-
Waterproof plugging king.
The coagulation time of a shift is 2-3 minutes, 4-5 minutes in winter, the coagulation speed is very fast, and water can be used after solidification. Before using the plugging king, chisel the leakage point or leakage joint into a bell or wedge joint to remove debris
A lot of dust is fried because the sand turns into small particles and adheres to the surface of the chestnuts during the frying process.
Sugar-fried chestnuts: As the name suggests, it refers to chestnuts that are fried with sugar.
Chestnut can be used in food processing, cooking banquets and non-staple foods. Chestnut raw food, stir-fried food, sugar fried chestnut, mixed with roasted chicken, spray fragrant and beautiful, can grind flour, can also be made into a variety of dishes, pastries.
canned food, etc. Chestnuts are easy to store and keep fresh, which can prolong the market time. Chestnut is mostly produced on the slopes of the mountain, and is called "health food" in foreign countries, which belongs to the high-quality fruit that strengthens the stomach and kidneys and prolongs life.
Chestnuts contain not only a lot of starch, but also proteins, vitamins.
and many other signature nutrients.
Known as the "King of Dried Fruits". Chestnuts can be substituted for grain, and jujubes, persimmons are called "hardcore crops", "woody grains", is a kind of cheap, nutritious tonic and nourishing medicine.
Chestnuts are rich in unsaturated fatty acids.
and vitamins and minerals, which can prevent and treat hypertension.
Coronary heart disease, arteriosclerosis, osteoporosis and other diseases are good nourishing products for anti-aging and longevity; Chestnuts are sweet in taste, warm in nature, and enter the spleen, stomach, and kidney meridians; It has the effect of nourishing the stomach and strengthening the spleen, strengthening the kidneys and tendons, and invigorating blood and stopping bleeding.
-
The quality of the material is not good or too much water is added during construction, but the former is more likely! More information, better advice, free professional technical consultation on concrete waterproof leakage water repair, exempt from repairing today, leaking tomorrow; Repair every year, the trouble of leaking every year.
-
Generally, after adding water, it will heat up and harden in 1 3 minutes, and it will not dry after 48 hours, which may be a construction error or a quality problem of plugging the leak.
-
Watering once every two or three minutes, the general setting time is about the same time, and there is no need to water after solidification.
Plugging King refers to a high-performance, inorganic, alkali-free, waterproof, moisture-proof, anti-crack, impermeable, leak-plugging in one of the latest high-tech products. Its most amazing feature is that it solidifies quickly and is much denser and stronger than today's high-grade concrete.
It begins to set one minute after mixing and ends in three to four minutes.
Plugging King Use Note:
1. Mixing ratio: Stir with 1kg of powder and water, first pour an appropriate amount of water into the container, and then add the plugging king and stir quickly until a uniform viscous putty-like powder without unity is formed.
2. Quick repair: When repairing, the cracks are chiseled with concrete, all loose particles, dust and sundries on the base surface are washed, the places to be repaired are thoroughly wetted, and then the stirred plugging king is stuffed into the cracks, and it is necessary to ensure that it is completely filled to ensure the formation of good mechanism bonding.
3. Repair the cracks that are leaking: first quickly plug the open water leakage point, and then carry out anti-seepage and rectification treatment on the weak parts around the leakage point, and paint the repair place to achieve the best waterproof effect.
-
Plugging king brushes for the second time every 24 hours or more, and the effect of dry brushing is better.
Plugging king is a kind of waterproof coating, with a good waterproof effect and simple operation characteristics, plugging king in the deployment, to operate according to the standard of the manual, stirring while slowly adding sand, while stirring, until stirring into a viscous state, must not stir too thin, otherwise not only can not play a waterproof role, but also cracking, at the same time, it is necessary to pay attention to the stirring of the plugging king to be used up in time, otherwise it is easy to solidify and cause waste.
Before using the waterproof material of the plugging king, all the base should be cleaned up, and the construction should be carried out only under the condition of keeping the base dry and dry, and the exhaust hole should be designed in the construction area.
It is best to set one every 36 squares, and pay attention to the temperature of the water when the plugging king is deployed, not too high nor too low, and the maximum temperature can not be higher than 37 degrees. Of course, if the weather is cold, you can mix it with water at 21 degrees Celsius, and you can't use water above 37 degrees Celsius when blending.
Under extremely cold conditions, it is recommended to mix with water at about 21 degrees Celsius, which is convenient for later use, and at the same time, it should be noted that the plugging king material should be used up within 5 minutes, otherwise it is easy to solidify, when painting the plugging king, it is best to divide it into 2-3 times, and the interval between each time is about 24 hours.
-
Plugging king condensation can be used with water. The plugging king has the function of rapid plugging with water, the initial setting time is only 2 minutes, and the final setting time is 15 minutes. Both the facing and back water surfaces can be constructed, and the base layer is combined into a non-aging whole, with strong water resistance.
Precautions for the use of plugging king:
1. The proportion of gouache can be appropriately adjusted with different substrates, weather and construction conditions.
2. The normal setting time is 5 minutes, but it may fluctuate due to different water consumption and construction temperature.
3. A large amount of heat will be generated when condensing, and care should be taken to avoid scalding.
4. This product has strong alkalinity, and corresponding protective measures should be brought for construction.
Storage: Unopened products should be stored in a dry, cool, and ventilated place.
After the product is opened, the product should be sealed again in order to avoid affecting the performance of the product.
Shelf life: 12 months.
-
Summary. Hello dear, you can use water after 5 minutes after the plugging king. The general coagulation time of the waterproof plugging king is 2-3 minutes, 4-5 minutes in winter, the coagulation speed is very fast, and the water can be used after solidification; Before using the plugging king, chisel the leakage point or leakage joint into a bell or wedge joint to remove debris
Put 1 kilogram of plugging king into the pot, add kilograms of water, quickly mix into a slurry, winter construction should use warm water, summer construction should use cooling water, too much or too little mixing water will affect the quality of construction.
Hello dear, the plugging king can use water after 5 minutes to roll the plum. The general coagulation time of the waterproof plugging king is 2-3 minutes, 4-5 minutes in winter, the coagulation speed is very fast, and the water can be used after solidification; Before using the early plugging king, chisel the large water leakage point or leakage joint into a bell or wedge joint to remove debris. Put 1 kilogram of plugging king into the pot, add kilograms of water, quickly mix into a slurry, winter construction should use warm water, summer construction should use cooling water, too much or too little mixing water will affect the quality of construction.
Plugging King is a kind of high-performance, inorganic, alkali-free, waterproof, moisture-proof, anti-cracking, anti-seepage, and the latest high-tech product integrating leakage plugging. Its most amazing feature is that it solidifies quickly and is much denser and stronger than today's high-grade concrete.
It can start to solidify one minute after mixing, and finally set in three to four minutes, and the compressive strength of the beam can reach more than 25MPa in one day. It is also possible to apply directly on a wet base.
-
Can you use the plugging king after it expires? Hello, I am glad to answer for you<> pro just to the expiration date of the plugging king can observe whether there is moisture agglomeration, if not, you can use. Expired means that the quality has not been guaranteed, and sometimes it backfires or is not clear.
1. There are restrictions on use: the base must be clean, no sand, no loose, and no hollowing; The moisture content of the base base should be within 5, and the moisture content of the waterproof base of the ground and underground buildings can be constructed within 10; The layer should be provided with an exhaust hole every 36 square meters; In order to prolong the service life of the waterproof layer and ensure the quality of the project, it is recommended to make a protective layer after the construction of the coating film. The Venerable Master told the roof:
Make a protective layer of cement mortar on top of the coating film. 2. Restricted by natural factors: in addition, it also has some shortcomings, which requires everyone to pay attention to the fact that the coating film should not be exposed to rain before it is cured, and it is forbidden for the master to walk or carry out other operations; During construction, it is strictly forbidden to contact with open flame and water; The shelf life is 12 months at room temperature (25°C), and you should not use it after the expiration date.
Hope mine can help you <>
Do you have any other questions?
-
Dear, I'm glad to answer for you: the plugging king should be brushed several times to answer the plugging king to brush three times, two rolls to three pieces The plugging king should brush two to three pieces better, but to brush each piece after it is dry, so it plays a better role. The thickness of the plugging king is about 2mm, and it is generally necessary to paint 2-3 times, and after the plugging king, you can brush the waterproof coating and make a layer of cement mortar to protect the defense layer to prevent problems such as falling off and cracking.
Plugging king refers to the latest high-tech products that are high-performance, inorganic, alkali-free, waterproof, moisture-proof, crack-resistant, seepage-resistant, and plugging. Thank you for your patience. If you are satisfied with my service, please give a thumbs up, and once again wish you all the best!
Peace and joy!
-
Plugging King does not need to be maintained with water every day.
The maintenance time of the plugging king must be more than three days. Of course, if the leak is plugged, there is no need for maintenance. It should be noted that since there are many copycats on the market, you must go to the regular channels to buy the plugging king.
The plugging king has rapid solidification and the density and strength are much higher than the current high-grade concrete. It can begin to solidify one minute after mixing, and finally set in three to four minutes, and the compressive strength can reach more than 25MPa in one day. It is also possible to apply directly on a wet base.
-
The plugging king on the market is cement-based, that is to say, cement is used as the base material, mixed with other materials, mainly used for waterproof plugging of concrete structures, not in the plugging of faucets. If the faucet is leaking, turn off the main switch first, find a water and electricity repairer, or replace it with a new one.
Just keep water at the bottom of the pelvis at all times.
Watering is the basis of orchid farming, and if you master the watering method correctly, your orchid farming will be half the success. The orchid originally grows in the wild in a humid environment, and its roots are fleshy roots, which are easy to rot when exposed to water, causing yellow leaves, dead leaves, and even death. The soil in which orchids grow tends to be dry, and about eight points dry and two parts wet can ensure that the orchid grows well, so the soil and pots when we plant orchids should be well ventilated and drained. >>>More
This needs to be determined according to the actual growth situation, under normal circumstances, more than 10 days is the need to eat a fertilizer, you can choose some natural fertilizer.
Don't be too diligent, after the first watering, plant on the ground at an interval of 5-7 days and then water the second time (summer and autumn), planted in a large pot, the interval is 3-4 days late to water once (summer and autumn, put outdoors). Watering too often can lead to root death. >>>More
Generally, eye masks that only have a simple moisturizing effect can be applied every day, but if there is an eye mask with a whitening effect or high-performance ingredients, it is better to apply it 1-2 times a week. >>>More