-
Legal analysis: 1. Construction safety production card. 2. Civilized construction card, do a good job in the enclosure of the construction site of the house demolition project.
Set up construction signs and safety warning signs in a conspicuous position at the construction site of the house demolition project, take reliable protective measures, implement closed construction 3, and implement demolition construction operations in strict accordance with national mandatory standards, construction organization design or demolition plan. Before dismantling, the power should be cut off and the natural gas should be turned off. Manual demolition should usually be carried out in a top-down and symmetrical order, and several layers should not be dismantled at the same time, and vertical cross operations should not be allowed.
The hole of the working surface should be closed. When one part is demolished, reinforcement measures should be taken first to prevent the other part from collapsing. Demolition workers Hu Chancheng construction workers must correctly wear safety helmets and other labor protection spikes to make books, work at height should fasten safety belts, and must not take risks.
4. In the process of demolition and construction work, if unknown wires (cables) and pipelines are found, the construction should be stopped, and necessary emergency measures should be taken, and the construction can only be carried out after treatment. If it is found that harmful gas overflow, flooding or personnel accidents, it is necessary to timely report to the relevant departments 5, when the demolition operation is carried out, it is strictly forbidden for personnel to gather or stack materials on the floor, and the operators should stand on a stable structure or scaffolding to operate, and the dismantled components should have a safe place to place. 6. Effective fall control measures should be taken for the demolished objects during demolition.
7. When dismantling the pipeline, the nature of the residue must be ascertained and corresponding measures must be taken to ensure safety before construction. 8. Formulate safety technology management and establish safety technology files. 9. The vehicle for removing the muck should be closed or covered, and there should be a special person to command when entering and leaving the site.
The operation time of removing and transporting the muck shall comply with the relevant regulations of the place where the project is located.
Legal basis: "Administrative Compulsion Law of the People's Republic of China" Article 44 Where illegal buildings, structures, facilities, etc. need to be compulsorily demolished, the administrative organ shall make a public announcement, and the parties concerned shall demolish them within a time limit.
-
a.A detailed description and commitment of the demolition service content.
b.On-site management and coordination of celebration measures.
c.Dismantle fund management and control measures.
d.Demolition progress management and control measures.
e.Dismantle safety management and control measures.
f.Dismantle the management and control measures for the preparation and filing of the machine.
g.On-site organization and management organization.
i.Other information.
When signing the construction contract, the construction unit and the construction unit of the demolition project shall sign a safety production management agreement to clarify the safety management responsibilities of both parties. The construction unit and the supervision unit shall be responsible for the inspection and supervision of the construction safety of the demolition project; The construction unit shall be directly responsible for the safety and technical management of the demolition project.
The construction unit shall contract the demolition project to the construction unit with the corresponding qualification level. The construction unit shall, 15 days before the start of the demolition project, submit the following information to the local people's ** construction administrative department at or above the county level where the construction project is located for the record:
1. Qualification registration certificate of the construction unit;
2 A description of the buildings, structures to be demolished and buildings that may endanger the neighbouring buildings.
3. Demolition construction organization plan or safety special construction plan;
4. Measures for stacking and removing waste.
The construction unit shall provide the following information to the construction unit:
1. Relevant drawings and materials of the demolition project;
2 Information on the distribution of above-ground and underground buildings and facilities in the area involved in the demolition project.
The construction unit should be responsible for the cutting and relocation of various pipelines that affect the safe construction of the demolition project, and when there are overhead lines or cable lines on the outside of the building, they should contact the relevant departments and take protective measures to ensure safety before construction.
When the demolition project may cause danger to the safety of the surrounding adjacent buildings, corresponding protective measures must be taken to evacuate and resettle the people in the building.
Before the demolition operation, the construction unit should check the conditions of all kinds of pipelines in the building and confirm that all are cut off before construction.
In the demolition project, if an unknown object is found, the construction should be stopped, corresponding emergency measures should be taken, the site should be protected, and the relevant departments should be reported in a timely manner.
-
First, the main process of the demolition construction process.
Construction preparation Determine the scope of demolition, set up monitoring points, take photos and archive the original appearance, cut off the original water, electricity, coal, etc. Construction safety protection (protective part sealing plate protection) Protective structure accessory number, dismantle packing, dust return lamps and lanterns, sanitary ware dismantle, interior doors and windows dismantle, wooden floors dismantle, ceiling demolition, electrical pipelines and other systems demolition, patio floor, ground floor and west hall mezzanine demolition, decorative surface layer, light steel keel partition wall, block partition wall demolition, ground reinforcing beams, floor slab powder layer chisel removal demolition, façade and roof demolition.
Second, the content of the demolition project: see the project overview for details.
3. Demolition requirements.
1.All demolition work inside and outside the building must be carried out after the design unit has made a disclosure on site.
2.The project needs to protect the key parts before the full demolition. The protected areas and parts are:
Facade, tower, main staircase, east and south foyers on the ground floor, reception showroom on the ground floor, room 601 on the original floor, and a key protected walkway on the 6th floor. The protection content is: ceilings, wall skirtings, skirting, fireplaces, cast iron railings of stairs, doors and fixed furniture in each key protection area.
The protective measures are: the blockboard package is filled with a fire blanket. For details, please refer to the Conservation and Repair Scheme.
3.The exterior wall landscape lights will not be dismantled for the time being, and will be determined after consultation with professional subcontractors after the scaffolding is erected.
4.Before the demolition of characteristic lamps, doors and windows, and hardware, count and count them layer by layer, and take photos for archiving. Assign professionals to dismantle it, number and pack it, and transport it to the company's warehouse for storage.
In the process of dismantling and transportation, corresponding measures should be taken to maintain the integrity of the components.
5.The original structure shall not be destroyed during the demolition process; The original equipment should be dismantled to pay attention to protection, and the vulnerable equipment should be removed first and stored in the special leakage of the Royal Zen Gate.
6.If you encounter a part that is suspected of being the original traces of history, immediately suspend the demolition work here, and notify the supervision, design and owner in a timely manner, and the demolition can only be continued after confirmation; If it is not clear whether it will be demolished during the on-site demolition process, the demolition can only be carried out after communicating with the design and the owner.
7.During the demolition process, the on-site lighting shall not use the power distribution lines in the demolished building, and the power distribution lines shall be set up separately.
8.Demolition schedule: This demolition area is a commercial office area, adjacent to The Peninsula Hotel to the west.
Therefore, the demolition work should be stopped as much as possible during the lunch break and at night. Workers should be properly arranged to clean up the demolition at noon and evening. Garbage transportation should be arranged during non-working hours as much as possible.
9.That is, under the premise of not affecting the safe construction, the wet operation method is adopted for the main dust link in the demolition process, and the spray method is used to reduce dust pollution.
10.Necessary temporary protection or support shall be taken to ensure the safety and stability of the retained components, and the original structure shall not be damaged, and the retained components (beams, plates, etc.) shall be supported by section steel before formal reinforcement.
-
<> house demolition construction plan is very important, the demolition process will cause safety hazards, the original intention of the plan can better solve the practical problems, every detail is critical. Zhongda Consulting will introduce the construction plan of house demolition to you.
1. Basis for compilation.
After on-site investigation, comprehensive consideration of construction safety, construction progress and other requirements, combined with our company's construction experience in this type of project for many years, the preparation of this construction organization design.
1.Construction design drawings provided by the construction party;
2.The current national norms and industry standards "Regulations on the Safety Management of Housing Demolition Engineering Construction", "Technical Specifications for the Safety of Building Demolition Projects", "Regulations on the Management of Dust Pollution Prevention and Control at Housing Demolition Construction Sites", "Regulations on the Management of City Appearance and Environmental Sanitation at the Construction Site of Urban Housing Demolition and Construction and Tourism Transportation Projects";
3.Schematic diagram of the scope of the demolition of the building (structure) provided by the construction party;
4.Other relevant professional norms and industry standards.
Second, the general situation of the project.
1.Overview of the demolished old building (structure) project.
Project location: Jiangyou Changgang General Hospital;
Structural form of building (structure): The original house is designed as a semi-frame structure, with a total of five floors; The interior design area is 66oo square meters.
2.The surrounding environment of the demolished old building (structure).
Demolition works: brick walls, cast-in-place canopies, latex paints, wall tiles, suspended ceilings, floor tiles. Due to the original design of the hospital, the original elevator as a means of transportation cannot be used, our unit will use the gantry crane as the main means of transportation for materials and dismantled objects.
Hello, for your question, for you to make the following hand answers. Opinions and Suggestions on Comprehensive Law Enforcement Work (1) Strengthen publicity and strengthen publicity, and mobilize the masses to participate in urban management and establish a good image of urban management among the masses by carrying out a variety of social publicity activities such as entering schools, units, construction sites, businesses, and communities. At the same time, more publicity and reporting should be given to the positive image of law enforcement, so as to reverse the prejudice of the masses against the comprehensive law enforcement contingent. >>>More
Don't do physical training at the age of 15.
You can still be tall. >>>More
Girls study civil engineering, generally do the budget is the most suitable, and then do design, when looking for a job in the early stage, it will be very depressed, no experience, no certificate, the general company will not want you, but as long as you can persevere, after the certificate in the future, it will slowly get better, and the construction oil and water are still quite big. >>>More
There are a lot of mandatory standards. And there are many categories.
Project 211"That is, facing the 21 st century, we will focus on the construction of about 100 institutions of higher learning and a number of key disciplines. This is a cross-century strategic project implemented by China to implement the strategy of rejuvenating the country through science and education, and it is also the largest key construction project in the field of higher education since the founding of New China. "Project 211"Since"Ninety-five"During the construction of the project, a total of 18 billion yuan was invested in the construction of a number of colleges and universities and key disciplines, and the teaching and scientific research conditions of a number of colleges and universities were improved, and a number of key disciplines have become an important base for national scientific and technological innovation and high-level talent training.