-
OK. Considering the problem of damage caused by external friction, it is best to do it before paving.
Do waterproofing on the floor tiles, the original floor tiles are already very dense, if the effect is required to be longer, it is necessary to choose some better materials. For example, silicones have obvious effects, ** cheap, but short life, and very cheap, less than a dollar per square meter. So it depends on your situation and your choice.
Precautions] 1. Apply the above directly with transparent waterproof glue, and it cannot be broken with sharp things, so it is best to apply a few more layers.
2. The use of waterproof coating must be on a clean, firm and flat base surface to form a strong adhesion, and the waterproof coating directly painted on the tile can not really achieve the waterproof effect, because the surface of the brick has a layer of enamel, and the waterproof layer is easy to fall off on the surface of the brick, and it cannot be firmly bonded with the base layer.
-
Hello dear, happy to answer your <>
First scrape twice with ceramic tile renovation putty, and then brush twice with cement-based waterproof paint on top of this renovation putty, so that the floor tiles can be pasted. (PS: Ceramic tile renovation putty is a new type of building material specially used to re-apply tiles on the surface of the original ceramic tiles.)
Under normal circumstances, the tile is pasted after the waterproofing is done, because the waterproofing is done inside the tile, and it is not easy to be damaged after being protected by the tile. If you find that the waterproofing is not in place after tiling, you can continue to build a layer of waterproofing on the surface.
-
Can the waterproof layer be directly tiled? What are the steps to tile tiles? As a novice decorator, you may not know much about this. But don't worry, I'll give you a brief introduction to these two questions.
The waterproof layer can be directly tiled, but the banquet is a high requirement for the construction personnel, and there are more steps. Generally, there are two ways to paste tiles on the waterproof layer: one is thin paste, using tile adhesive to replace the traditional cement mortar; The other is brushing, which is to add an interface agent or lime paste to the cement mortar to make a brushing effect.
The steps for tiling are as follows:
1. First of all, you need to make the wall waterproof the best. Usually 30 cm up from the ground;
2. Secondly, draw a horizontal line, so as to ensure that the tiles can be glued on the same horizontal line;
3. The next step is to soak the bricks, because the tiles must be soaked for more than ten hours before they are paved;
4. Live ash, but it must be ensured that the mixing ratio of cement and sand is 2:1, so as to ensure the cohesiveness of the tile, and the ash should be live;
5. Pasteing, usually from the bottom to the top, but the gap between the tiles and the tiles should be padd with a toothpick to ensure the uniformity of the gaps;
6. Grouting, the day after the tile is pasted, remove the toothpick and carry out the grouting.
Precautions for laying tiles.
1. Before tiling, it is necessary to check the limb silver sampling, for example: to see whether the grade and color difference are the same as the samples seen before, and when it is confirmed, you can start construction.
2. If the wall is putty wall or calendered cement wall, it needs to be removed and treated accordingly. In addition, the wall tiles must not have < 1 3 bricks.
3. Before tiling, the bathroom floor should reserve a certain slope and be about 10 mm lower than the bricks outside the door.
Summary: After reading the above introduction, I believe you have a further understanding of whether the waterproof layer can be directly tiled. If you need to know more about it, please continue to ******, and more exciting content will be presented to you in the future.
-
Floor tiles are not waterproof by themselves, so they need to be waterproofed before laying them. Common waterproofing methods are as follows:
2.Laying waterproof layer: Before laying floor tiles, lay a layer of waterproof layer on the ground, such as waterproof membrane, waterproof membrane, denier, etc., and then lay floor tiles.
3.Use waterproof mortar: When laying floor tiles, use waterproof mortar to stick the floor tiles on the ground, this method is relatively simple, but the waterproofing effect may not be as good as the first two methods.
It should be noted that the waterproof treatment should be comprehensive, including the ground, wall, floor drain and other parts need to be waterproofed to ensure that the entire bathroom can be effectively waterproofed.
-
It is not possible to do waterproofing directly on the tile, and it is generally done before the tile is pasted.
1. Indoor and outdoor structures, mortar masonry structure walls;
2. Waterproof of the ground and wall of the bathroom, kitchen, floor, and pool;
3. It is used for paving, tile, wood, and previous plastering treatment, which can prevent moisture and salt pollution.
Waterproof materials continue to develop and test, the final polymer cement waterproof material effect is very good, the construction is more convenient, its maintenance time is also very long, generally in 20 years or so will not have any questions about the side of the bend, the specific construction essentials I am here to give to you.
1.The construction should be carried out under the condition of temperature above 5, and it is expected that the precipitation will not be suitable for construction within 24 hours. Tease 2The painting should be carried out horizontally and vertically, with an interval of 4 hours
3.If the coating has special requirements, you can consider increasing the number of brushing passes of the surface layer.
4.During construction, the air humidity is particularly high and the temperature is low, so the drying time should be appropriately extended.
5.If the temperature of the construction site is high, the amount of water can be appropriately increased when mixing to reduce the construction viscosity.
Hello, we have also had such a situation on the wall of our house, and the main reasons for the summary are: >>>More
There is water between the waterproof layer and the tile in the bathroom, then you need to repair the bathroom again, otherwise, after a long time, the gap between the waterproof and the tile will become larger and larger, if the water accumulates, it will affect the floor below, and the problem will be very big in the future, and there will be a lot of trouble, so it should be repaired as soon as possible.
Some time ago, I visited the renovation site of someone else's house, and I saw a worker who was pasting tiles and was painting concrete to the wall of the bathroom. I couldn't help but be curious and asked why. The worker taught me a serious lesson: the bathroom wall is waterproofed, and it is impossible to directly apply tiles. >>>More
Waterproof refers to preventing water from penetrating into our indoor ground or wall, generally coated with waterproof materials, which are sold everywhere in the market, it is recommended that it is best to apply 4 layers of waterproof coating, so that the waterproof effect is better. >>>More
The jacket is a functional garment, it has the function of windproof, waterproof and breathable, its cleaning method is different from ordinary clothes cleaning, if the cleaning method is not correct, it will seriously damage the waterproof performance of the clothes, in this sense, correcting the wrong washing method is equivalent to you buying a new clothes. So how many ways do we have the right washing? Eagle Nuoda will introduce to you today: >>>More