How to do construction project data? What training courses are useful?

Updated on society 2024-07-22
13 answers
  1. Anonymous users2024-02-13

    Architectural courses include Architectural Drawing, Building Materials, Theoretical Mechanics, Mechanics of Materials, Structural Mechanics, Building Construction, Construction Organization Design, Budgeting, Building Construction, Building Sanitary Equipment, Building Appliances, Foundations and Foundations, Building Structures, Steel Structures, etc.

    The apartment can also be called a single project, and its design is completed by four-level designers, specifically, building structure design, building structure design, water supply and drainage and heating design, and building electrical design, a group of less than one person;

    There are many factors to consider in the design, generally for the bearing capacity of the foundation, seismic grade, service life, etc., and some design specifications stipulate the content, such as the spacing of stairs, fire escapes, etc.;

  2. Anonymous users2024-02-12

    The compilation of construction engineering data is a combination of technical and business communication.

    The work content of the construction engineering data clerk includes the sorting and archiving of engineering data: the sorting and archiving of construction engineering quality assurance data such as engineering civil engineering and installation majors, the sorting and archiving of process acceptance data, and the sorting and archiving of completion data. Report to the inspection supervision and quality supervision station, deliver the completed data to Party A, and assist Party A to provide information to the archives and other work.

    1. Ability to read architectural drawings.

    2. Be familiar with the construction process, and be familiar with the whole process from start to completion.

    3. Ability to organize materials manually.

    4. Familiar with the specifications of data sorting and archiving.

    5. Proficient in data collation software.

    6. Proficient in the procedures of concealed acceptance, branch acceptance and completion acceptance.

    7. Familiar with the content and process of data collation.

  3. Anonymous users2024-02-11

    Now there is a special software for applying building data, which can be purchased for reference.

  4. Anonymous users2024-02-10

    The training and learning content of construction personnel includes:

    1. Be able to see through the drawings, and the drawings should have depth.

    2. Learn to operate the instrument of the base copy, and be able to measure the spring cover line according to the drawing.

    3. Familiar with various specifications, atlases, etc.

    4. Learn the organization and management methods and experience of the whole construction with the construction staff, especially the labor subcontracting in the project.

    There are many specialties (rebar worker, formwork worker, concrete worker, bricklayer, scaffolding worker.

    Tower crane workers, electricians, plumbers, ordinary workers, etc.), the organization and management of the project is more important, to control the progress, quality, safety, investment, etc., to regularly and irregularly organize meetings, coordination, inspection. It is necessary to organize human, material, and financial resources, and do a good job of before, during, and after control.

    5. Learning to be an excellent construction worker requires the spirit of hardship.

    Extended Information: Professional Categories of Constructor Training and Learning:

    There are 6 professional categories of professional subjects: construction engineering, highway engineering, and water conservancy and hydropower engineering.

    Municipal Utilities, Mining Engineering and M&E Engineering. Candidates should choose a major for the examination according to their work needs and their own conditions when registering.

    2. Hold a professional qualification certificate;

    3. Familiar with quality acceptance evaluation standards, project construction management, safety and civilized construction specifications;

    4. Familiar with relevant technologies, acceptance criteria and work processes.

    arrangement, process focus and process connection;

    5. Strong construction organization, coordination and communication skills.

  5. Anonymous users2024-02-09

    The Training Materials for Construction Engineering Data Clerks mainly introduces the job responsibilities of construction project data clerks and the methods of compilation and management of construction engineering data. The main contents of the book include introduction, construction unit document management, engineering supervision data management, civil engineering data management, building water supply, drainage and heating engineering data management, ventilation and air conditioning engineering data management, building electrical engineering data management, elevator engineering data management, construction engineering data archiving management, etc.

    This book can be used as a training material for construction engineering data personnel, and can also be used as a reference for other professional and technical management personnel in construction engineering.

  6. Anonymous users2024-02-08

    "Construction Engineering Data Technician Training Textbook" is a book published by China Building Materials Industry Press in 2010, and the author is Zhang Bo. The book describes the job responsibilities of construction engineering data clerks and the methods of compilation and management of construction engineering data.

  7. Anonymous users2024-02-07

    1. First of all, office software, including word, excel, ppt. The first two are a must-know and as proficient as possible.

    2. CAD software, this is a must, and the data clerk must be able to read the drawings if he wants to do a good job of the data.

    3, data software, this depends on which data software your company buys, the best is Hengzhi Tiancheng, down to China soft, a continent and so on.

    4. The most important thing is that you must be familiar with your local engineering data preparation guidelines and engineering data archiving catalogs, etc., and know the filling and submission of each inspection batch and record.

    Hope it helps.

  8. Anonymous users2024-02-06

    CAD drawing on the computer needs to be learned, and the rest is Word documents and EXCE can be used.

  9. Anonymous users2024-02-05

    The three main materials of the building, reinforced concrete sand, are related to the steel bar: model, material, use, and processing method.

    Cement: grade, use, time characteristics, processing and mixing methods.

    Ossa: model, use.

    The construction sequence of the building: foundation, body, decoration.

    Basics: type, practice, scope of application.

    Main body: type, construction method, construction period.

    Decoration: roofing engineering, interior and exterior powder engineering, etc.

  10. Anonymous users2024-02-04

    I'm also a beginner, and many seniors told me that the first thing to do is to learn to read drawings, so I'm looking at drawings now. Then there is the ratio of some materials, such as the different proportions of mortar, the type of concrete, etc. Next, I don't know very well, so beginners should learn these two first.

  11. Anonymous users2024-02-03

    The general procedure for the inspection of the project from the entry to the completion of the data.

    1. The construction organization design (plan) is submitted for review.

    2. Drawing review record.

    3. Technical (safety) disclosure.

    4. Commencement report.

    5. List of management personnel.

    6. All kinds of materials for inspection.

    7. Design changes.

    8. On-site visa.

    9. Concealed inspection.

    10. Inspection batch inspection.

    11. Sub-project inspection.

    12. Submit for inspection of branch projects.

    13. Unit engineering inspection.

    14. Completion report.

    6-8 of them are interspersed throughout the construction process of the project.

    1) At the beginning of the entry.

    The engineering and technical documents are submitted for review and the construction organization design is attached.

    Subcontractor Qualification Application Form Attached to the Enterprise Qualification.

    List of project management personnel with copies of qualification certificates.

    Go through the entry procedures with Party A and sign a security agreement.

    Internal information. Organize the list of construction team personnel.

    Attach a copy of your ID card and a copy of your special work certificate.

    Carry out on-site and written safety and technical disclosure and archiving to the construction team.

    Technical information. The drawings approved by the design are archived as the basis for construction.

    Archive changes to drawings at any time).

    Notice of bidding in the bidding documents of the project contract and the contract of the construction team.

    Sign an agreement with the construction team as necessary to supplement the contract and archive it, and require Party A to provide a written disclosure of the control line and the technical disclosure of the installation and archive.

    2) Material entry.

    Engineering materials entry inspection form.

    Attached internal information such as inspection records, product certificates, and test reports of materials and components.

    The bills, time, and quantity of the materials entering the site, the product certificate and test report of the materials recorded by the handler shall be timely recourse and the validity of the supporting documents (such as the time of issuance, the time of time, and whether there is a seal of the unit).

    Engineering installation inspection.

    The project sample is submitted for inspection.

    If required, you can make your own ** to indicate the location, inspection content, time and other sub-division project construction inspection form.

    Attach the inspection records of concealed projects, inspection batch quality acceptance records and other handover inspection records as required.

    Conduct tests and inspections with units related to the upper and lower processes.

    Three-sex testing, pull-out test, flaw detection, glue compatibility test, etc. According to the requirements of the selection, by Party A selection, sampling.

    Internal information. Construction schedule.

    Material incoming plan.

    Staffing plan.

    Implement approach plan.

    Pilot testing plan.

    Information Verification Plan.

    Construction logs. 4) Engineering economic and technical documents.

    Project negotiation changes, records of sending and receiving documents, ** orders, quotation lists, archiving drawings and drawing changes archiving.

    5) Construction logs.

    It includes weather changes, construction content progress, safety management content, and the occurrence of important events.

    6) Completion of the project.

    Completion data collation will not be described in detail for the time being.

    The final accounts of the project and the final accounts of the construction team.

    Handover of works. Project summary.

    Dear, remember to praise it.

  12. Anonymous users2024-02-02

    You should go to the front line of the construction site to talk and see more with the construction workers to understand the construction process and construction methods of the project.

  13. Anonymous users2024-02-01

    First, first enter the venue to prepare:

    1. Project commencement report, construction permit, construction organization design, materials and equipment for review.

    2. Concrete mix ratio design and material inspection.

    3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.

    4. Engineering survey and positioning records.

    Should be all prepared:

    Basic information table of construction projects.

    Construction approval materials (project approval documents requested from the construction unit).

    Construction project planning permit (planning permit requested from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract requested from the construction unit).

    Supervision contract (supervision contract requested from the supervision unit).

    A copy of the qualification and personnel certificate of the construction unit.

    Copies of project supervision institutions and relevant certificates.

    A copy of the qualification and personnel certificate of the design unit.

    A copy of the qualification and personnel certificate of the survey unit.

    Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (project manager, technical leader, constructor, budget officer, quality inspector, safety officer, material officer, surveyor, sampler, data clerk, drainage, heating, electrical engineer).

    Drawing triage records and design change documents.

    Design documents and design changes before the start of construction.

    Construction site quality management inspection records and schedules.

    1. A package of quality responsibility system.

    2. The main professional types of work operation certificates (tower cranes, scaffolding workers, gantry frames, electric welders, butt welders, straight ribbing, electroslag welders) (ask for each team).

    3. The qualification contract of the subcontractor.

    4. Construction drawing review (construction drawing review certificate).

    5. Geological survey documents.

    6. Construction organization design, construction plan and approval.

    There are others.,I'm not all out here.,If you need it, you can hit it in the (library) (construction materials first enter the site to prepare) to **a.,All of the above need to be done to enter the site Of course, that is also sent by me = =!

Related questions
4 answers2024-07-22

Hello, housing buildings mainly include industrial, civil and public buildings (buildings, structures) projects. The project includes foundation and foundation engineering, earthwork engineering, structural engineering, roofing engineering, interior and exterior decoration engineering, water supply, heating, electrical appliances, sanitary ware, ventilation, lighting, fire protection, lightning protection and other installation projects. Hope mine can help you. Hope.

7 answers2024-07-22

In the case of a part-time construction site, it is generally charged according to the completed area, and the specific amount of money per square depends on the area.

1 answers2024-07-22

Hello dear <>, I am happy to answer for you, the answer is as follows: the engineering cost training report requirements are the purpose of the training, the municipal engineering quota and budget training is a practical course, is a professional comprehensive exercise after completing the course learning. In the course teaching of municipal engineering budget, students have completed the calculation of the quantity of each sub-project and the application of the base price of the fixed amount, and have mastered the calculation procedure of the project cost and the preparation of the bill of quantities. >>>More

5 answers2024-07-22

The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More

14 answers2024-07-22

What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.