I don t know how to write a project completion acceptance report 20

Updated on society 2024-08-04
7 answers
  1. Anonymous users2024-02-15

    I searched for a sample article for you, I hope it can help you.

    Report of the completion inspection of the unit.

    Project Name: Building 03, Banqiao Farmers' Market.

    Construction unit: Nanjing Fengxiang real estate development****.

    Yuhuatai construction and installation engineering quality supervision station system.

    Project Overview Project Name: Building 03, Banqiao Farmers' Market Project Address: Banqiao Town.

    Type of structure Frame shear wall Hierarchy Basement 1.

    One floor above ground floor area.

    Commencement Date YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

    Acceptance and content.

    1. The information is complete, the five major responsible subjects are present to participate in the completion acceptance, the owner presides over the acceptance, and the construction unit and the supervision unit report the relevant situation of the project start.

    2. There is an error in the size of the clear height of some rooms. (Adjustments have been reviewed).

    3. The maintenance of public parts should be repaired in place as required.

    4. There is a hollow drum on the local wall.

    5. The design, survey, engineering foundation, main body, thermal insulation and energy saving meet the requirements, agree to the completion acceptance, and the construction unit is responsible for rectifying the problems found in the acceptance.

    The implementation of capital construction procedures by the construction unit.

    The construction unit implements the capital construction procedures in the process of project management, and adheres to the principle of survey, design and construction first.

    The evaluation of the survey situation The soil condition of the foundation of the project is consistent with the survey results of the survey report, and the technical data provided meet the requirements of the engineering design.

    Evaluation of the design The project meets the requirements of the design documents (including changes), design specifications and mandatory standards.

    Evaluation of the supervision situation.

    1. The project supervision department has carried out comprehensive supervision of the project in strict accordance with the "Construction Engineering Supervision Specifications", the supervision contract, the supervision plan and the supervision implementation rules.

    2. The construction quality of foundation and foundation engineering meets the requirements of design and specifications;

    3. The construction quality of the main project meets the requirements of the design and related specifications;

    4. The construction quality of water, electricity, HVAC and other installation projects meets the requirements of design and specifications, and meets the functional requirements.

    Evaluation of the construction situation.

    1. The foundation, main body, decoration, thermal insulation and energy saving of the project all meet the requirements of the design and relevant specifications.

    2. All materials of the project shall be certified and re-inspected to meet the requirements of the regulations.

    3. The management of engineering data complies with documents and relevant regulations.

    4. The management and construction procedures of the project construction site basically meet the requirements.

    5. The safety production management meets the requirements and no safety accidents occur.

    Acceptance of the quality of the project in line with the mandatory standards and design documents of the project construction, the quality assurance measures are strong, the quality management system is sound, the operation is normal, to ensure that the quality of the project to achieve good results, the overall quality of the project to meet the relevant national acceptance standards, acceptance.

  2. Anonymous users2024-02-14

    Road Completion Acceptance Report.

  3. Anonymous users2024-02-13

    It's not the same. According to the provisions of the "Measures for the Acceptance of Construction Projects": the completion report is the material submitted by the construction unit to the project construction unit after the completion of the project; The project completion acceptance report is the Qingsen Sui material submitted by the project construction unit to the administrative department of the construction project.

    The difference between the two is:

    The subjects of the report are different;

    The purpose of submission is different;

    The requirements for submission are different;

    The results of the submission are different;

    The conditions for submission are different.

  4. Anonymous users2024-02-12

    .The construction basis is briefly described in the project completion acceptance report, the project feasibility study report, the approval or plan, the task book and the approval unit and the approval number.

    2.Project Overview.

    3.the preliminary work and implementation of the project;

    4.design, construction, general contracting, construction supervision, equipment suppliers, quality supervision institutions and other units;

    5.Initial inspection and trial operation, the main conclusion of the initial inspection time and the initial inspection (the project completion acceptance report, the preliminary inspection report and the main test indicators of the trial operation should be attached, and the trial operation time is generally 3-6 months.

  5. Anonymous users2024-02-11

    The completion acceptance report is one of the materials submitted to the construction unit after the completion and acceptance of the construction unit after the completion and acceptance of the construction unit has been completed and qualified. At present, there is no unified model for all provinces and municipalities, and a simple way can be adopted. It can also be used in the ** way.

  6. Anonymous users2024-02-10

    The completion acceptance report refers to the written report formed after the completion of the project, after the special acceptance agency established by the relevant departments and the organization of experts to conduct quality assessment and acceptance. The main contents of the completion acceptance report 1, the construction according to the project plan task book and the approval unit and approval number, the approved construction investment and project budget estimate (including the revised budget estimate), the construction project lump sum agreement and other main contents. 2. Project overview (1) Preliminary work of the project.

  7. Anonymous users2024-02-09

    There are many templates for the project completion acceptance report, which are as follows: (1) Check the quality of the project entity. (2) Inspect the completion materials provided by all parties involved in the construction of the project.

    The following (3) (8) items are filled in according to the actual situation of the project) (3) Spot check and test the use function of the construction project. For example, toilet and balcony water splashing test, bathtub, water tray, pool water test, water and electricity test, sewage main ball test and insulation resistance, grounding resistance, leakage trip test, etc. (4) Summarize and discuss the completion and acceptance, and listen to the quality supervision of the quality supervision agency of the project.

    5) Form the completion acceptance opinion, fill in the "Construction Project Completion Acceptance Record Form" and "Construction Project Completion Acceptance Report", and the acceptance team members sign and the construction unit seals. (6) When serious problems are found in the acceptance process and the completion acceptance standards are not met, the acceptance team shall instruct the responsible unit to immediately rectify and declare the acceptance invalid, and re-determine the time to organize the completion acceptance. (7) When it is found that the quality problems need to be rectified in the process of completion acceptance, the acceptance team can form a preliminary acceptance opinion, fill in the relevant **, and the relevant personnel shall sign, but the construction unit shall not affix the official seal.

    The acceptance team instructs the relevant responsible units to rectify, and can entrust the project leader of the construction unit to organize a review, and after the rectification is completed and meets the requirements, the official seal of the construction unit shall be stamped. (8) When the parties of the completion acceptance team cannot form a consensus on the completion of the acceptance opinion, the solution shall be proposed through consultation, and the completion acceptance of the project shall be reorganized after the consensus is reached. When the negotiation fails, it shall be reported to the construction administrative department or the quality supervision agency for coordination and ruling.

Related questions
2 answers2024-08-04

Project acceptance inspection personnel: client: supervisors: >>>More

4 answers2024-08-04

1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance. >>>More

5 answers2024-08-04

1. The inspection batch and sub-project should be accepted by the supervising engineer (the technical person in charge of the project of the construction unit) and the person in charge of the professional quality (technology) of the project of the construction unit. >>>More

1 answers2024-08-04

1.The heat pump unit was put into trial operation on a stand-alone basis. >>>More

5 answers2024-08-04

1) After the completion of the project, the construction unit shall submit the project completion report to the construction unit and apply for the completion acceptance of the project. For the project to be supervised, the project completion report shall be signed by the chief engineer. >>>More