  1. Anonymous users2024-02-12

    1.It is more dangerous to accept it by yourself, because the decoration workers may fool you, you don't know it, right, it is recommended to bring an acquaintance, in fact, the most basic beginning must be to check whether the tiles, some of the base unit doors and the like are intact, and pay attention to whether some facilities in the corridor are intact;

    2.Check whether there is cracking in indoor doors, windows, balconies and other parts (balcony cracks are the most dangerous), and whether the paint is fully brushed. Take care to place mirrors on top and bottom of the door to check if these areas have also been painted.

    Check whether the sealing of doors and windows is good, you can use a long paper strip to put it on the sealing point, close the door and press the paper strip to pull it out, and test it at multiple points to see whether the pressure of the sealing strip is uniform. Screens and sashes on sliding windows to confirm whether the push is flexible and does not collide with each other. There should be an anti-blocking cap on the window frame outside the window to prevent foreign objects from blocking and affecting drainage, resulting in water ingress into the window when it rains.

    When the double-glazed glass cannot be wiped clean inside and out, it should be proposed to replace the glass for cleaning, otherwise it will not be easy to solve it in the future.

    3.Check whether the anti-theft door has scratches, whether the door edge is deformed, whether the door and frame are tightly sealed, and the door and lock switch should be flexible. Check the doorbell of the entrance door, install the battery that comes with it, and check if it is working properly.

    Observe whether the cat's eye is loose, unclear, incomplete or unable to see clearly due to foreign bodies.

    4.Check whether the wall is flat, whether there is water seepage, whether there are scratches and cracks, and whether there are bursting points (quicklime will form bursting points after being wiped on the wall due to uneven stirring when ripening lime). Check that the ground is level, and that there is no water seepage and cracking of empty shells.

    If there is a hollow drum, you should instruct the accompanying property staff to repair it as soon as possible, otherwise it will be easy to break through the floor slab during the renovation. <>

  2. Anonymous users2024-02-11

    If it is done by the guerrillas, and there is no unified management on the spot, I suggest that the acceptance should be carried out from the following aspects:

    1. Put pressure on the water pipe again.

    2. The circuit is tested with a shake meter.

    3. All sockets are tested with dedicated sockets.

    4. Check the saturation degree of the latex paint surface.

    5. After installing the lamps, check the flatness of the wall of the room at night.

    6. After the finished door is installed, check the closure and gaps.

    7. After the floor is installed, check the smoothness and sound of the ground.

    8. Check the switch control.

    9. Check the smoothness of all sewers.

    10. Check the installation of toilets, basins and showers in the bathroom.

  3. Anonymous users2024-02-10

    Here's a snippet of the quote:

    Home decoration is generally divided into five aspects of acceptance (water, electricity, tile, wood, oil). And on the basis of the national acceptance specifications and the quality acceptance standards agreed in the construction contract, all aspects of the project are accepted, and the following points should be paid attention to as the owner's non-professional acceptance: 1. Water:

    Pools, basins, sanitary ware, water pipes, heating, etc. Look: whether the installation of pools, basins, and sanitary ware is smooth, firm, and straight.

    Home decoration is generally divided into five aspects of acceptance (water, electricity, tile, wood, oil). And on the basis of the national acceptance specifications and the quality acceptance standards agreed in the construction contract, all aspects of the project are accepted, and the following points should be paid attention to as the owner's non-professional acceptance:

    1. Water: pools, basins, sanitary ware, upper and lower water pipes, heating, etc.

    Look: whether the installation of pools, basins, and sanitary ware is smooth, firm, and straight. Whether the upper and lower sewer pipelines are straight, whether the fasteners have been installed, and whether the joints are leaking and seeping;

    2. Electricity: power cords (sockets, switches, lamps), TV, **.

    Look at the roll-off: whether the power cord uses the national standard copper wire, and the general lighting and socket use the square wire; Use 4 square wires in the kitchen and bathroom, if the power cord is a multi-strand wire, it must be soldered before it can be connected to the switch socket; The TV and the first signal line should be kept at a certain distance from the power cord (not less than 250mm), and the installation of lamps and lanterns should use metal hanging points, and they should be tested one by one after completion.

    3. Tile: ceramic tile (wet paste, dry paste), stone (wet paste, dry hanging).

    Look: Before construction, the pre-arrangement and pre-selection process should be carried out, and the materials with different specifications should be divided into several categories, which should be placed in different rooms or planes to make the bricks aligned, and the materials with individual warps should be used as cutting materials, so that the lower quality materials can be used to install better results.

    4. Wood: doors and windows, suspended ceilings, wall cabinets, wall skirts, heating hoods, floors.

    Look: When choosing wood, you must choose a drying material, so as to avoid deformation in the future; The wood should be painted with fireproof and anti-corrosion materials on the static surface before it can be used, and the blockboard should be made of high-quality and environmentally friendly materials. Large-area ceilings, wall skirts per square meter of not less than 8 fixed points, hanging the top of the big comic state to use metal hanging points, doors and windows to use a good number of materials to prevent deformation.

    The wooden square of the floor leveling should be larger (not less than 6 6).

    5. Oil: paint (clear oil, mixed oil), coated finger noisy material, paste, soft package.

    Look: the surface treatment of decoration is the most critical, the paint must be made of high-quality materials, the surface treatment must be done before painting or painting, the oil mixing is hung on the surface of the wood first, and then the paint is sprayed after grinding and leveling, and the wall paint is repainted, and the primer must be used (to isolate the acid-base reaction between the wall and the topcoat) to prevent the wall from changing color.

  4. Anonymous users2024-02-09

    When it comes to housing acceptance, it can actually be divided into the following categories: construction acceptance, waterway acceptance, circuit acceptance, waterproof acceptance, mud acceptance, paint acceptance, and completion acceptance.

  5. Anonymous users2024-02-08

    When accepting, in fact, remember to check whether there is a problem with the doors and windows at home. Whether the lower part of the window is sealed, and whether there will be gaps that leak when it rains, so you can choose to check it when it rains to see if there will be problems.

  6. Anonymous users2024-02-07

    1. Acceptance of hydropower transformation.

    Hydropower acceptance layman can't see anything at all? In fact, the inconvenience of life in the future can be found in the step of hydropower acceptance.

    1.Whether the circuit is safe or not, pay attention to the following points.

    Exposed copper wires are at risk of electric shock and fire, so they should be wrapped with adhesive tape. The reserved wire head should be rolled into a spring shape and hidden in the bottom box, with a protective cover.

    Water and electricity cannot be the same tank. In areas with waterproof requirements (kitchens, bathrooms, balconies), the floor cannot be wired. Therefore, the lines of the kitchen and bathroom are generally topped, and they are electric and underwater.

    In case of water pipe leakage, it will not affect the normal operation of the circuit.

    2.Strong and weak electricity do not communicate with each other.

    At present, the best distance for strong and weak electricity is 50cm, but many small apartments have limited area, not to mention 50cm, 30cm may not be possible.

    Therefore, how far away the strong and weak currents are separated should depend on the actual situation, and try to pull them apart as much as space allows.

    Extend 200mm from the intersection of strong and weak current for shielding protection, and generally wrap the weak current tube with tin foil.

    Two: bricklayer acceptance.

    The bricklayer is the easiest link to see the flaws, point out the mistakes, don't be afraid of the master!

    1.The brick joints are uneven, and the brick surface is uneven.

    Don't think that if you are a layman, you can't correct the mistakes of insiders. There are too many deficiencies that can be found with the naked eye, especially when encountering a construction site where tools are placed indiscriminately, materials are placed indiscriminately, and cigarette butts are thrown all over the ground, there are definitely a lot of mistakes that you can figure out!

    First of all, look at how the wall tiles of the bathroom and kitchen are paved, and whether the brick joints are evenly aligned. Standing on the side of the wall, you can see if there are any obvious bulges or depressions on the wall after the brick is laid.

    Then knock it around, if there is a hollow sound (this is called a tile hollow drum), it should be repaired immediately, otherwise it will be easy to loosen and fall off after a few years.

    2.Is the floor drain draining fast? Give it a try.

    As we all know, the floor drain should be installed in the lowest place in the bathroom, and the tiles should be opened to the whole brick to smooth the drainage.

    When accepting, don't forget to put water to try the drainage speed, otherwise it will be difficult to change if there is a problem after the bricklayer acceptance.

    Three: oilman acceptance.

    If you want to find the mistake of the big white wall, you should stand 150cm away from the wall and observe: whether there are any small mistakes such as paint marks (falling) like water droplets, small bumps, sand holes (holes the size of hair), brush marks, etc.

    When accepting the two-color wall (including the situation of different colors of the wall and the roof), it is necessary to pay attention to the junction of the two colors: whether the dividing line is straight or not, whether the colors penetrate each other (bite color), etc.

Related questions
7 answers2024-07-04

Renderings generally only need 3DS, VR rendering software, the effect of indoor model rendering is first-class, but due to the high requirements for the model, and it is not easy to modify when something goes wrong, there are not many people who can master it well. The renderer that comes with 3ds Max is not very good, and it is common to use external ones, such as VR. PS is Photoshop, which is the post-processing of renderings (such as adding people, plants or color adjustments, etc.). >>>More

7 answers2024-07-04

1. Decoration design fee The design fee refers to the pre-construction project basin fee, scheme design fee and construction drawing design fee, etc., which is not a hard indicator. Second, the cost of decoration materials decoration materials account for the largest proportion of decoration expenditure. It is the most important factor affecting the cost of decoration. >>>More

7 answers2024-07-04

The home renovation process generally consists of the following main steps, which may be adjusted on a case-by-case basis: >>>More

27 answers2024-07-04

Are you referring to wires or? Wires are generally set according to the location of lamps, sockets, and switches at home, mainly according to the needs of the family. The cable is slotted horizontally and vertically, and the strong and weak currents are separated and kept at a distance.

6 answers2024-07-04

1. The highest-end European style.

European-style home decoration wine cabinet design renderings can only be described by high-end two words, most of this wine cabinet is made of solid wood, because in order to make this kind of wine cabinet, it is necessary to use perfect raw materials, but solid wood is in line with this, it is not only strong and durable, but also easy to carve and polish, European-style design is particularly atmospheric, there are also a lot of beautiful arcs in it, of course, it will also be combined with some classic designs, such as Roman columns, all-copper handles, etc. >>>More