-
After the bathroom is tiled, it is better to use it for a long time.
If the bathroom is ventilated, it can be used for two days.
If you don't ventilate, it's best to wait a few more days. If you don't, it's a blank post.
The onset time for full cure is 72 hours later. Therefore, domestic hot water can be used 24 hours after the bathroom decoration is tiled.
Floor tiles. The following is a mixture of cement and yellow sand, mainly yellow sand, only a small amount of cement, and basically dry, do not need to wait for a long time to solidify.
When laying the floor tiles, after being hammered hard by a rubber hammer, it has been mixed with the yellow sand below, and it does not move its position very much. Protect the tile when paving, do not scratch the brick surface and pollute the brick surface.
Walking around on the brick surface that does not dry and solid, painting the wall, and painting the floor without using protective film are often occurring in the process of construction, which will cause damage to the tiles.
-
Generally, it takes 5-7 days to put tiles after the completion of water and electricity. Because it takes another five to seven days after waterproofing, tiles can only be applied after the waterproofing is fully cured. After the waterproof construction is completed, it is generally necessary to wait for the waterproof material to be completely cured before tiling, and the time required for the waterproof material to be completely cured generally takes about five to seven days.
The specific curing time generally needs to be determined according to the toilet area, structure, and quality of waterproof materials.
Decoration: Decoration is also known as decoration or decoration. It refers to a set of construction plans and design schemes carried out in a certain area and scope, including hydropower construction, walls, floors, ceilings, landscapes, etc., and formed according to certain design concepts and aesthetic rules.
From the placement of furniture and the orientation of doors, to the customization of room accessories and lamps, they are all the embodiment of decoration. Decoration is different from decoration, decoration is the artistic processing of daily necessities or living environment. Enhance the aesthetic effect and improve its functional, economic value and social benefits.
-
The tiles generally dry in 2-3 days.
Precautions for tiling:
1. The tiles are soaked in water on demand.
Wall tiles generally need to be soaked in water before paving, and the tiles that have been soaked in water affect the secondary sales, and the manufacturers or merchants generally cannot return them, which will cause unnecessary waste. Suggestion: To combine the construction progress of the workers, how much you need to soak, don't soak it all at once.
2. Make a plan for arranging tiles before paving.
Some construction workers paved as soon as they got the bricks, and only found that the proportions were not coordinated when they were paved to a certain extent, and then removed and re-paved, resulting in unnecessary loss and waste. Suggestion: Make a plan for paving bricks before paving.
3. Remind workers to notify in time if they find tile problems.
Don't wait until the paving is done to find out the problem, causing the construction party and the material party to pass the buck to each other. Suggestion: Clearly tell the workers before construction, and notify them in time when they find ceramic tile quality problems, so that they can ask the material party and the construction party to identify and solve the problem together.
4. Correctly mix the mixing ratio of cement and sand.
The proportion of cement is large, and the bricks can be quickly sticked, but the expansion coefficient of cement mortar is large, and it is easy to squeeze the bricks after paving. Suggestion: The mixed ratio of cement and sand is 1:3 for wall tiles, 1:2 for floor tiles, and cement for cement.
5. Be careful in tile processing.
Especially when the wall tiles touch the sunny corner, be careful not to destroy the glaze layer of the tiles, and pay attention to the gaps when connecting, not too small. Some tiles that need to be cut are better, and they can be delivered after being cut by the material dealer when they are purchased.
-
20 minutes – ranging from an hour. The speed of tile glue drying is relatively fast, and the specific degree depends on the thickness of the glue. If the glue is relatively thin, it usually takes about 20 minutes to dry.
If the glue is thicker, you may have to wait for an hour or more.
-
Depending on the ventilation conditions and temperature, it takes fifteen days for normal condensation. It takes a month to dry out.
-
Generally, the floor tiles are wet paved with cement mortar, and the floor tiles can be completely dried after 5-7 days after being pasted in summer, and it generally takes 15-30 days in winter.
-
It takes about a week in the summer and a month in the winter. Depending on room ventilation, temperature, humidity, let's treat it specifically.
-
It can be used at least three months later. In this way, it will not affect the effect of the tile, and it can also make the tile fully solidified, and the quality will be better.
-
It's best to use them for a month or so, because it will make these tiles more sturdy and won't show any problems in the shower.
-
After the floor tiles in the bathroom are pasted, they can be used after three days, and then they are completely secure.
-
It will take about three months, so that the glue inside will be completely dry, and it will not affect the daily use, and there will be no warping of the floor tiles.
-
Bathroom waterproofing can be tiled after 5-7 days, under normal circumstances, after the waterproof layer is done 2 to 3 times, there will be a curing period of 5 to 7 days, the curing period is up, we need to test whether the waterproof is good or not, leakage or not, which requires a water storage test. The water storage depth of the water storage test should not be less than 20mm, the water storage height is generally 30 100mm, the water storage time is 24 hours, and the water surface is qualified if there is no obvious drop.
This test is generally done on the roof, bathroom or room with waterproof requirements. In the early stage of the water storage test, it should be inspected downstairs every 1 hour, and every 2-3 hours in the later stage. If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.
If there is no leakage, the tile can be attached.
-
1。First of all, the dirt on the wall should be removed. It is recommended that the wall be mixed with a clay knife and then smoothed with cement slurry, mainly to prevent hollowing after sticking bricks.
At the same time, in order to prevent exhaust fans and install suspended ceilings, attention should be paid to the height. In addition, the dimensions of wall tiles and floor tiles should correspond to each other and should not be too different. In the end, this is correct based on the height, size, and overall effect.
When the uniform wall tiles are different, the large bricks are pasted from the bottom up, and the small bricks are pasted from the top down.
2。The ingredients must be adjusted according to the proportions on the instructions and stirred until the lubrication is uniform and there are no lumps or pastes. After stirring, the construction mud is static for 5-10 minutes, stirred for 1-2 minutes, and it can be used.
Finally, scrape the freshly mixed adhesive slurry evenly onto the wall so that it is in full contact with the back of the tile. Just lay the tiles on top of it.
What are the precautions for tiling? How long does it take to tile the wall after waterproofing?
1。For most people, it is obvious that bricks need to be soaked in water before they can be laid. It is recommended to soak in water for about half an hour, so that the tiles can absorb water more fully, adhere to the cement, and lay more firmly on the wall; In addition, before laying the tiles, it is necessary to check whether the cracks need to be repaired and whether the putty powder has not been removed.
Direct paving will cause the tiles to fall off at a later stage.
2。When paving, it is necessary to choose the appropriate cement grade and the ratio of cement to sand. Generally speaking, the higher the cement ratio, the stronger the adhesion of the tile. However, the higher the cement mix ratio, the greater the expansion coefficient of cement mortar, and the brick is easy to crack after paving.
-
After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.
-
If you are not in a hurry, it is recommended that after the waterproof material dries naturally (depending on the indoor situation, generally 3-5 days), do a closed water test, do it for 48 hours, plug the funnel, and fill it with water. After 48 hours, if there is no problem, you can put the tiles.
-
The waterproofing of the lightweight wall is very critical, and its requirements are relatively high, otherwise it is very easy to have problems later, according to my suggestion: do two waterproofing, first use the membrane to do a waterproofing, and then use the paint to do a waterproofing. This is a more secure approach, but also a more formal approach, if your cost is too high, I suggest you consider it comprehensively.
-
1: To wait for 24 hours to test the water, the water test time is at least 24 hours, the test height is best to put the water flush with the door as well.
2: On the surface of the waterproof layer of the wall, a layer of net cement is smeared, and the ground can be filled with light bricks or cinders, vermiculite and other things to wipe the cement leveling.
Wait until the cement is dry before you can start tiling.
It is best to use flexible waterproof coatings for waterproof coatings, such as: asphalt oil, asphalt membrane and so on. The kind of cement is not good, and it is easy to crack after a while. This is a very painful lesson for me.
-
The waterproofing workflow of the bathroom is to level the ground with cement mortar once, and then do waterproofing after it is dry. Ask friends who can paste tiles immediately after waterproofing, first of all, we must make it clear that waterproofing is not just done once. The general waterproof construction should be done 2 to 3 times, and the order of waterproofing is also particular, for example, the wall should be waterproofed first and then the wall tiles should be pasted, and then the ground waterproofing should be done and then the floor tiles should be pasted.
Because the ground is often stepped on, the ground waterproof will be easy to step on if you do it first.
So when should the floor tiles be pasted after the waterproofing is done?
Under normal circumstances, after 2 to 3 times of waterproofing are all done, there will be a curing period of 5 to 7 days, so naturally, tiling must wait until after this to do.
But there are no absolutes, the curing period is up, we also need to re-test whether the waterproofing is done well, whether the leakage is leaking, which requires adding water to test for 24 hours to see if the ground water level at home has dropped, or to see if there are traces of water leakage in the downstairs neighbor's bathroom.
If there is no water leakage, then remember to use another layer of cement mortar to do a layer of waterproof protection, the purpose of which is to prevent the friction of the tiling work from damaging the surface of the waterproof layer. But if it still leaks, it means that the waterproofing has not been done thoroughly, and the waterproofing needs to be redone. Follow the first process and wait for it to dry and test, and you can lay the floor tiles without problems.
The floor tiles and wall tiles of the bathroom have been tangled for a month, and the merchants who sold bricks have been tossed several times in the middle, either the size is not right or out of stock, and the deposit is returned, and they are tired, which god gives some advice, small apartment, no design company and no designer to draw, all rely on their own imagination, refer to a lot of Sumitomo's drawings, or can't settle down, to blow up wow, the first self-installed house, I'm afraid that the effect I want can't come out.
Tile joints can effectively solve the problems of blackening, falling off, and peculiar smell between the gaps of ceramic tiles. >>>More
In order to avoid unnecessary trouble later, there are also bathrooms in addition to paving floor tiles The wall should also use tiles, because this is to prevent water from directly touching the wall, which is also a kind of protection for the wall.
OK. Waterproofing is actually best done at the end. The last thing to do is to be able to test the waterproofness completely.
How to match bathroom tiles What color is good? What color is better for bathroom tiles? In fact, in the process of bathroom decoration, there are certain requirements for the color of its wall tiles, and it is recommended to choose light-colored series of bathroom tiles, which will feel cleaner in this color. >>>More