-
The Huanghang-Hangzhou high-speed railway plans to start construction this year and will build a fast tourism ** line.
The reporter learned from the provincial government on January 7 that the Huangshan, Qiandao Lake, Fuchun River, Hangzhou and other famous mountains, lakes, rivers, cities, and famous residences between Huangshan and Hangzhou are planned to start construction this year and be completed in 4 years, at that time, it will only take 1 hour from Huangshan to Hangzhou, and it will only take 2 hours from Hefei to Hangzhou. A few days ago, entrusted by the state, relevant experts went to Huangshan and Hangzhou to conduct research, evaluation and demonstration of the new Huangshan-Hangzhou railway project, and formed evaluation opinions, which will be reported to the state in the near future.
Huangshan is the southern gate of our province, located in the junction of Anhui, Zhejiang and Jiangxi provinces, the world-famous Huangshan Scenic Area is located in the territory, is an emerging tourist city, but also the birthplace of Huizhou merchants and their culture, with nearly 10 million tourists every year. Hangzhou is an important central city in the Yangtze River Delta and a transportation hub in southeast China, as well as a national historical and cultural city and a famous scenic tourist city. It has become an urgent need for the economic and social development of the two provinces to connect the scenic spots and famous areas along the Huangshan to Hangzhou and build a first-class tourism channel between the two provinces.
The new Huangshan to Hangzhou railway starts from Huangshan City, our province, passes through Jixi County, Zhejiang Chun'an County, Jiande City, Tonglu County, Fuyang City, Hangzhou Xiaoshan District, to Hangzhou City, the line is 285 kilometers long, including 80 kilometers in our province. With a design speed of 250 kilometers per hour, it is a passenger dedicated line with a total investment of 36.8 billion yuan. There are 9 stations on the whole line, including Huangshan, Jixi, Chun'an, Fuyang, Xiaoshan and Hangzhou.
The total construction period of the project is 4 years.
According to the relevant person in charge of the province, after the completion of the Huangzhou-Hangzhou Railway, it will not only accelerate the development and opening of tourism resources along the line and build a rapid tourism line, but also shorten the time and space distance between Anhui and other central and western regions and Shanghai and Zhejiang, and accelerate the integration of our province into the Yangtze River Delta region led by Shanghai is of great significance. (Lu Liejia).
-
When will the Hangzhou-Huangzhou high-speed rail open to traffic 2018 Hangzhou-Huangzhou high-speed rail latest news
On March 16, 2018, the Hangzhou-Huangshan (ticket) railway passenger dedicated line track has been fully completed. The Hangzhou-Huangzhou Railway track is fully connected, laying the foundation for the official opening of the Hangzhou-Huangzhou Railway in 2018. It is understood that it will only take one hour from Hangzhou to Huangshan at the earliest.
It is reported that the Hangzhou-Huangzhou high-speed railway project started construction in June 2014 and is scheduled to be completed and opened to traffic in October 2018. The Hangzhou-Huangzhou high-speed railway is connected to the Hefu high-speed railway at Jixi North Station, and after the opening of the Hangzhou-Huangzhou high-speed railway, Hefei citizens can take the high-speed rail for only one and a half hours to reach the shore of Qiandao Lake.
In October this year, by the end of the year at the latest, the Hangzhou-Huangzhou Railway will be put into operation. It only takes one and a half hours to take the high-speed train from Hangzhou to Huangshan.
The Hangzhou-Huangzhou Railway is unique in that it is a veritable eco-tourism high-speed rail line.
Along the way, it passes through famous cities (Hangzhou), famous mountains (Huangshan), famous rivers (Fuchun River), and famous lakes (Qiandao Lake), all of which are well-known tourist scenic spots.
If you count carefully, it strings up the West Lake (ticket) Scenic Imitation Area, Xixi Wetland, Qiandao Lake, Huangshan, Jixi Longchuan (ticket) Scenic Area, the ancient village of southern Anhui Xidi (ticket touching Maozhou) Hongcun (ticket), ancient Huizhou Cultural Tourism Zone and other 7 5A-level national scenic spots, Tonglu Yaolin Wonderland, Qiyun Mountain (ticket) Scenic Area and other more than 50 4A-level scenic spots, as well as more than a dozen national forest parks and geological parks, is a veritable world-class tourism corridor.
-
When will the Hangzhou-Huangzhou high-speed railway be opened?
The opening time of the Hangzhou-Huangzhou Railway has been set.
The total length of the Hangzhou-Huangzhou Railway is 287 kilometers, and the territory of Zhejiang Province is 185 kilometers. Starting from Hangzhou East Railway Station, there are 10 stations along the way, namely Hangzhou East, Hangzhou Wufang Zhounan, Fuyang, Tonglu, Jiande East, etcChun'an, Sanyang, Jixi North, Shexian North, Huangshan (ticket) North. According to the latest news from the Hangzhou Railway and East Railway Station Hub Construction Headquarters,The Hangzhou-Huangzhou Railway will be opened at the end of June 2018
The latest route map of the Hangzhou-Huangzhou high-speed railway
The latest news on the Hangzhou-Huangzhou high-speed railway
Among them, it is much more convenient to go to Hangzhou Qiandao Lake, and there is one directlyQiandaohu Station of high-speed rail.
Gaobang Maozhou Railway Qiandaohu Station is an offline elevated station, which is one of the 6 stations in HangzhouThe only intermediate station with the function of origin station。The station is arranged according to two platforms and six lines, and is a five-sided and five-sided station built on the mountainside, lakeside, stream, bridge, village, mountain, lake, stream, bridge and village, which is also unique among high-speed rail stations at home and abroad, and has the natural conditions to create a masterpiece.
The Hangzhou-Huangzhou Railway, designed to reach a speed of 250 kilometers per hour, will become a one-hour railway traffic artery of the Greater Hangzhou West Line after completion. At present, it takes more than 2 hours to reach Qiandao Lake by car from downtown Hangzhou. After the opening of the railway, the time from Shanghai to Qiandao Lake will be shortened by 3 hours, and from Hangzhou to Qiandao Lake, it will save about 1 hour, and it will be faster to come to Qiandao Lake!
On the first floor, there was another whisper. China's high-speed railways are now large-scale bridges, so settlement is basically not needed. Because he suffered a big loss on the roadbed (Shi Tai), after Shi Tai settled, Zheng Xi was specially repaired into a model. Therefore, the conclusion of the Ministry of Railways is that the bridge is the road. >>>More
There are a total of 10 stations on the Beijing-Zhangjiakou high-speed railway. At 8:30 a.m. on December 30, 2019, the Beijing-Zhangjiakou high-speed railway was officially opened with the G8811 train departing from Beijing North Railway Station. The Beijing-Zhangjiakou high-speed railway starts from Beijing North Railway Station, with a total of 10 stations, a total length of 174 kilometers, and a maximum design speed of 350 kilometers per hour. >>>More
On the morning of June 7, 2015, the large double-walled steel cofferdam of the Tanjiang Bridge in Xinhui District, Jiangmen was launched, marking the official entry of the bridge with a main span of 256 meters into the water construction stage. Since then, the key node project of the Jiangmen-Maoming section of the Shenzhen-Maoming Railway has kicked off the official construction prelude. >>>More
Legal Analysis: 2011. The Beijing-Shanghai high-speed railway officially started on April 18, 2008, and the whole line was officially opened to traffic on June 30, 2011. >>>More
33On October 7, a bullet train sped past the Yun'an Peng Yuanhe Bridge in the Yunfu section of the Nanguang high-speed railway. When will the Nanguang high-speed railway be opened to traffic?It is reported that the high-speed EMU of Nanguang Railway has been jointly commissioned and tested in Zhaoqing, Guangdong and Yunfu to Wuzhou and Nanning in Guangxi since the beginning of October, and the overall stations of Yunfu East, Nanjiangkou and Yunan have been basically completed. >>>More