What is the procedure for the acceptance of the property takeover

Updated on society 2024-02-09
5 answers
  1. Anonymous users2024-02-05

    Summary. Hello, I'm glad to answer for you: Professional acceptance certificate:

    1. Fire Bureau acceptance report (including automatic sprinkler system test report, fire hydrant system test report, fire shutter system test report, fire door system test report, portable fire extinguisher system test report, fire positive pressure air supply and smoke exhaust system test report, linkage alarm system test report, etc.) 2. Electric sub-high orange test acceptance certificate, cabinet (plate) Li pressure Wu test certificate, relay protection test certificate, instrument test certificate, etc.: 3. Gas and alarm inspection and acceptance certificate: 4. Health and quarantine department's certificate of quarantine of living pools, equipment and water quality

    5. Certificate of inspection and acceptance of lightning protection devices for buildings and equipment and facilities;

    Hello, I am happy to answer for you: professional acceptance certificate: 1. Fire Bureau acceptance report (including automatic sprinkler system inspection report, fire hydrant system inspection report, fire shutter system inspection report, fire door system inspection report, portable fire extinguisher system inspection report, fire positive pressure air supply and smoke exhaust system inspection report, linkage alarm system inspection report, etc.) 2. Electric sub-high orange test acceptance certificate, cabinet (plate) Li pressure military inspection certificate, Relay protection test qualified cavity family certificate, instrument test qualified certificate, etc

    3. Gas and alarm detection and acceptance certificate: 4. Health and quarantine department's quarantine certificate for domestic pools, equipment and water quality sales: 5. Buildings and equipment and facilities lightning protection device inspection and acceptance certificate;

    After the project is accepted by the public housing, it is responsible for handing over the engineering products that have passed the completion and acceptance to the unit in the early stage of housing use or entrusting the property management company, and the project department and the consignee shall handle the delivery of the engineering products, fill in the "Construction and Facilities Acceptance Certificate" and "Public Site Acceptance Certificate of Building Products" and sign by the housing user, and the person in charge of the unit or property management company. The quality defects found in the handover process shall be repaired by the project department until the repair is qualified. Each project department is responsible for the completion and acceptance of the construction products that are qualified in the early stage to the property management company, and the "Public Site Acceptance Certificate of Building Products" is filled in and signed by the property management company. If quality defects are found, the property management company will timely feedback the quality assurance of the jujube plum and the maintenance unit or project department, and organize the construction unit to carry out maintenance until the maintenance is qualified.

  2. Anonymous users2024-02-04

    If you want to make the community environment better, Ken Bureau must be inseparable from the management of Wutong Cave Fuye. What are the contents of the property takeover acceptance? Let's take a look.

    Takeover acceptance refers to the takeover inspection of the quality and use function of the property subject by the property management enterprise when taking over the new property or the original property.

    Take over the content of acceptance:

    1) Property information, including all kinds of drawings, equipment technical data, warranty documents and other information.

    2) Housing construction materials.

    3) The function of using facilities and equipment.

    4) The completion of site construction.

    After the completion of the project, the first special acceptance department for the completion of the project acceptance, after the project is considered qualified, the construction unit to the construction unit for delivery procedures, this handover process is called completion acceptance, where the house has not passed the completion acceptance, can not be put into sale and put into use.

  3. Anonymous users2024-02-03

    Information to be submitted for property takeover acceptance:

    The original house takeover acceptance should retrieve the submitted information:

    1) Property right information: house repentance property ownership certificate; Land use right certificate; relevant judicial and notarial documents and agreements; Inventory of the use of houses by households; Inventory of housing equipment and fixed and attached objects.

    2) Technical data: real estate floor plan; Housing subdivision plan; Technical information on buildings and equipment.

    Information to be submitted for the acceptance of the takeover of the new house:

    1) Property right information: project approval documents; land use approval documents; building license; Demolition and resettlement materials.

    2) Technical data: as-built drawings - including a full set of drawings of general plans, buildings, structures, equipment, ancillary works and concealed pipelines; Ground damage liquid quality survey report; Project contract and commencement and completion report; Project budget and final accounts; Drawing triage records; Engineering design change notice and technical approval order (including quality accident handling records); Concealed works acceptance visa; Settlement observation record; Certificate of Completion Acceptance; Quality assurance certificate for steel, cement and other main materials; Appraisal certificate of new materials and new accessories; Inspection certificate of water, electricity, heating, sanitary appliances, elevators and other equipment; Mortar and concrete test block pressure test report; Pressure test report for water supply and heating.

  4. Anonymous users2024-02-02

    The main differences between the two are: (1) The purpose of acceptance is different: the completion acceptance is to check whether the housing project meets the requirements specified in the design documents.

    The takeover acceptance is for the re-inspection of the safety of the main structure and the use function, focusing on the perception and use. (2) The nature of acceptance is different: the completion of the inspection of the town is the best behavior.

    Taking over the face is a corporate act. (3) The acceptance conditions are different: the primary condition for completion acceptance is that all construction is completed and the equipment has been placed; The first condition for takeover acceptance is that the completion acceptance is qualified, and the ancillary equipment has been fully used normally, and the house number has been recognized.

    4) The transfer object is different: the completion acceptance is that the construction unit will hand over the property to the construction unit, marking that the construction task has been completed; The takeover acceptance is that the construction unit Yuheng will hand over the property to the property management company, marking that the property has met the use requirements.

  5. Anonymous users2024-02-01

    The difference between property management completion acceptance and takeover acceptance1. After the completion and acceptance of the new property and before the owner moves in, the property department shall set up a takeover acceptance team in time to carry out a comprehensive takeover and acceptance of the property to ensure that the property is basically qualified and meets the quality requirements of the owner.

    2. Send the leading technical personnel to live at the construction site to find out the bottom and formulate a takeover acceptance plan; Participate in the completion acceptance of the developer's application and the final installation and commissioning of mechanical and electrical equipment in advance, so as to be well informed.

    Job Responsibilities. 1. The general manager of the company is responsible for setting up a property takeover acceptance team and handling the takeover of the property with the developer.

    2. The leader of the takeover acceptance team is responsible for the quality of the work of taking over the acceptance.

    3. The takeover acceptance team is specifically responsible for the takeover and acceptance of the property in accordance with this procedure.

Related questions
5 answers2024-02-09

After the completion of the project, the planning acceptance can be carried out, and the planning acceptance conditions are: >>>More

10 answers2024-02-09

I think the most important thing for a programmer is to be able to invent a good program, a program that can run well or very well in his hands, and that he can maintain it well. <>

11 answers2024-02-09

First meeting. On-site audits.

Identify nonconformances and prepare nonconformance reports. >>>More

8 answers2024-02-09

Error file, basically useless, so don't open it.

10 answers2024-02-09

Mature....I think what you go through is what most women go through, don't take it too seriously, and if you really can't let go of it, it's better to travel outside, it's better to stay away if the funds allow! Also, I think that in any case, girls should put their bodies first, and the body is given by their parents, and they must learn to take good care of it! The one upstairs also spoke very well, and it feels very important, and I think my favorite thing is the first person I want to tell her when I meet something happy, and the first person I think of when I wake up in the morning...That's what I know as a man.