What are the general evaluation materials of construction projects?

Updated on society 2024-08-01
13 answers
  1. Anonymous users2024-02-15

    6 Construction documents.

    Civil construction documents long-term.

    Commencement report, engineering and technical requirements, technical disclosure, and drawing review minutes.

    Construction organization design, construction technical plan, construction plan, construction technical measures, construction safety measures, construction technology.

    Factory certification and quality appraisal of raw materials and components.

    Building material test, strength test report.

    Design changes, engineering change negotiation orders, and material substitution approval and approval.

    Construction positioning, surveying, review records, geological exploration.

    Soil and rock test report, foundation treatment.

    Concealed engineering acceptance records.

    Construction records. Engineering quality inspection, evaluation and summary.

    Observation records of subsidence, displacement and deformation.

    Technical summary, construction diary, memorabilia.

    Proof of delivery and acceptance record.

    As-built report. Defect liability period and sweeping works.

    Incident Handling Report.

    Construction of audio-visual materials.

    As-built drawings permanently.

    Equipment manufacturing and installation documentation for a long time.

    Commencement report, engineering and technical requirements, technical disclosure, and drawing review minutes.

    Construction organization design, construction technical plan, construction plan, construction technical measures, construction safety measures, construction process description procedures.

    Approval of design changes, engineering change negotiation orders, materials, parts, and equipment substitutions.

    Product production quality appraisal report.

    Construction materials test report.

    Factory certification and quality appraisal of raw materials and components.

    Welding test records, reports, construction inspections, flaw detection records, X-ray reports, negatives.

    Concealed engineering acceptance records.

    Strength and tightness test records.

    Manufacturing, installation records, quality inspection and evaluation, and summary.

    System debugging and test records.

    Intermediate delivery acceptance records and certificates.

    Equipment, material qualification certificate, product factory certificate.

    Equipment, material packing list, spare parts list, parts catalog.

    Equipment acceptance records, installation and commissioning, measurement data, performance appraisal.

    Instruction manual.

    As-built report. Construction diary, memorabilia.

    Incident Handling Report.

    Construction of audio-visual materials.

    As-built drawings. Electrical, instrumentation, pipeline installation documents long-term.

    Commencement report, engineering and technical requirements, technical disclosure, and drawing review minutes.

    Construction organization design, construction technical plan, construction plan, construction technical measures, construction safety measures, construction process description procedures.

    Approval of design changes, engineering change negotiation orders, materials, parts, and equipment substitutions.

    Construction materials test report.

    Factory certification and quality appraisal of raw materials and components.

    Equipment, material packing list, spare parts list, parts catalog.

    Manufacturing, installation and commissioning records, measurement data, performance appraisal.

    Insulation, grounding resistance and other performance testing and verification records.

    Operational linkage test.

    There are records of water commissioning and no water commissioning.

    Handover records of electrical installations.

    Records of pipeline cleaning, water and disinfection.

    Pipeline elevation, location, and slope measurement records.

    Intermediate delivery acceptance records, engineering quality assessment, and product factory qualification certificates.

    Instruction manual.

    As-built report. Construction diary, memorabilia.

    Incident Handling Report.

    Construction**. As-built drawings.

  2. Anonymous users2024-02-14

    I don't know, you go to the Zhulong.com forum to ask.

  3. Anonymous users2024-02-13

    Records of foundation groove inspection.

    2. Quality acceptance report of foundation pile engineering.

    3. Quality acceptance report of foundation treatment project.

    4. Quality acceptance report of foundation and foundation division.

    5. The quality acceptance report of the main structure division.

    6. Quality acceptance report of special branch project.

    7. Line laying acceptance report.

    8. Quality acceptance records of foundation and foundation divisions and subdivisions, sub-items and inspection batches.

    9. The quality acceptance record of the main structure division and the sub-divisions, sub-items and inspection batches contained therein.

    10. Decoration division and its sub-divisions, sub-items, and inspection batch quality acceptance records.

    11. Quality acceptance records of roofing divisions and subdivisions, sub-items and inspection batches.

    12. Water supply, drainage and heating division and its sub-divisions, sub-items, inspection batch quality acceptance records.

    13. Quality acceptance records of electrical divisions and subdivisions, sub-items and inspection batches.

    14. Quality acceptance records of intelligent divisions and sub-divisions, sub-items and inspection batches.

    15. Ventilation and air conditioning division and its sub-divisions, sub-items, and inspection batch quality acceptance records.

    16. The elevator division and its sub-divisions, sub-items, and inspection batch quality acceptance records.

    17. Completion and acceptance records of the quality of the unit project and the sub-unit project included.

    18. The quality acceptance records of the division (sub-division), sub-item and inspection batch of outdoor engineering.

    Hope mine is helpful to you.

  4. Anonymous users2024-02-12

    1. Prepare the project proposal, analyze and study the feasibility of the construction project, and prepare the feasibility study report.

    3. Purchase the 1:500 topographic blueprint of the construction project lot at the Planning Bureau, and handle the construction project site selection opinion. The design unit shall design the general plan of the construction project within the scope of the blue line drawing of the site selection lot.

    4. According to the general plan of the design, go to the Planning Bureau to apply for the red line map and the planning permit of the construction project. According to the planning permit and red line map of the construction project, go to the Land Bureau to apply for the land use permit of the construction project.

    5. The design unit shall design the construction drawings in accordance with the plane scope specified in the red line drawing.

    6. Report the construction drawings to the Fire Branch of the Public Security Bureau for review and obtain the fire audit opinion. According to the fire audit opinion, the construction drawings will be submitted to the Civil Air Defense Office and the Earthquake Resistance Office for review, and the construction drawings will be reviewed and the opinions will be obtained. Handle the bidding procedures of the construction project, and determine the construction unit and supervision unit that win the bid.

    7. Bring the business license and qualification certificate of the design, construction, supervision and construction unit to the Construction Committee (Construction Management Office) to handle the construction permit of the construction project.

    8. The surveying and mapping unit shall survey, map, pile and route the construction project in accordance with the planning permit, land use permit and construction permit.

  5. Anonymous users2024-02-11

    The following materials need to be prepared for the construction drawing review:

    Three sets of professional drawings (blueprints) (returned with a seal after review, note that the preservation drawing review center can be called at any time).

    Architecture: energy-saving calculation book, general plan (3 sets each).

    Structural specialty: geological survey report (reviewed) structural calculation book (high-rise: seismic review opinion, reply opinion).

    HVAC major: energy-saving calculation book, HVAC calculation book (three sets).

    Fire protection opinion (or provide a record letter) (copy).

    Application form (copy) for survey and design units outside the province to undertake single business projects in Jiangsu Province (copy).

    Decoration review] three sets of drawings (including water and electricity) (blueprints) for each specialty

    Fire protection opinion (or provide a record letter) (copy).

    Qualification of the design unit (copy).

    Design contract or power of attorney (copy).

    Budget or tender notice (with the official seal of the builder).

    Area description (with the official seal of the builder).

    List of designers of construction projects (decoration, curtain wall) (decoration).

    Application form (copy) for survey and design units outside the province to undertake single business projects in Jiangsu Province (copy).

    Whether the original design use, use environment and engineering structure of the building are changed in the building decoration project, the construction unit and the relevant design unit shall make an explanation, and a letter of commitment and affix the official seal.

    If the building decoration project changes the original design use, use environment and engineering structure of the building, it shall be signed and sealed by the original design unit and the designer of the building, or the owner shall entrust the design unit with relevant qualifications to redesign, and the redesigned construction project (or reconstruction project) construction drawing design documents shall be submitted to the review machine.

    Structural review. The original drawings related to the design of the construction drawings (approved by the construction drawings).

    Social security certificate (printed online and stamped with the official seal of the design unit; Designers who cannot inquire about social security personal information online, please provide a social security certificate of the past month and go to the Social Security Bureau for sealing; For retirees under 70, please provide a copy of your ID card).

  6. Anonymous users2024-02-10

    The following information should be prepared for the review of the drawings: 1. The construction drawings that have been reviewed and approved 2. The mistakes and omissions in the drawings should be noted in pencil and recorded in the notes. 3. The atlas that needs to be used in the drawings should be prepared and compared with the practices in the drawings, and questions should be answered for unreasonable construction processes or practices.

    4. In the meeting of the drawing review, the questions are raised one by one, so that the relevant parties can reply, and record it, and the meeting is over, sign and seal to confirm, and form a drawing review minutes document.

  7. Anonymous users2024-02-09

    1. Approved project approval documents or preliminary design approval documents; General assessment of planning; The main preliminary design documents (basis for the preparation of construction drawings); 4 sets of geological survey reports (detailed survey); Structural calculations and other necessary calculations; 4 sets of complete construction drawings, (the main drawings must be stamped with the construction drawing stamp, the person in charge of the seal, and the main drawings of the building and structure stamped with the corresponding qualifications of the registered architect and registered structural engineer); planning red line map, land use scope map; Preliminary design (expansion) approval opinion; Review opinions and preliminary design approvals of relevant competent departments, including planning, fire protection, sanitation, transportation, environmental protection, greening, civil air defense, sanitation, earthquake resistance, etc.; Construction project plan or fire protection review approval document in the initial stage.

  8. Anonymous users2024-02-08

    Preliminary design approval documents, main preliminary design documents and construction drawing design documents;

    Report on the results of the engineering investigation;

    Other information deemed necessary by the review body.

  9. Anonymous users2024-02-07

    Land use certificates, planning permits, construction permits, and project acceptance certificates.

  10. Anonymous users2024-02-06

    The procedures for applying for a production license, and going to the Industrial and Commercial Bureau for registration materials and handling procedures are as follows.

    1.Economic and Trade Commission project: feasibility report - application for project approval - energy-saving review - approval.

    2.EIA approval: project approval - EIA application form - approval - preparation of EIA - expert review - approval - three simultaneous construction - application for trial production - review - organization of trial production - organization of declaration and acceptance - testing - completion acceptance.

    3.Safety approval: project approval - safety pre-evaluation - expert review - approval - initial design development (special article) - expert review - organization of construction and installation - application for trial production - review - organization of trial production - organization of declaration and acceptance - completion acceptance.

    4.Building Construction: General Evaluation and Design - Exploration - Architectural Design - Drawing Review - Commencement Procedures - Contract Negotiation - Supervision - Contract Issuance - Contract Supervision Project (Quality, Progress, Change, Related Coordination) - Organization and Acceptance - Settlement - Application for Property Rights.

    5.Report on the commencement of construction of the land certificate of the application territory.

  11. Anonymous users2024-02-05

    Economic and Trade Commission project: feasibility report - application for project approval - energy-saving review - approval.

    EIA approval: project approval - EIA application form - approval - preparation of EIA - expert review - approval - three simultaneous construction - application for trial production;

    Safety approval: project approval - safety pre-evaluation - expert review - approval - initial design development (special article) - expert review - organization of construction and installation - application for trial production - review - organization of trial production - organization of declaration and acceptance - completion acceptance.

    Applying for territorial land certificates.

    Commencement report. The units that need to be contacted include the Economic and Trade Commission, the Environmental Protection Bureau, the Safety Supervision Bureau, the Fire Brigade, the Planning Bureau, the Quality Supervision Station, the Construction Bureau, the Land Bureau, the Meteorological Bureau, the White Ant Prevention and Control Center, the safety assessment intermediary agency, the environmental impact assessment intermediary agency, the design institute, the construction unit, the supervision unit, etc.

  12. Anonymous users2024-02-04

    The answer upstairs is very professional, but the chemical enterprise, in the design stage, is more special, but also needs to carry out safety assessment and environmental impact assessment, referred to as safety assessment and environmental impact assessment, the general project to hundreds of thousands to millions of it, without these evaluations, it is impossible to pass the acceptance.

  13. Anonymous users2024-02-03

    It is generally used in the Don't make a big name in the villa area, that is, the house is built, and it is almost done, but there are still many places to be repaired and changed in Qihu, and then someone needs to guide to modify and then hand over the house.

Related questions
6 answers2024-08-01

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

4 answers2024-08-01

Hello, housing buildings mainly include industrial, civil and public buildings (buildings, structures) projects. The project includes foundation and foundation engineering, earthwork engineering, structural engineering, roofing engineering, interior and exterior decoration engineering, water supply, heating, electrical appliances, sanitary ware, ventilation, lighting, fire protection, lightning protection and other installation projects. Hope mine can help you. Hope.

5 answers2024-08-01

What items are included in the construction project are explained below:Construction works include: civil works. >>>More

6 answers2024-08-01

First of all, we need to popularize the theories of construction engineering technology and civil engineering and management. >>>More

13 answers2024-08-01

The main body of the construction project does not include the foundation work. >>>More