I have worked on a drilling platform, with a high degree of automation, generally divided into semi-shallow platforms (generally larger, more equipment, and more staff), which are floating at sea, generally operating in the deep sea area, and the sea depth is more than 1000 meters; The most common is the jack-up drilling platform, medium size, generally standard for about 100 people, divided into drilling module, engine room, main deck, living area, and apron. This kind of platform is generally fixed on the seabed by three pile legs, with different sea depths, can be raised, generally common 300 feet, 400 feet (refers to the maximum height of the pile legs), of course, the height of the pile legs determines that the sea depth of his operation can not exceed 300 feet, 400 feet. There are generally two types of work on the drilling platform:
Driller, drilling captain, supporting mud analyst, logging, logging, crane operator, etc., also equipped with electrical room, mechanic.
These people are mainly responsible for the operation and maintenance of drilling and drilling-related equipment, etc., and there is a large category of life, cooks, cleaners, doctors (the most idle occupations), captains, life captains, safety officers.
Wait. Of course, the general staff changes shifts according to different countries, and the time of shift change is also different, and the Bohai Sea in China generally changes shifts every 20 days, and rests for 20 days after returning, the Middle East.
There is generally divided into large shifts and small shifts, small shifts are generally 2 weeks a week, large shifts are 4 weeks a week, more tired types of work are generally small shifts, only a few staff are large shifts, to put it bluntly, idle occupations are long shifts, (may also be because these occupations are more scarce in the field), there is also a possibility that these people are far away from home, but also apply for large shifts. Usually life is no different from land, on the ship, the space is limited, but it is still relatively complete, canteen, smoking room, TV room, gym, etc. The work is generally in two shifts.
The engineers of the on-site manufacturers in the past (these people are mainly responsible for the maintenance of the supplied equipment, teaching, etc.) generally go up for 1 week to 2 months according to the workload involved, they do not work shifts, and generally deal with problems when there is a problem, and sleep and stay up if there is no problem. That's pretty much it. <>
-
Summary. Thank you for your patience and happy to answer for you. Offshore drilling platform recruitment is fake, such a large-scale online recruitment must be unreal, after paying the fee must be a kind of reasons and excuses, not to say that the delay in arranging work and training, or other reasons have been dragging on not accepting things Even if the professor's lies are extremely limited, large-scale recruitment on the Internet to recruit people to be cautious, basically people with ulterior motives use the name of some companies to recruit or find people to cooperate.
Hello dear, please be patient and wait a few minutes, because I am manually entering may delay you for a few minutes, please understand.
Thank you for your patience and will be happy to answer your questions. Offshore drilling platform recruitment is fake, such a large-scale online recruitment must be unreal, after paying the fee must be a kind of reasons and excuses, not to say that the delay in arranging work and training, or other reasons have been dragging not to accept the east move quietly, even if the professor's lies are extremely limited, large-scale recruitment on the Internet to recruit people to charge must be cautious, basically people with ulterior motives use the name of some companies to recruit or find people to cooperate.
I hope the above can help you, I wish you a happy life, if the answer you are still satisfied, the trouble will be blind Jane at the end of the friendly words kiss a like, thank you, <>
Your praise is the greatest affirmation of me) <>
-
1. It is the same as drilling on land, there is no big difference, and whether you are tired or not depends on the nature of your work and the content of your work.
2. In China's Bohai Bay.
region, there are victories, big ports.
Eastern Hebei, Liaohe.
Four oil and gas fields. After decades of exploration and development of onshore oilfields, the oil and gas exploration area is gradually extending from land to sea, and the shallow sea of Bohai Bay has become a new reserve position for oil and gas resources in various oilfields in eastern China. However, in order to carry out drilling operations in shallow seas and extremely trembling shallow sea areas, the most important thing is to solve the problem of equipment for shallow sea drilling.
Shallow sea drilling is different from both land and deep sea, especially the shallow sea in Bohai Bay has its particularity. Although the shallow sea water in Bohai Bay is not deep (0 15m), the sea conditions are complex and the wind and waves are strong. The oil drilling platform used in the deep sea cannot enter due to the shallow water, and the drilling platform with shallow draft imported from abroad cannot meet the requirements of shallow sea drilling in Bohai Bay due to its ability to resist wind and waves.
To this end, in the 80s of the 20th century, China designed and manufactured a bottom-sitting drilling platform suitable for the characteristics of the shallow sea area of Bohai Bay.
3. The platform is an amphibious walking bottom-sitting drilling platform, which is a double-body drilling platform composed of inner and outer bodies. The inner and outer bodies are connected by the platform locking device, and after the locking device of the inner and outer bodies is disconnected, a walking mechanism and hydraulic system can be used.
Realize the drilling platform before walking into the oak oak. When walking, it is like walking on two feet, first lifting the outer body to advance 10 meters and then falling, and then lifting the inner body.
Advance 10 meters and so on to complete the platform's walk on the shallow beach. All drilling equipment, operating well sites, living facilities, hydraulic stations, etc. are installed on the deck of the inner body of the drilling platform, and the outer body of the platform is installed with walking tracks and various marine equipment. China's self-developed Shengli No. 2 drilling platform is the world's first extremely shallow sea walking bottom-type drilling platform, it has a unique amphibious performance, in the sea can float and tow, in the shallow sea less than 7 meters sitting on the bottom of the sea for drilling, after the drilling is completed, it can float and displace, and can still move forward on foot after the flat seabed stranding in the extremely shallow sea, and can cross the small trench.
and walking on shallow tidal flats, it is a steel giant walking slowly on a shallow beach.
-
"There are many kinds of offshore platforms: drilling platforms (also known as drilling ships), oil production platforms (manned, unmanned), life support platforms, power platforms, etc., as well as various ships, tugboats, three-purpose work boats, floating cranes, pipe-laying ships, etc., and there are many more in the Bohai Sea. If you're talking about the type of work of offshore platform personnel, it's also a lot:
Generally, it is divided into operation majors, mainly operators, maintenance professionals, mechanical and electrical instrument workers, safety supervision of safety professionals, sailor classes for official business, logistics cleaning, cooks, etc.
1. Under the leadership of the squad leader, conscientiously implement the company's safety trace rental production instructions, and be responsible for the equipment and materials of the post. 2. Strictly abide by the company's rules and regulations, do not operate in violation of regulations, strengthen equipment inspections, and do a good job in safety precautions.
-
Main work. 1) Operate drilling equipment, instruments, meters, etc. to carry out drilling, drilling, drilling, coring, casing and other operations;
2) Operation and maintenance of diesel engines for drilling;
3) Collect rock samples from drilled formations and describe, classify, and fill in rock sample labels;
4) Formulate, use and maintain drilling fluid, observe and record mud performance changes and oil and gas display conditions;
5) Operate drilling rigs and blowout prevention facilities for blowout prevention and rescue;
5) Record parameters such as drilling pressure, penetration rate, rotation speed, footage, well depth, drilling efficiency, pump pressure, mud consumption, etc., and fill in the drilling production report.
-
What is it like to live there when an offshore drilling platform is fixed on the sea all year round? There is a lot of hard work and dedication, so it is impossible for ordinary people to understand, now I will give you a specific explanation, friends can refer to:
First, the work of the offshore drilling platform will be very boring and lonely:
The work of offshore drilling platforms is very important, because offshore resources are very important to the country, and most of the oil and natural gas resources need to be met by marine work. There are many offshore drilling platforms in China, and it is also one of the countries with the best technology, but these achievements are the hard work of the staff to have such a harvest. There are only staff on the offshore drilling platform, and life is very boring, because there is no communication with relatives, so life will definitely be very lonely.
Some people have been interviewed for offshore drilling platform work, because there is no network signal, so it will be very difficult for them to contact their families, so everyone can only encourage each other to forget loneliness in their work, so some people in these jobs are very hard, and their efforts are beyond the imagination of ordinary people, and they deserve our respect.
Second, the food is relatively monotonous, and life is very hard
Life on an offshore rig is not only monotonous and lonely, but also very hard, because the offshore rig needs to be constantly maintained, and there is a lot of work to be done every day, so the work is more tiring. At the same time, due to the difficulty in supplying food for offshore drilling platforms, the food for the staff is relatively simple, so they need to stick to it. The single food will cause the life of the staff to be difficult, which is a test for the staff of the offshore drilling platform.
3. Without any entertainment facilities, people's emotions cannot be vented
-
Personally, I think it must be a very beautiful thing to live there, to be able to be with the sea every day, to get up in the morning to watch the sunrise, and to be able to see the sunset at night, the scenery must be very beautiful.
-
The offshore drilling platform is very huge, just like a small city on the sea, and there is not much difference between living on it and on land, that is, you have to eat seafood with the sea breeze all year round.
-
I think it's a very thrilling experience to live there because it's very unsafe to live on the sea.
-
Their life is 28 days of work, 28 days off, and so on.
In the central part of the Bohai Sea, there is a large oil field consisting of more than a dozen offshore oil production and drilling platforms, floating production, storage and unloading equipment, and lifeboats. A large heavy oil field of 100 million tons, the sea breeze blows, and the cold is pressing. On November 19, the reporter set off from Jingtang Port, Leting County, Tangshan City, took a Yantai tugboat to Qinhuangdao 32-6 Oilfield, and accompanied 37 workers who were about to go to various platforms to change guards.
The tugboat is a commuter car for oil platform workers, and Feng Yifei, a staff member of the Bozhong Operating Company of CNOOC Bohai Petroleum Administration Qinhuangdao 32-6, told reporters that the working mode of the platform is to work at sea for 28 days, and then return to land to rest for 28 days, and so on.
After about 1 hour of boat travel, a huge platform appeared in front of me, with eight legs and twelve piles, and the legs of the platform reached the bottom of the sea tens of meters. This is the CEPI platform, and the employees here prefer to think of him as the "i platform." Looking upwards, it is a derrick that hits the sky directly like a rocket launcher.
An important piece of equipment for oil production is a drilling rig. The drilling rig drilled into the seabed and reached a reservoir more than a thousand meters deep. It opens the passage between the oil layer and the surface platform.
The wells are continuously transported to the platform, and after a series of treatments, they are sent to the main refinery by tankers dedicated to transporting **. Climb onto the platform and ** the way people relax their legs. I saw a crane on the platform lowering the cage to the aft deck of the tugboat.
The person standing on the platform places the luggage in the middle of the cage, puts on a life jacket, puts his hands tightly on the rope net, and steps on the edge of the cage with his feet. Finally, the crane gently places the cage on the platform deck, which is about 50 meters high. The entire platform consists of a *** deck, an upper deck, a middle deck and a lower deck.
The upper, middle and lower decks each have more than 3,000 square meters. The total area is larger than a football field, where the production and life of employees take place. On the middle deck of the platform, there is a **control room, which corresponds to the brains of the entire platform.
The reporter saw that the control room was surrounded by various screens and equipment, and the working status of the entire platform was clear at a glance. Employees pay close attention to the dynamics of the equipment, pick up ** from time to time, record the problems reported by various departments, and broadcast them to the entire platform through the radio when special work is carried out. Exit the control room and follow the stairs into the living area.
With the platform running around the clock, workers are implementing a 12-hour full day, and many night shift workers are taking a break. The living area can accommodate up to 100 people, and it provides living facilities such as offices, restaurants, laundry rooms, gyms, etc., and is known as a mini-city.
-
The employees of the drilling team are generally the same as the land drilling team, working for three months and resting for one month, etc., the living conditions are very difficult, living in container houses, 4-6 people, working in two shifts, no leisure and entertainment facilities, bathing and toilet in winter are big problems. In the later stage, the employees of the oil well production (i.e., the oil production team) generally work for 20 days and rest for 20 days, and the living facilities are relatively better, with specially built staff dormitories and a small number of recreational facilities. So the life of the oil production team is relatively better.
-
The life of the workers on the drilling platform is very hard, often because the drilling is underneath, they can't eat in time, and sometimes they can't take a sip of water when they are thirsty and dry.
On June 6, 2008, China National Petroleum Corporation (CNPC) announced that the world's largest bottom-mounted drilling platform, CNPC-3 bottom-mounted drilling platform, had safely arrived at the Dongnanpu Oilfield in Hebei Province. After the platform is put into operation, it will greatly improve the exploration and development capacity of China's oil beach and sea area. >>>More
The impermeable membrane and composite impermeable membrane impermeable geotechnical composition data have the advantages of high strength, good anti-seepage function, strong deformation ability, light weight, width, convenient construction and low cost, and are widely used in water conservancy, electric power, metallurgy, environmental protection, urban construction, railway, highway, military industry, agriculture, mining and other fields of anti-seepage engineering. >>>More
Of course, the excess part can be counted as overtime wages, and at that time, it is necessary to see what kind of work nature a company has contracted, for example, the comprehensive working hour system is not counted.
I am in a foreign company as a sales executive, these years contact with the post-90s and post-95 children have also begun to work one after another, their attitude towards work, may be completely different from our people, they see work as a very personal thing, always according to their own emotions or their own mood to work, can not say that there is no enthusiasm for work, but their enthusiasm will never exceed their enthusiasm for life, that is, life and work are very separated, I can't confuse the two, but I think the way they treat their work is very different from that of our generation, and maybe it's really the different times that make different young people.
By a photoelectric code disc with an axis in the center, there is a ring through and a dark engraved line on it, and a photoelectric transmitting and receiving device reads it, and obtains four groups of sine wave signals combined into A, B, C, D, each sine wave is 90 degrees apart by a phase difference (360 degrees relative to a cycle), the C and D signals are reversed, and superimposed on the two phases of A and B, which can enhance the stable signal; A z-phase pulse is also output per revolution to represent the zero reference bit. >>>More