What are the main archival materials of the construction unit?

Updated on society 2024-03-12
8 answers
  1. Anonymous users2024-02-06

    Project proposal approval and report.

    Feasibility study approval and report.

    Approval and report of the plan assignment.

    Documents for construction land, land requisition, and demolition.

    Planning fixed-point opinions, planning fixed-point maps.

    Planning land permits, construction land red line maps.

    Approval and report of land acquisition and land transfer contract.

    Planning management opinions, planning management approval forms, and construction project submission reports.

    Demolition approval, demolition announcement, demolition summary table, demolition and resettlement agreement, etc.

    Survey and design documents.

    Engineering geological exploration report.

    Relevant administrative departments (environment, garden, municipal, communications, rivers and lakes, etc.) approve documents or obtain relevant agreements.

    Preliminary design approval, design (preliminary, expanded), design budget estimate.

    Design review report, design review approval letter.

    Bidding documents and market entry filing documents.

    Survey and design of bidding documents and contracts.

    Construction bidding documents and contracts (including various subcontracts), project bidding documents, and bid-winning notices.

    Direct contract application form, approval form, and notice.

    Subcontracts for pile foundations, steel structures, etc.

    Pile foundation testing contract.

    Project supervision bidding documents and entrustment contracts.

    Commencement approval documents.

    Annual plan approval and report.

    Construction project planning permits, planning red line maps.

    Construction permits, application forms.

    Project quality supervision procedures.

    Financial documents (construction budget).

    Relevant qualification documents (copies) of the construction and supervision institutions and the person in charge

  2. Anonymous users2024-02-05

    It is recommended that you ask the construction unit for a directory of archived materials, and you will understand it at a glance.

  3. Anonymous users2024-02-04

    Hello, the archival materials submitted to the urban construction archives include the following: 1. Construction technical preparation documents, including drawing and paper review records, control network setting data, engineering positioning measurement data, and foundation groove excavation line measurement data. 2. Change records of engineering drawings, including pre-sale design drawings review records, design change records, engineering negotiation records, etc.

    3. Foundation treatment records, including foundation brazing records and ridge matching brazing plane layout points, groove inspection records and foundation treatment records, pile foundation construction records and pile test records, etc. 4. Quality certification documents and retest test reports of prefabricated components of construction materials. 5. Construction test records, including soil test records, mortar concrete compressive strength test reports, commercial concrete factory certificates and retest reports and steel joint welding reports.

    6. Construction records, including engineering positioning measurement records, settlement observation records, on-site construction prestress records, project completion measurements, new building materials and new construction technologies, etc. 7. Concealed engineering inspection records, including foundation and main structure reinforcement engineering, steel structure engineering, waterproof engineering and elevation measurement records. 8. Records of engineering quality accident handling.

  4. Anonymous users2024-02-03

    Relevant departments and units directly under the municipal government, and county and municipal construction committees:

    In order to do a good job in the archiving of technical documents of construction projects, according to the spirit of the relevant documents of the Ministry of Construction and the relevant provisions of the Interim Regulations on Construction Management of Weihai City. The following requirements are now made for the specific content of the documents and technical data archiving after the completion of the construction project:

    1.Construction license, commencement report.

    2.The review records of construction drawings of various specialties (civil engineering, plumbing, electrical, ventilation, etc.).

    3.Design Change Orders.

    4.The contact sheet between the construction unit and the construction unit.

    5.Engineering positioning measurement and pay-off record.

    6.Records of the review of the bearing capacity of the foundation (or piling records).

    7.Observation records of settlement and deformation of buildings and structures.

    8.Cement factory quality certificate and inspection report.

    9.Steel factory quality certificate and test report.

    10.Metal welding test report and proof of use of welding rod.

    11.Red brick appearance certificate and test report (compression test and frost test).

    12.Sand and slurry strength test report.

    13.Concrete test mix ratio and strength test report.

    14.Waterproof, thermal insulation material appearance certificate, test report.

    15.The factory certificate of the components and accessories is adopted.

    16.Concealment (hoisting) engineering acceptance record.

    17.Plumbing, equipment pipeline test adjustment, pressure test record.

    18.Electrical grounding resistance and insulation resistance test records.

    19.Engineering quality accident handling data.

    20.Itemized project quality assessment form.

    21.Unit project quality assessment form.

    22.Certificate of completion and acceptance of the project.

    23.Proof of project delivery and acceptance.

    24.As-built drawings of the project. The original construction drawings have not changed much and do not affect the quality of the project. If there is a change description, a change drawing, and the construction unit stamps a special seal on the cover of the drawing, and the technical person in charge signs it, it can also be used as the as-built drawing.

    1.Construction organization plan and construction experience summary.

    2.The unit in the construction of new technologies, new materials, new machinery and other experimental research data, construction methods of the special experience summary.

    3.Handling measures and results of major construction quality and safety accidents.

    4.Technical measures assurance, safety, quality measures disclosure records.

    5.All kinds of concrete, mortar, special concrete, chemical anti-corrosion ratio data.

    6.Records of important technical decisions and implementation of imported technologies.

    7.Construction logs.

    8.Winter construction, rainy season construction measures, winter construction temperature measurement records.

    The content of the above two aspects of the construction unit should be carefully sorted out according to the requirements after the completion of the project. Handover or archiving as required.

  5. Anonymous users2024-02-02

    Summary. Hello dear; We are glad to answer your questions about [what unit is responsible for the building data filing file box, and what is the transfer unit?] 】:

    If the transfer unit is completed and handed over to the construction party, the physical objects and materials shall be handed over to the construction unit together. The responsible person, the construction document volume, the completion of the first volume, the completion of the acceptance document volume of the three volumes of the responsible person is the construction unit; The person responsible for the supervision of the document volume is the supervision unit; The person responsible for the project preparation document volume is the construction unit; The person responsible for the general volume is the construction unit.

    What is the responsible unit on the building data archiving file box, and what is the transfer unit?

    Hello dear; We are glad to answer your questions about what is the single stall of the person responsible for the filing of the file box and the transfer unit? Problem: If the transfer unit is completed and handed over to the construction unit, the physical objects and materials will be handed over to the construction unit.

    The responsible person, the construction document volume, the completion of the first volume, the completion of the acceptance document volume of the three volumes of the responsible person is the construction unit; The person responsible for the supervision of the document volume is the supervision unit; The person responsible for the project preparation document volume is the construction unit; The person responsible for the general volume is the construction unit.

    Hello dear; Expand your knowledge as follows: the scope of archiving of engineering documents.

    1. The important activities related to the construction of the project, the documents that record the main process and status quo of the construction of the project, and the various carriers with preservation value should be collected and filed after being sorted out and filed. Second, the specific scope of the engineering documents should meet the requirements of the lower chamber directory: 1, the project preparation stage documents see Appendix 2, the completion acceptance documents of the construction project see Appendix 3, the municipal infrastructure project completion acceptance documents see Appendix 4, the construction and installation engineering construction documents are divided into pile foundation, civil engineering, water supply and drainage, electrical, curtain wall, elevator, steel structure respectively see the appendix, the completion drawings of the construction project see Appendix 5, the municipal infrastructure engineering construction documents see Appendix 6, See Appendix 7 for the completion drawings of municipal infrastructure projects, and see Appendix for supervision documents.

  6. Anonymous users2024-02-01

    Hello, happy to answer that question for you! The functional department responsible for the archiving and management of construction engineering data is the archives management department of Chenglv Qinzaijian. For a construction project, archiving has three meanings:

    1) Construction, survey, design, construction, supervision and other units will be formed in the process of project construction of the unit to the archives management agency of the unit to hand over; (2) Survey, design, construction, supervision and other first Xun units will transfer the documents formed by the unit in the process of project construction to the archives management agency of the construction unit; (3) In accordance with the requirements of the current "Code for Archiving and Sorting of Construction Project Documents" (GB T 50328-2001), the construction unit shall transfer the summary of the construction project documents and archives to the local urban construction and demolition archives management department.

  7. Anonymous users2024-01-31

    Generally speaking, the archiving of construction engineering data refers to the submission of construction engineering data to the archives for archiving, which is mainly based on the archiving catalogue and requirements formulated by the archives.

    But now it is mainly in the construction process of data collection and sorting, we in Hubei is mainly in accordance with seven categories of archiving, management data, technical data, measurement data, construction record data, material data, test data, inspection and evaluation data. to file them separately.

  8. Anonymous users2024-01-30

    Page 1 of 2.

    1. Foundation and Foundation Division.

    1. Raw material application form.

    2. Acceptance report (form) of the foundation division project

    3. Groove inspection record of foundation.

    4. Engineering positioning survey, construction survey, pay-off inspection.

    5. Mortar mix ratio inspection.

    6. Concealed engineering inspection.

    7. Steel bar welding inspection and inspection.

    8. Summary and evaluation of the strength of concrete and mortar test blocks.

    9. Concrete construction diary.

    10. Divisions, subdivisions, and sub-item summaries.

    11. Earthwork excavation and backfill inspection batch inspection.

    12. Cement mortar waterproof layer inspection batch inspection.

    13. Concrete foundation related inspection batch inspection.

    14. The relevant inspection batch of masonry foundation is submitted for inspection.

    Second, the main structure of the division.

    1. Raw material application form.

    2. Acceptance report (form) of the main structure project

    3. Report on the compressive strength of concrete detected by rebound method.

    3. Construction surveying and pay-off inspection.

    4. Mortar mix ratio inspection.

    5. Concealed engineering inspection.

    6. Steel bar welding inspection and inspection.

    7. Summary and evaluation of the strength of concrete and mortar test blocks.

    8. Concrete construction diary.

    9. Divisions, subdivisions, and sub-divisions.

    10. Concrete structure related inspection batch inspection.

    11. The inspection batch related to the masonry structure is submitted for inspection.

    3. Decoration Division.

    1. Raw material application form.

    2. Divisions, subdivisions, and sub-divisions.

    3. The relevant inspection batch of the ground sub-division is submitted for inspection.

    4. The relevant inspection batch of the plastering subdivision is submitted for inspection.

    5. The relevant inspection batch of the door and window sub-division is submitted for inspection.

    6. The relevant inspection batch of the lightweight partition wall sub-division is submitted for inspection.

    7. The relevant inspection batch of the coating sub-division is submitted for inspection.

    Fourth, the building roof division.

    1. Raw material application form.

    2. Divisions, subdivisions, and sub-divisions.

    3. The relevant inspection batch of the waterproof layer sub-division of the membrane is submitted for inspection.

    5. Water supply and drainage division.

    1. Raw material application form No. 2

    Page of 2.

    2. Relevant test records**.

    3. Division, sub-division, and sub-item summary.

    4. The relevant inspection batch of the sub-division of the indoor water supply system shall be submitted for inspection.

    5. The relevant inspection batch of the sub-division of the indoor drainage system is submitted for inspection.

    7. Building Electrical Division.

    1. Raw material application form.

    2. Relevant test records**.

    3. Division, sub-division, and sub-item summary.

    4. The relevant inspection batch of the outdoor electrical sub-division is submitted for inspection.

    5. The relevant inspection batch of the sub-division of the power supply trunk line is submitted for inspection.

    6. The relevant inspection batch of the electrical lighting installation sub-division shall be submitted for inspection.

    7. The relevant inspection batch of lightning protection and grounding installation sub-division is submitted for inspection.

    8. Information on the early stage of construction.

    1. Commencement of construction application, construction enterprise qualification and management personnel application form.

    9. Completion acceptance data.

    1. Closed water test of roof and bathroom.

    2. Observation records of building settlement and large angle tilt.

    3. Report of the five parties and the completion acceptance opinion form.

    4. Unified table

    5. Intermediate acceptance report (construction, supervision) of foundation and foundation and main structure 6. Completion acceptance report (construction and supervision).

    7. As-built drawings (full set).

    8. Rectification and reply to the minutes of the completion acceptance meeting.

Related questions
7 answers2024-03-12

There are dozens of phyla of marine animals, which can be divided into two categories: marine invertebrates and marine vertebrates, or three categories: marine invertebrates, marine protochordates and marine vertebrates.

29 answers2024-03-12

Vitiligo leukoplakia is mostly the size of the nail to the coin, nearly round, oval or irregular, there are also punctate subdiscolored spots at the onset, the realm is more obvious, some edges are wrapped around the pigment band, if the sun is exposed to the sun for a long time, the vitiligo will be red, after getting vitiligo, the patient should go to a regular hospital for examination as soon as possible**, do not delay the condition.

7 answers2024-03-12

1. Critics.

The criticism school originated in the middle of the Ming Dynasty, with Jin Shengsi's criticism of "Water Margin", Mao Zong's criticism of "Romance of the Three Kingdoms", and Zhang Zhupo's criticism of "Journey to the West". >>>More

1 answers2024-03-12

Meets v?What am I saying in front of you

12 answers2024-03-12

It has symptoms such as hypertension, hematuria, proteinuria, edema, etc., and the condition is progressive and easy to reverse. Chronic nephritis with the different diseases**, the development of the disease and symptoms are not the same, usually there will be decreased immunity, susceptibility to colds, susceptibility to infection, nausea and vomiting, general fatigue, abdominal distension and other symptoms, but also cause hypertension, anemia and other complications, and even cause chronic kidney failure, and eventually lead to uremia. At the same time of regular Western medicine**, it is recommended to take Lingleoca multibacterial powder composed of Poria cocos, Cordyceps, white fungus and Zhu Ling to solve the disadvantages of Chinese and Western medicine in treating the kidney and hurting the kidney. >>>More