With the development of society, the living conditions are getting better and better, and now there are more and more people buying houses, so they now attach great importance to decoration, especially when we change to hydropower, we must first draw the route, and then slot, and slotting also requires a certain technology, first of all, we must also pay attention to the strength and angle of slotting, so that it will not affect the appearance, when we clean up the tide, it is also necessary to clean up the inside of the slot. Don't get any debris in.
Hydropower transformation with toothless saw slotting, need to draw the line first, according to the plan to be changed to draw the line, the line adopts the horizontal and vertical method of planning.
1. Toothless saw slotting, slotting with a toothless saw according to the line, and cutting out the line on the wall.
2. Add water, and then add some water to the slotted wall, and add water all the way during the cutting process to prevent the blade from overheating.
3. Punch the groove, use an electric hammer to punch the cut wall out of the groove, pay attention to the strength and angle, and try to punch as neatly. Clean the groove, clean the groove that is flushed out, and knock down the places that are easy to fall. Waterproof, if it is a pipe in the toilet, it is recommended to brush some waterproof (or not, depending on personal wishes).
Comparison of the lower line pipe. Put the tube that needs to be lowered into the trench for experimentation, and if there is no problem, the trench will be done.
For the slotting of hydropower, we also have to pay more attention, because this is also very important for the comfort of life in the future, if you do not draw a good route, go to the slotting to decorate this hydropower, there may be a lot of inconvenience in the future life, if you want to redecorate, it is also more troublesome, so we still need to plan it when we do this.
When we are doing hydropower slotting, if we encounter a turn, it is best to make it arc-shaped, which is also convenient for future maintenance and easier to pump the wire, and the arc is not easy to hurt the wire, so this is very good.
-
Not all walls are suitable for slotting, such as load-bearing walls, some workers will ignore the brutal slotting, resulting in the destruction of the building structure, and the ground slotting should also be careful not to damage the floor slab. The correct slotting must be horizontal and vertical, the pipe of the flat walking line is 60-90cm high from the ground, and the place where there is a faucet must be vertical. The socket is slotted 40 cm from the ground, the hanging air conditioning socket is slotted from the ground, and the switch is slotted from the ground.
In addition, there is a principle in hydropower construction, "go to the wall and not the ground, and go to the top and not the wall". It means that the line is best to go to the top, the top can not go, consider walking the wall, the wall can not go, and finally go to the ground. Because the top line is in the ceiling, it is easy to maintain, but it is different to go to the ground, and the cost is too great to lift the floor.
-
It can be used, the cutting machine is slotted, it is very convenient, and the damage to the wall is not very large.
-
In order to avoid convenient maintenance in the later stage, and in order to reduce costs, you can go to the ground, do not go to the top, and be sure to pay attention to the depth.
-
At this time, we should ask a professional master to open a groove for us, and we should also pay attention to the instructions of the professional master, don't do what you want, and regret it in the future.
-
With the development of the times, the decoration is hoped to highlight the different effects, the decoration workers will no longer be like the tradition, good decoration will not bring inconvenience to life, if the later wire is broken and the wall needs to be chiseled, it is also more troublesome. In this case, you must make a wise choice in advance when decorating, and don't be afraid to waste money. Especially for decoration, the most important hardware, water and electricity must not be sloppy, and the requirements must also be strict.
In this way, the decoration is more beautiful and practical, and it will also make the owner live comfortably.
-
Yes, but the situation is different, we must analyze it specifically, we must find the ground before transforming the ground, leveling the floor, and then we must get the help of a professional decoration company, do not operate blindly, and the trunking must be straight.
-
It is necessary to judge according to the leveling layer, if there is no leveling, there is no need to slot, which can avoid waste and can also avoid affecting the cleanliness of the home.
-
In general, it is definitely necessary to groove, so that it can be better hidden and avoid affecting the appearance.
-
The first step of hydropower transformation is hydropower positioning, that is, according to your needs to determine the location of the whole house switch socket and the location of the waterway interface, the plumber should draw out the direction of the water pipe and wire on the wall according to the position of the switch socket water faucet, that is, the layout of the line, remember to ask your decoration team for the hydropower diagram, let the plumber according to the map to explain the line to you clearly, don't be afraid of trouble, the plumber will definitely meet your requirements, after the completion of the hydropower renovation if you do not sign, the plumber does not want to take money from the decoration captain. <>
After the hydropower positioning, the next step is to groove. The groove made by a good groove beater is basically a straight line, and there are basically no hairy teeth on the edge of the groove. Note that before slotting, be sure to ask the plumber to mark all the hydropower directions on the wall, and remember to check the hydropower diagram to see if it is consistent.
There are a few more points to note about hydropower transformation:
1. It is best to indicate the brand of the wire used in the circuit transformation in the contract.
2. The switch of the whole house should be basically in the same horizontal position. <>
3. The sockets of the whole house should be at the same level as much as possible, and special sockets such as air conditioners, refrigerators and special requirements are exceptional.
4, the circuit transformation in the phase line, the color of the zero line should be the same for each house, if possible, it is best to indicate the color of the live line, the zero line and the control line in the contract, and the protection line is yellow and green according to the national regulations.
5. It is best to use 3-wire multi-strand for socket lines (including air conditioners and refrigerators), and 2-wire multi-strands for lighting wires.
6. The bottom box is buried, if you can, it is best to buy the bottom box yourself, please report the installation fee to the decoration team.
7. Regarding the audio cable, if you are not a professional audiophile, it is best not to install the audio cable: the housing area in Shenzhen is basically about 100 square meters, and the area of the living room is generally not very large. The air traffic control is also counted as silver.
Regarding the renovation of the waterway, there is one point that I think it is necessary to say: Regarding the issue of hot water, in terms of the weather in Shenzhen, does it need to use hot water in the washbasin and the vegetable sink in the kitchen? If you need hot water, turn on the water heater and connect it.
When decorating, I only sighed that it is not easy to make money, but it is so easy to spend money!
Finally, it is best to note in the contract that you must wait for the completion of the hydropower renovation carpenter the site, the benefits of this: you don't have to pay attention to two things at the same time, hydropower renovation is a very important expenditure in the decoration, but also the bulk of the decoration company's profits, and the hydropower renovation is very hidden, if the carpenter enters the construction at the same time, it will distract your attention and will not pay attention to the hydropower transformation.
When renovating the waterway, pay attention to the cleanliness of the perimeter. When concluding a contract for waterway renovation, it is advisable to indicate the materials used in the waterway renovation. In addition, in the renovation of the waterway, it is necessary to pay attention to the size of the sewer pipe in the original room, and the pipe connected to the original sewer pipe in the house should be matched with the original sewer pipe.
In the circuit transformation, it should be noted that the lamps and lanterns of the whole house should be installed in advance in order to determine the location of the switch socket, and at the same time, it should be noted that the new buried wire and the replacement wire are different. When buying a doorbell, it is better to buy a wireless doorbell.
-
Yes, it must be slotted, so that the concealment is better, and the effect will not be ugly, the specific operation is to make the corresponding groove in the wall, and then put the water and electricity wires in it for combined connection.
-
Of course, it is necessary to groove, because many lines need to be installed in the wall, which needs to be grooved according to the horizontal reference line, and can not be slotted indiscriminately, otherwise it will lead to damage to the wall.
-
It has to be grooved. First, use a cutting machine to cut out the gaps in the wall, then stuff the wires into the PVC pipe, then put the PVC pipe in the gap, and then lay a layer of mesh, and then repair the wall.
-
We know that the purpose of the hydraulic notch is to protect the pipeline and prevent workers from walking back and forth to cause damage, and if there is a notch, protect the pipeline. We know that the hydraulic notch doesn't add much to the ground height. However, if the groove is not attached, in order to cover the coffin, the ground will naturally be raised, affecting the floor height of the room.
The lines inside the groove are fixed so that they don't move back and forth, which is safer. It can be said that there are pros and cons to not being able to groove, but in the current mainstream practice on the market and the project summary of netizens and owners, it is pointed out that hydraulic renovation is still grooved. Maybe the construction cost will be more now, but the hidden dangers of the past are avoided, so overall money is saved.
Friends who have not been shot don't have to worry too much. Is it better to choose a slot quickly, or not at all? Let's just say there's only one benefit to grooving:
does not lose the height of the layer (3, 5 cm). But the disadvantages are also obvious. Only one word more expensive (the total cost with a groove is on average 3 5 won than the total cost without a groove square meter)!
So, do you want to charge a few hundred more for a floor height of 3 5 cm? According to the original meaning, open a slot, don't open it if you don't want to, it's as simple as that. There's a lot of lawlessness and gossip, so I listen to it a lot.
But most of it is fake, no matter who is better or worse, let me summarize four rumors about hydraulic retrofit tanks.
Let you have a neat groove, and make a mess without a groove? Of course not! Pipes that are not slotted can also be neatly arranged, and similarly, slotted pipes can be opened poorly.
Some people say that if you don't make a groove during the hydropower renovation project, people will move around and the pipeline may be damaged. At first glance, this sounds very reasonable. If you think about it, it's a ridiculous story.
First of all, the official card is not so easy to loosen, the pipeline is not so fragile, and there is no impact on the normal stepping on the line. Slotted pipes have very limited ability to protect them. Because in the end there is direct exposure to air during the construction process.
Finally, the protection requirements of the construction site are very strict, is there a decoration company that does not even protect the pipeline well?
-
Of course, it is good to do water and electricity, and the slotting is more beautiful, and if it is not slotted, it is not only unsafe but also unsightly.
-
Of course, it is better to slot, so that the water and electricity can be hidden in the water pipe, so that the water and electricity will not be destroyed during the decoration.
-
Personally, I think that if you want to do hydropower transformation, it is better to choose slotting, because I think slotting is very conducive to later management.
-
If conditions permit, it must be slotted. It's not a question of money.
My home is in the north, so to lay floor heating pipes, and then lay cushions, and then lay water surface pipelines, the ground in my home is not slotted, the water pipe is directly from the tap water switch to connect a pipe, to the kitchen, and then to the bathroom, the bathroom water pipe is the top floor, a bathroom with five pipes, to be honest, quite waste, but the advantage is that in the future when encountering water leakage or something, easy to overhaul and replace. Then the power change is the closest distance between the two points along the wall, there is no kind of right-angle bend or something, in order to facilitate the replacement of the old line with the new line in the future. There is no groove because the underfloor heating pipe is laid in the ground.
Is the floor slab screed? Generally concrete floor slabs are 8-12 cm thick. There are more of them in the range of 8 to 10 centimeters.
If there is no screed, direct concrete slotting, it is not recommended personally. Because it is easy to destroy the steel bar, and the three or four centimeter groove seriously affects the quality of the floor slab, resulting in cracking.
If a screed layer is made, there is generally a mortar layer three or four centimeters thick. Under this premise, the slotting does not affect the concrete floor slab.
So what are the benefits of slotted wiring?
First: to protect the water and electricity pipelines, during the construction process, the entry of materials and the operation of tools may lead to secondary damage. In particular, the water pipe may not be broken and leaky, and the skin is damaged, which is a relatively large hidden danger for a long time, and the uneven force of the water pipe is also a key to water leakage.
Second: reduce the hollow drum rate. Now the construction is becoming more and more standardized, and there may be more than a dozen strong and weak electric pipelines on the ground, waterway pipelines, and one aisle side by side.
When the tile is laid on such a pipeline, it is easy to cause hollowing, later deformation and loosening, if it is slotted, the mortar layer is on a plane, and the mortar structure is stronger.
Third, floor height control. If the developer hands over the building to do the leveling layer, slotted wiring, the floor tiling surface will be about four centimeters, if there is no slotting, it is likely to reach seven or eight centimeters or even more. A few centimeters doesn't look like much, but it's still not so depressing in terms of overall visual effect.
-
I think that hydropower renovation needs to be slotted, because this can better protect the hydropower and later maintenance can also find the location more accurately.
-
If you need it, you have to slot, but if you can't open it, you don't want to open it, because it's actually very troublesome to make up later.
1. Water:
Brand PPR Material: Diameter. >>>More
Renovation does not necessarily require water and electricity renovation, but if it is a rough house, it is recommended to hire a plumber to carry out water and electricity renovation, because some of the sockets, switches and water outlets set up by the developer are often incomplete or do not meet the owner's preferences. >>>More
The method of hydropower transformation and displacement is very simple: >>>More
When we decorate the house, we need to pay attention to the following points1. The waterway of the kitchen mainly includes water heaters, etc., which is generally a water heater shared at home, so it is necessary to think well when the waterway is renovated, where to put the water heater, so as to ensure that the hot and cold water pipes can go to the bathroom. In order to install the hot water pipe, the floor drain and sewer should also be handled very well, otherwise there will be a phenomenon of backwater, the distance of the water meter should be installed appropriately and conveniently, and the water inlet of the maintenance toilet should not block the view, so that its location can be determined according to its model. <> >>>More
Home water and electricity renovation.
It is not an easy task, and the following three aspects should be paid attention to when carrying out home hydropower transformation: 1. Design the renovation plan in advance 2. Do a good job of supervision during construction 3. Pay attention to the quality of hydropower materials. >>>More