Which is better, engineering cost or construction economic management?

Updated on educate 2024-02-12
11 answers
  1. Anonymous users2024-02-06

    1.The major of construction engineering management refers to the comprehensive management of construction projects, mainly to learn the construction organization and management of construction projects, including technology, quality, schedule and cost management, etc.

    2.Construction economic management refers to the operation and management of construction projects, mainly learning the cost control, financial accounting, budget settlement and so on of construction projects.

    3.Project cost management refers to the analysis, research and determination of the investment and project cost of the construction project. This includes the evaluation of the economic benefits of the project decision-making, design, and construction phases (preparation, review, evaluation, etc., of estimates, budgets, and settlements).

    The above three majors are from the synthesis to the specific process, as for the good, can only be which is more suitable for themselves, I personally believe that the project cost due to strong professionalism, wide employment, large development space. But it's a matter of your life choice, or it's best if you like it and suit you.

    The project cost belongs to the process of bidding for the project, from planning to starting. The construction economic management is the management of each stage of the project, from the reinforcement engineering, carpentry, cement engineering, staff arrangement and quality management, material management and so on.

    And the similarity is that the biggest connection between the two is the price, and from the beginning of a bidding for a project, the estimator has already estimated the cost of the entire project, from the start to the end of the project, the cost of each material to the second-hand contractor, to the third-hand contractor.

    So when the construction has begun, the connection between the two is the closest similarity.

  2. Anonymous users2024-02-05

    1. Scope of employment and positions.

    Construction Economic Management:

    **Departments, design institutes, accounting firms, engineering construction consulting (consulting) companies, engineering economic consulting institutions, engineering supervision units, industrial and commercial enterprises are engaged in the planning, design, technical economy, supervision, consulting, evaluation, project management and other work of production, operation, service and other management systems.

    Engineering cost: After graduation, you can be engaged in engineering (cost) consulting companies, construction enterprises (Party B), building decoration engineering companies, engineering construction supervision companies, real estate development enterprises, design institutes, accounting and auditing firms, infrastructure departments (Party A) and other enterprises and institutions, engaged in project cost bidding, construction project investment and financing and investment control, project cost determination and control, bidding decision-making, contract management, project budget (settlement) final accounts, project cost analysis, and engineering consulting, project supervision and project cost management related software development and application and technical support.

    2. Major courses (the curriculum varies slightly according to the different training programs of each school).

    Construction Economic Management:

    University Physics, Computer Basics, Economics, Civil Engineering (including Special Construction), Electrical Engineering, Water Supply and Drainage (Including HVAC) Engineering, Building Construction, Operations Research, Statistics and Probability, Accounting, Management, Construction Economics and Management (including Technical Economy, Engineering Economy, Bidding Practice), Asset Appraisal (Including Real Estate Appraisal, Machinery and Equipment Appraisal), Financial Management, Engineering Supervision, Building Materials, Construction Machinery and Equipment, Construction Technology and Organizational Design, Engineering Project Management, etc.

    Engineering Cost: Drawing Geometry and Engineering Drawing, Engineering Drawing and CAD, Principles of Management, Housing Architecture, Building Materials, Engineering Mechanics, Engineering Structure, Building Construction Technology, Engineering Project Management, Engineering Economics, Construction Engineering Valuation, Civil Engineering Measurement, Installation Engineering Construction Technology, Engineering Cost Management, Construction Project Contract Management, Engineering Cost Case Analysis, Electrical Engineering, Fluid Mechanics, Building Electrical and Construction, Installation Engineering Valuation and Measurement, Building Water Supply and Drainage and Construction, etc.

    Degree awarded: Bachelor of Engineering or Bachelor of Management.

    3. Personal feelings.

    1. Liberal arts students must be a bit struggling to learn engineering cost, which involves some mechanical content.

    2. If it is a junior college, it is best to choose the project cost, and if you are a bachelor, you can consider construction economic management.

    3. No matter which major you choose, you must learn a line of love, the major is not good or not, the key is suitable for yourself, you must love to learn, anyway, it is the best in the line, and if you continue to study in the future, these two majors are even more similar.

    Finally, I wish you success.

  3. Anonymous users2024-02-04

    Contemptible people to learn is the cost of engineering, I think the cost of the major, the development prospects are better, boys to learn a car inspection and maintenance is estimated to be better, after all, before the budget must be on the construction site for a period of internship is better, construction site life is very hard, I am still drifting on the construction site.

  4. Anonymous users2024-02-03

    Liberal arts students, it is best to study construction economic management, the project cost is complex, and it is not easy to learn. I studied cost, and I felt at a loss.

  5. Anonymous users2024-02-02

    The building economy is relatively good, and now more and more attention is paid to environmental protection.

  6. Anonymous users2024-02-01

    Construction economics is very beneficial for liberal arts students. This one should work best for you.

  7. Anonymous users2024-01-31

    Summary. Extended information: 1. The content referred to and the scope covered are different1. Project management

    Engineering management refers to engineering activities that are not only governed by the process of engineering concept, decision-making, design, construction, organization and operation, but also related to the rational allocation of resources, materials, capital, manpower, land, environment and information. 2. Project cost: The project cost refers to the construction of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project.

    2. Different practice qualification certificates 1. Engineering management: engineering management examination of constructors, cost engineers, EMCI and other certificates. 2. Project cost:

    The cost of the project is to test the construction, railway, water conservancy, highway and other certificates.

    Dear, hello, project management and project cost are better than project management. Engineering management has a wide range of employment, and now the industry is also in high demand. The goal of engineering management is to cultivate professional engineering management talents with practical operation ability.

    The goal of project cost is to cultivate senior management talents who can skillfully use economic management methods to engage in construction project cost management.

    Extended information: 1. The content referred to and the scope covered are different: 1. Project management: Engineering management refers to engineering activities that are not only governed by the process of engineering concept, decision-making, design, construction, organization and operation, but also related to the rational allocation of resources, materials, capital, manpower, land, environment and information.

    2. Project cost: The project cost refers to the construction of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. Second, the practice qualification certificate is different 1, engineering management:

    Engineering management examination for constructor, cost engineer, EMCI and other certificates. 2. Project cost: The project cost is based on construction, railway, water conservancy, highway and other certificates.

  8. Anonymous users2024-01-30

    Engineering cost belongs to the management category of management science and engineering majors, and the engineering cost major is one of the popular majors newly established by the Ministry of Education according to the needs of national economic and social development.

    Engineering cost is one of the newly established popular majors, which is an emerging discipline developed from the construction engineering management major based on economics, management and civil engineering.

    At present, almost all projects from the start to the completion of the whole process of the budget, including the start of the budget, the project progress allocation, the completion of the project settlement, etc., whether it is the owner or the construction unit, or the third-party cost consulting agency, must have their own core budget personnel, therefore, the demand for engineering cost professionals is very large, the development opportunities are broad.

    Employment prospects for engineering cost majors

    The prospect of the engineering cost industry is very good, and the project cost belongs to the civil engineering and construction aspect, because each project will need a cost budget, which is indispensable for this work, so it is also very good for the cost industry.

    There is also any installation, civil engineering, municipal administration, etc., all need to use the cost, which is related to people's livelihood, important and rigorous. In addition, the cost examination is very strict, and the pass rate of the examination is also very low, but the market demand is large, so employment is easy.

  9. Anonymous users2024-01-29

    The vast majority of girls choose the major of engineering cost, at least all the girls I met are cost management. First of all, cost management does not need to stay on the front line of the construction site for a long time like engineering management, and girls are not as bold as boys in on-site management, and it is too rough.

  10. Anonymous users2024-01-28

    Girls should learn engineering cost, and engineering management is suitable for boys. Because I'm also a girl, I learned cost!

  11. Anonymous users2024-01-27

    The people who need to manage are relatively strong, and generally there is no need for such people.

Related questions
5 answers2024-02-12

The construction cost is composed of the following parts:

1. Direct engineering costs, that is, various expenses that constitute the engineering entity, including labor costs, material costs, construction machinery use costs, etc. >>>More

7 answers2024-02-12

The registered cost engineer includes the cost of various professions, not only the cost of electrical, but also civil engineering, air conditioning water supply and drainage, etc. Registered electrical engineers are still good, you can take a look, the affiliation fees are relatively high.

13 answers2024-02-12

So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More

12 answers2024-02-12

Girls study civil engineering, generally do the budget is the most suitable, and then do design, when looking for a job in the early stage, it will be very depressed, no experience, no certificate, the general company will not want you, but as long as you can persevere, after the certificate in the future, it will slowly get better, and the construction oil and water are still quite big. >>>More

23 answers2024-02-12

The national cost officer, to be precise, should be the national cost officer qualification certificate, which is a kind of examination for national registration and provincial unified examination, and only this certificate is authoritative for budgeting. >>>More