What is the process of charging pile installation?

Updated on Car 2024-06-21
7 answers
  1. Anonymous users2024-02-12

    According to the current policies and business rules, if you are a customer within the service scope of Guangdong Power Grid Company, the information required for charging pile installation business is as follows:

    1. Proof of identity of the head of household;

    2. Proof of property ownership of the property at the electricity address;

    3. If you entrust another person to act on your behalf, you need to provide the identity certificate and power of attorney of the agent;

    4. If you apply for bank deduction of electricity charges, you need to submit relevant payment information.

    5. For projects that occupy public places in the community, such as community parking lots, etc., it is also necessary to provide the consent letter issued by the owners' committee or the property for the construction of charging infrastructure.

    6. If you only rent a parking space, you need to provide the consent materials of the owner of the parking space, the identity certificate of the owner, the guarantee of the electricity charge, and the customer's statement.

    The Customer's Statement includes:

    A statement that I am legally renting the dwelling;

    Declare that the electricity charges incurred in the dwelling are borne by the tenant himself/herself;

    In the event that the power supply enterprise cannot contact the tenant, it agrees that the owner of the property or the original housing leasing enterprise may go through the relevant procedures for closing the account or changing the name of the power supply enterprise.

    Note: If it is a civil air defense parking space, the property owner needs to issue a property certificate or provide a certificate of use of the civil air defense parking space.

    The required information shall provide the original, as well as one copy verified by the customer to be consistent with the original and signed, and the customers of enterprises and institutions shall sign and affix the official seal in the copy. When handling business, resident customers need to sign and confirm on the "electricity business bill", and enterprise and institution customers must affix the official seal on the "electricity business bill".

    Due to the differences in information in different cities, please refer to the staff for specific information or call the 24-hour power supply service **95598 to inquire about the specific situation. The personnel notice shall prevail.

    Channel: Follow the "China Southern Power Grid 95598" public platform on WeChat My electricity business handling Electricity application Select the type of new business you need to handle, fill in the basic information and upload relevant information according to the prompts Check "I have read and agree to the "Endorsement Contract" and confirm that the submitted information is true and valid.

    After completing the application for installation, the power supply department will arrange staff to make an appointment with you for on-site service, complete the on-site investigation and collect the information, and then you can install the meter and send electricity.

    We hope you find ours helpful.

  2. Anonymous users2024-02-11

    The declaration and installation process of electric vehicle charging piles.

  3. Anonymous users2024-02-10

    The requirements for installing a charging pile are as follows:

    1. You need to go to the property center to sign the commitment letter for the installation of electric vehicle self-use piles.

    2. The circuit of the charging pile: the shell needs to be set with galvanized iron pipe or plastic pipe, and the wiring needs to be neat according to the specified line.

    Cable. 3. Installation of electricity meters: It should be installed at the designated position confirmed by both the power supply bureau and the property owner.

    4. Installation of charging piles: It should be installed at the designated position confirmed by the construction party and the property owner. The location cannot affect other rows.

    5. A suspended dry powder fire extinguisher of no less than 6kg must be installed above the parking space of the charging pile. In addition, two more than 4kg should be placed on the ground.

    Dry chemical fire extinguishers, which also need to be packed in a suitcase.

    Installation process:

    Prepare documents: ID card, real estate certificate, real estate ownership certificate, etc.

    Submit an application: Submit an application for installation online or at the business hall of China Southern Power Grid.

    On-site survey: The staff will go to the site to investigate and judge whether it can be installed.

    Preparation materials: You need to purchase your own charging pile.

    Complete the installation: China Southern Power Grid staff will install the meter (free of charge), and the charging pile installation needs to find another person to install it (generally find charging.

    pile manufacturer arrangement).

  4. Anonymous users2024-02-09

    Hello dear <>

    The following requirements and processes need to be followed to install charging piles:1Location Selection:

    The location chosen to install the charger should be safe and have enough space for the charger and the vehicle. 2.Network Connection:

    Charging stations need to be connected to a network for monitoring and remote management. Make sure that your internet connection is reliable and fast enough. 3.

    Electricity**: Vehicle charging requires a lot of electricity, so we need to make sure that the power supply of the charging pile is strong enough to meet the charging needs of all vehicles. 4.

    Generally, it is necessary to have a relevant power engineer or a professional installation company to complete the hail. In summary, the installation of charging stations needs to comply with relevant regulations and standards, and the safety and reliability of the equipment needs to be ensured. If you need to install charging piles, it is recommended to consult and cooperate with local professional companies or businessmen.

  5. Anonymous users2024-02-08

    1. You need to pay attention to check the surrounding environment before installation.

    When installing charging piles in the underground garage, we need to observe the surrounding environment first, we first need to measure the length of the charging area, then measure the distance between the charging pile and the parking space, and then confirm the location of the distribution box, confirm the wiring distance of the power cable, and also need to see whether the light is sufficient, whether the signal of the underground garage is stable, etc.

    2. Install the charging pile.

    When we install charging piles in underground garages, we need to plan the distance of the socket in advance, and then confirm the specifications of the charging pile to ensure that other vehicles can enter and exit smoothly.

    3. Connect the power cord by a professional electrician.

    After the charging pile is installed, you can connect the final power cord, it is best to operate by the circuit construction personnel when connecting the power supply, and at the same time, before connecting the power supply, you need to ensure that the electric pile has been correctly connected to the zero live wire and ground wire, and finally confirm that the safety is correct, and then power on to test whether the charging pile is running normally.

    What are the functions of charging piles?

    1. It can promote the continuous development of new energy.

    Car charging pile manufacturers said that with the country's attention to new energy and continuous development, and in order to reduce the pollution of the environment by automobile exhaust, a large number of new energy electric vehicles are used as a means of transportation, and there are also many charging piles designated for electric vehicles for fast charging services. Therefore, the use of charging piles can also continue to promote the rapid implementation and development of new energy electric vehicles in the country.

    2. It can provide convenient fast charging services for electric vehicles.

    Car charging pile manufacturers say that the use of charging piles can also help electric vehicles complete fast charging services, and no matter how far the speed is outside, there will be no liquid hopper or no embarrassment, charging piles will be built in many places. Therefore, electric vehicles no longer have to worry about the problem of not charging in time or not being able to drive without power.

    3. It can better protect electric vehicles against overcharging.

    The biggest advantage of using charging piles to charge each electric pin vehicle is that in addition to fast charging, car charging pile manufacturers say that it can also better protect electric vehicles against overcharging, and electric vehicles will automatically detect power failure after full charge. Since the lead-acid batteries used in electric vehicles consume fast and store slowly, it is very important for charging stations to be overcharged and can fill the gap of electric charging stations in the market.

  6. Anonymous users2024-02-07

    1. You need to pay attention to check the surrounding environment before installation.

    We first need to measure the length of the charging area, then measure the distance between the charging pile and the parking space, and then confirm the location of the distribution box, confirm the distance of the power cable, and also need to see whether the light is sufficient, whether the signal of the underground garage is stable, etc.

    2. Install the charging pile.

    When we install charging piles in underground garages, we need to plan the distance of the socket in advance, and then confirm the specifications of the number of charging piles to ensure that other vehicles can enter and exit smoothly.

    3. Connect the power cord by a professional electrician.

    After the charging pile is installed, when the code shed is not connected to the final power cable, it is best to be operated by the circuit construction personnel when connecting the power supply, and at the same time, before connecting the power supply, it is necessary to ensure that the electric pile has been correctly connected to the zero live wire and ground wire, and finally confirm that the safety is correct, and then power on to test whether the charging pile is running normally.

    What should I do if I don't have a charging pile?

    1. Use the charging gun to replenish the power, if you live on the first floor, you can make up the power of the pure electric vehicle through the plug-in board and the charging gun, but in this case, the charging power is relatively low (and around);

    2. For public charging, you can go to the nearest public charging pile site to replenish the power of the corresponding charging service provider's app, such as special calls, star charging, State Grid and other public charging service sites;

    3. Charging stations built by manufacturers.

    4. If the pure electric vehicle you buy allows battery swapping, you can go to the nearest battery swap center for battery swapping.

    How many types of charging piles are there?

    There are two types of self-use charging piles, one is wall-mounted and the other is buried. The buried charging pile only needs to lay the foundation, bury the wire, and turn on the power to use, and the whole process can be controlled within one or two hours. As for the installation of wall-mounted charging piles, it is even faster.

    How long does it take to install a late charging pile?

    Generally speaking, if all the conditions are met, such as the property, power supply and other departments agree, and the installation plan is not very complicated, the installation can be completed in three days. The general process is that the installation company issues an installation plan, and after obtaining the consent of the power supply department, it will send someone to install it. Under normal circumstances, the charging pile can be installed in one day, and the power supply department will supply power to the charging pile after passing the acceptance.

    However, if there are some obstacles in the early stage, such as the property does not agree to the installation and the property needs to be coordinated, there is no exact timeline for the installation progress.

  7. Anonymous users2024-02-06

    <>1.Choose the right location: Choose a suitable location for the installation of charging piles, and generally need to choose a place close to the power source in order to reduce power loss and cost. At the same time, it is also necessary to consider the wiring and power supply of the charging pile to ensure that the charging pile can work normally.

    2.Evaluate the power demand: Evaluate the required power according to the power and number of charging stations, so as to select the appropriate power supply and line for Fuxingjing.

    4.Purchase charging pile equipment: select charging pile equipment according to actual needs, purchase charging pile equipment that meets the requirements, and ensure the quality and performance of the equipment.

    5.Installation of charging piles: Installation and wiring work are carried out according to the installation instructions and specifications of the charging pile equipment. Pay attention to the location and direction of the charging pile to ensure that the charging pile can work and use normally.

    6.Conduct a careless electrical safety inspection: After the installation of the charging pile is completed, an electrical safety inspection is required to ensure that the installation of the charging pile meets the safety requirements and the electrical equipment is safe and reliable.

    7.Commissioning and testing: After the installation is completed, it is necessary to debug and test to ensure that the performance and function of the charging pile meet the requirements and can work normally.

    8.Install an operation management system: In order to facilitate management and use, an operation management system is also required to be installed to monitor and manage charging piles.

    In general, there are many factors to consider when installing a charging station, including geographical location, power demand, electrical safety, and equipment quality, etc., to ensure that the charging pile can work reliably and reliably, and meet safety requirements.

Related questions
10 answers2024-06-21

The conditions for the installation of charging piles in the community are: authorization letter issued by the property to agree to install charging equipment, and proof of use of fixed parking spaces (rental contracts are required for rented parking spaces); >>>More

12 answers2024-06-21

The specific application plan for battery car charging piles >>>More

30 answers2024-06-21

The charging pile needs to be re-based in the distribution room, because the electricity load of each cell is calculated before installation, and if a 100-volt voltage is used in the cell, only a 120-volt electric switch will be given to you. Therefore, the high voltage of 380 volts of the charging pile must be charged separately, that is, a switch is laid separately, which involves a cost of more than 8,000 yuan, which is borne by ourselves. Then, the power company pulls the wire from the switch to the charging pile about 200 meters, and the construction cost, including the cost of the hardware facilities of the charging pile, is borne by the power company, about 60,000 yuan, of which the state has a corresponding subsidy policy for the power company. >>>More

18 answers2024-06-21

At present, the battery capacity of plug-in hybrid models is basically between 10-15 degrees, and under NEDC comprehensive working conditions, the pure electric range is about 50-100 kilometers. There are several ways to make up the battery. >>>More

27 answers2024-06-21

The occurrence of high-speed charging piles can not be charged, there is damage to the charging pile, there is no timely maintenance, the data communication protocol of the charging pile is not updated in time and incompatible and other factors, to the damage of the charging pile, no timely maintenance, whether it is on the highway or on the urban charging pile is often encountered, and it is normal for this situation to occur on the highway. >>>More