Tool: Hammer. Screwdriver.
1. First of all, install the lifting rocker arm of the drying rack at the appropriate height.
2. The load-bearing support frame of the drying rack is fixed on the roof.
3. After fixing the load-bearing bracket on the other side, install the torque support point of the lifting cable.
4. Put on the lifting and lowering steel cable of the drying rack.
5. Install the beautification cover on the load-bearing support.
6. Install the drying rack hook at the head of the wire.
7. Install the main body of the drying rack on the hook.
8. Hang a drying rack on the main body.
9. Shake the rocker arm to realize the lifting of the drying rack.
Notes:1. When installing the lifting drying rack, when installing the top seat, first measure the diameter of the balcony lighting with a steel ruler, and then make an installation mark between 15-30 cm on both sides, and then measure the distance between the number and the edge of the balcony.
Then determine the wide top of the top seat installation at this distance, and then take the lamp as the center, measure the length of the balcony, and then determine the two sides of the lamp according to the length of the clothes pole of the drying rack 80-100 cm, and then there are four intersection points with the measurement distance of the width, and these four intersection points are the installation position of the top seat of the hanger.
2. After the position is determined, start drilling with an electric drill, and then fix the four top seats with expansion screws, which can be adjusted according to the actual length, the two top seats on the side of the corner of the swing hand are the movable end, and the other two top seats are fixed seats, and the difference between the two is that the movable seat is a wheel.
-
Installation method of integrated ceiling drying rack: before the ceiling, first reinforce it with a woodworking board at the corresponding position where you want to install the hanger, and then screw the screws on that position after the installation of the integrated ceiling is completed. Installing a drying rack will solve the problem.
Make four small holes in the aluminum gusset, you can, you can't see anything after installing the drying rack, if the ceiling is large from the top surface, you can use the extended wire. Installing a drying rack can be installed by Luban's master at home, and you can go to place an order, and there will be a nearby master to install it.
-
The installation steps of the automatic drying rack are as follows:
Determine the installation location: Determine the installation location and height of the drying rack according to the size of the balcony where the drying rack will be installed and personal needs.
Drilling: Use a percussion drill to drill holes on the top of the balcony or the top of the wall to ensure that the hole position is accurate and the hole size is appropriate.
Install the top seat: Install the top seat of the drying rack on the hanger, adjust the position and fix it with screws.
Install the drying bar: Install the drying rod of the drying rack on the top base, make sure that the distance between the drying rod and the top seat is appropriate, and fix it with screws.
Connecting wires: Thread two wires through the bearing wire grooves of the top seat and the drying rod, and fix them with screws.
Install the plug: Install the plug at both ends of the drying rack to ensure the use effect and aesthetics of the drying rack.
Adjust the position: Finally, adjust the position and angle of the drying rack to make sure it is ergonomic and can be used properly.
Before the drying rack is installed, the following preparations need to be made:
Check the surface of the board: Check the surface of the drying rack plate for scratches or other defects, and if there are any, deal with them in time.
Check the identification of the drawings: check whether the identification on the installation drawings of the drying rack is consistent with the site, and give feedback and adjustment in time if there is any discrepancy.
Clean up the balcony: Clean the balcony of debris and dust so that the installation process is smoother.
Prepare installation tools: Common tools include percussion drills, pliers, scissors, screws, screwdrivers, brackets, base plates, etc.
Find a professional installation master and go to Luban to get home.
-
How to install a drying rack under a prefabricated roof pro! Hello, I am glad to answer for you<> the method of installing a drying rack under the prefabricated roof is as follows: you can drill an eye on the prefabricated board first, and then screw on the screw to install the prefabricated board drying rack You can use an electric drill to make a hole in the prefabricated board first, and then install the expansion screw in the hole, the expansion screw must be matched with the hole drilled, so that when the thread is tightened, it will be very sensitive and strong, and it will not fall.
After all the required holes are drilled and the expansion screws are installed, the drying rack can be pressed and fastened with screws, so that it will generally not fall down. Prefabricated roof, although its load-bearing effect, and concrete cast-in-place roof, is very different, but in the prefabricated roof, the installation of drying racks, is no problem at all, because the drying rack is not very heavy, the volume is very small, the weight is very light nuclear base, plus the clothes we want to dry, will not be very heavy, now the washing clothes are basically, dehydration will be dry, therefore, in the prefabricated board roof, the installation of drying racks is OK, I hope mine can help you <>
Do you have any other questions?
-
1. Find the installation position of the hand crank and punch holes.
2. Install the expansion screws on the pulley frame: a total of 4, 2 single pulley frames, 2 double pulley frames, and also install 2 expansion screws on the corner frame.
3. Fix the hand crank with the expansion screw, then tighten the expansion screw with a tool, and tighten the screws on the handle after installing the handle.
4. Thread the steel wire into one of the corners, pass the two ends of the wire rope through one of the double pulley frames, the two wire ropes are parallel and do not be entangled, and pull one end of the wire rope that is worn out from under the double pulley frame to a position close to the hand crank.
It should be noted that the drying rack must be fixed on the top of the wall, and must not be fixed on the ceiling or keel to avoid collapse. The drying rack is generally installed about 20cm away from the top of the balcony ceiling, and it is necessary to pay attention to the matching with the ceiling when installing the electric drying rack.
The general installation method is to fix the screws on the top of the ceiling by the expansion screws, then use the extended support rod to connect with the screws, and finally connect the fixing mouth of the drying rack with the support rod. This means that the support rod needs to pass through the ceiling panel, so care needs to be taken when perforating the ceiling panel.
-
Family life is getting better and better, furniture is needless to say, it must be getting better and better, before talking about drying racks, now most families should be automatic drying racks, this is a good thing, the following is to make a leak to tell everyone that the automatic drying rack installation is no problem for one person to complete, let's follow this site together to install automatic drying racks.
The installation method of the automatic lifting drying rack is as follows:
1.Install the top seats, determine the position, drill the holes with a drill bit, and after drilling, fix the four top seats with expansion screws (if the length of the rod is larger than the traditional size, adjust the length accordingly).
2.Install the corners, the corners can be installed on the top of the balcony or on the top of the wall, the corners are 50-70 cm from the movable top, it must form a triangle (45 degree angle) in the middle of the movable top base, as well as the position of the installation hand to maintain the same vertical line.
3.Wire connection, a set of drying racks contains two steel wires, first, take out one, first, pass one end of the steel wire through the corner bearing trunking, then through the movable wheel bearing trunking of the movable end top seat, and then through the fixed end top seat, the bearing trunking makes the wire perpendicular to the ground, then the top cover is inserted from the wire to grab the top cover, the same goes for the other end of the wire, the other wire is installed in the same way as the first one.
4.Dry connection, at the end of each wire, put on the ball and tie it into the ball, then pull the ball to the top seat, then pull the wire from the corner position, pull the wire into a double strand, the open stove is stuck on the side of the vibrator, loosen the wire in the hand crank, put down the drop ball, pass the drying rod through the drop ball, then screw it into the hole of the drop ball to fix the screws, and finally, plug the head at both ends of the dry rod.
I have a low-cost electric remote control drying rack here.
Electric drying rack maintenance step 1: Different brands of electric drying racks, the quality of wire rope is different. The maintenance of the wire rope is particularly important, regular lubrication can greatly reduce the friction, ensure that the lifting is very smooth, and the wear between the pulley is greatly reduced, which can greatly extend the service life of the drying rack, which is easy to do. >>>More
1. Installation of the hand shaker: The hand shaker is generally installed on the right side of the balcony to facilitate habitual use, and the distance from the ground is generally 120cm, which is determined according to the height of the user. Fix with expansion screws. >>>More
The hand-cranked Panpan drying rack will automatically slide down after shaking, mainly because the small support piece of the spicy wheel in the shaker handle cannot support the gear of the spicy wheel, and it reverses and slides down, or the gear is worn out and causes the phenomenon of self-locking failure and declines. This situation can also occur in other brands of hand-cranked products. >>>More
1. The hand crank gear is damaged, check that your hand crank is broken, there are two gears in the hand crank, if the gear is broken, replace the gear. >>>More