui compatriots, living in 4 natural villages. >>>More