How to paste floor tiles on the putty layer wall? Which construction method is stronger?

Updated on home 2024-07-13
12 answers
  1. Anonymous users2024-02-12

    First of all, the verticality, height, and flatness of the wall are measured with an infrared instrument. Then the masters will use an electric mill to smooth out the uneven places. Tile adhesive is an adhesive material that is directly applied to the back of the tile, which can effectively improve the bond strength between the tile and the adhesive material.

  2. Anonymous users2024-02-11

    Lay moist cement on the wall, be sure to brush a layer of adhesive before cement, draw a few cement channels on the back of the tile, and then lay a layer of cement mud, so that the paved bricks will be more solid and will never fall off.

  3. Anonymous users2024-02-10

    Be sure to scrape the surface of the putty wall flat, then mix cement, glue, etc., and stick the floor tiles on it. In order to make the tiles more firm, be sure to mix cement and tile adhesive.

  4. Anonymous users2024-02-09

    First of all, you should remove all the putty powder on the wall, then polish the wall, then clean the dust on the wall, and then do the hook treatment.

  5. Anonymous users2024-02-08

    The floor tiles cannot be pasted on the wall of the putty layer, and all the putty on the wall needs to be scraped off, and the tiles can be pasted after scraping to the cement layer, so as to make the tiles more firm.

    Floor tiles can not be used between the putty and the adhesive material, the adhesive material must be used on the base wall, and the putty is an isolation layer, if the putty is not removed, the tile can not be pasted after pasting the tile, or it will fall off with the paste material, affecting the decoration effect If you want to paste the tile firmly on the wall, you need to scrape off the putty layer.

    Putty is a material with particularly low strength, especially it will fail after encountering water, and the putty will fall off directly from the wall after failure, so when the tile is pasted on the putty layer wall, its firmness cannot be guaranteed at all, even if it is used, the paste material will fall off with the fall off of the putty, such a tile can not be pasted firmly at all, so it is necessary to shovel off all the putty on the wall, and expose the cement base or other base wall surface inside before pasting the tile.

    When pasting tiles on the putty layer wall, you need to shovel the wall skin first, use tools, and remove all the putty layers on the wall, then you need to pour water on the wall to soak all the putty on the wall, and then you can use a shovel to remove all the putty, and then rinse the remaining putty on the wall with water. After doing this, it is necessary to check the wall base layer to shovel off the putty, the base layer is basically the plastering layer, to see the strength of the plastering layer, if the strength is qualified, you can directly paste the tile, if the strength is unqualified, you need to shovel off the plastering layer and re-plaster.

    Remove the putty on the wall, deal with the base layer before you can start to paste the tile, paste the tile to use a strong adhesive material, the adhesive material is smeared on the back of the tile, directly paste it on the wall, the adhesive material used at this time can use tile adhesive or use professional tile adhesive, want to increase the firmness of the wall tile, you can also paint an appropriate amount of wall solid on the plastering layer, and then paste the tile after it is dry, so that it can be listed to ensure its firmness.

  6. Anonymous users2024-02-07

    You can choose the dry paving method, to completely disappear the water of the muscle layer, and then effectively remove the floating sand and debris on the surface, in a series of bonding layers, you can also choose the wet paving method, he will choose a relative proportion of mud and sand slurry and ordinary water; The wet paving method is more firm, because this construction method can effectively fix the putty and tiles, so it is more firm.

  7. Anonymous users2024-02-06

    You can use the dislocation method, traditional paving method, I-shaped paving method, wet paving method, dry paving method; Personally, I think that the misalignment method and the dry laying method can make the tiles more firm.

  8. Anonymous users2024-02-05

    First of all, it is necessary to keep the wall dry, clean the base layer, and check whether there are cracks in the wall, and then paste; After the base layer is treated, it is inspected for cracks before being laid with latex paint or cement mortar.

  9. Anonymous users2024-02-04

    Cement is required. Then to use a tile adhesive, scrape a layer on the back of the tile, which will stick directly to the wall.

  10. Anonymous users2024-02-03

    At this time you can use tile adhesive. You first have to treat the wall, then you have to scrape a layer of putty, and then you have to apply a layer of glue.

  11. Anonymous users2024-02-02

    1. Clean the surface of the wall. Before the wall tiling, the base layer should be cleaned up, and the lime paste, latex paint, wallpaper and other stool lacks on the wall should be cleaned up, because the tiling needs to be made of sand and concrete, so that the adhesion is high, but if putty is used, the putty is sandwiched between the wall and the wall bricks, which will affect the adhesion.

    2. Check whether the wall tiles are qualified. If there are cracks in the wall, the wall must be repaired before the tiles can be pasted, otherwise after a long time, the cracks will become bigger and bigger, which will cause the wall tiles to crack or fall off; In addition, if the flatness or verticality of the wall is very different, it also needs to be leveled with cement mortar, and then the tiles can be pasted.

    3. The wall tiles are fully immersed in water. Generally, before the tiling, the wall tiles should be fully soaked, because the wall tiles have a high moisture content, and the full soaking is to prevent the bricks from absorbing the moisture of the cement mortar, so that the cement plays the role of adhesive, so as to avoid the jujube into hollowing, falling off, and even cracks, therefore, the wall tiles should be fully watered and moistened, and the tiles should also be soaked in water for at least 20 minutes before they can be fully dried.

  12. Anonymous users2024-02-01

    1. Clean the surface of the wall. Before the wall tiling, the base layer should be cleaned up, and some things such as lime paste, latex paint, wallpaper and other things on the wall should be cleaned up, because the tiling needs to be made of sand and concrete, so that the adhesion is high, but if putty is used, the putty is sandwiched between the wall and the wall bricks, which will affect the adhesion.

    2. Check whether the wall tiles are qualified. If there are cracks in the wall, the wall must be repaired before the tiles can be pasted, otherwise after a long time, the cracks will become bigger and bigger, which will cause the wall tiles to crack or fall off; In addition, if the flatness or verticality of the wall is very different, it also needs to be leveled with cement mortar, and then the tiles can be pasted.

    3. The wall tiles are fully soaked in water. Generally, before tiling, the wall tiles should be fully soaked, because the wall tiles have a high moisture content, and the full soaking is to prevent the bricks from absorbing the moisture of the cement mortar, so that the cement plays the role of an adhesive, so as not to cause hollowing, falling off, and even cracks, therefore, the wall tiles should be fully watered and moistened, and the tiles should also be soaked in water for at least 20 minutes before they can be used.

Related questions
14 answers2024-07-13

When choosing floor tiles, it is important to consider the following aspects: First, it depends on the brand. Only well-known brands of floor tiles, the quality of their building materials can meet the national standards, and the content of harmful substances can be within a safe range. >>>More

7 answers2024-07-13

Electric floor heating basically has no requirements for the ground, the first consideration can be the floor tiles, the thermal conductivity of the floor tiles is the best, in fact, you can consider laying solid wood flooring, laminate flooring, or multi-layer solid wood flooring, but you must not lay pure solid wood flooring, floor heating has higher requirements for pure solid wood flooring, only individual brands can be used.

6 answers2024-07-13

In fact, there is no skill in scraping putty, as long as we carry out construction in accordance with the construction requirements and standards, but some of the following problems need to be paid attention to, of course, it can also be understood as a putty scraping technique: >>>More

11 answers2024-07-13

In a high-rise residential building, what is an equipment floor? How many layers are the device layers? You'll know after reading it.

10 answers2024-07-13

Ingredients: 430 grams of plain flour, 7 grams of salt, 120 grams of boiling water, 130 grams of cold water, 35 grams of hot oil, and a little cold oil. >>>More