Before installing the flooring, should I ensure that the indoor warmth and humidity are within a cer

Updated on home 2024-06-19
10 answers
  1. Anonymous users2024-02-12

    Before installing the flooring, it is necessary to ensure that the indoor warmth and humidity are within a certain value. If it is necessary to finish the wall to determine the specifications of the floor, then the layer thickness of different styles, if the height difference of the stone floor is maintained at a critical height, may be made. One-key stone floor or skirt, the gap at the bottom of the door leaf is too large, and the sound insulation effect is not good.

    Pay attention to the installation of the floor. The floor is more afraid of moisture, so it is best to have a humidity of 50% in the room. If the indoor humidity is 40%, humidification measures should be taken.

    If it is about 80%, it needs to be ventilated and drained. Avoid prolonged exposure to sunlight.

    1.If you are eager to renovate and live, remember that the floor must be strictly protected from moisture and isolated from the floor. The house should also be ventilated and dehumidified frequently, and the floors should be well maintained.

    In winter, the air humidity is relatively low, and many consumers will also choose humidifiers to adjust the indoor humidity. It is enough to keep the indoor relative humidity above 40%, which is not only beneficial to human health, but also conducive to the maintenance of the floor. Do not put furniture on the floor immediately after it has been laid.

    After installing the laminate flooring, it is no problem to put the furniture the next day, if it is solid wood, you need to put the furniture for a few days.

    2.For the flatness check of the floor to be paved, you can use a two-meter ruler to lay flat on the inspection ground, and use three thicknesses of feeler gauge to check the gap between the ruler and the ground. If you fail, you qualify; After that, it is not qualified.

    If the ground is uneven, it needs to be leveled with a shovel. If the situation is serious, it should be re-leveled or self-leveled. Check the moisture content of the ground, measure the moisture content of the ground with a water content tester, and the requirements standard of ordinary ground.

    3.When we choose wood flooring, we must pay attention to the material. Eco-friendly materials are preferred.

    At the same time, it is necessary to pay attention to the installation, and the standard installation can ensure the quality of use. Due to the dry weather in winter, many people think that when installing flooring in winter, they should leave a large shrinkage joint, but this is not the case, how to leave the seam, depends on the actual situation. The above is the answer to the question of whether the indoor warmth and humidity should be within a certain value before installing the floor.

  2. Anonymous users2024-02-11

    It is very important to keep the temperature and humidity in the room within the correct range when installing flooring, which is generally good for flooring installation.

  3. Anonymous users2024-02-10

    Yes. Because in this way, the floor can be avoided when the floor is installed, and then this design can also improve the comfort of the living, so that the decoration is not easy to rework.

  4. Anonymous users2024-02-09

    Yes. It is necessary to ensure that there will be a particularly good place in this way, and that there will be a very correct installation in life. There will be no erection in the future.

  5. Anonymous users2024-02-08

    It should be ensured that this is good for the laying of the floor, which can be better installed and can effectively avoid natural expansion and contraction.

  6. Anonymous users2024-02-07

    1.The ambient humidity should be above 40%, and the installation of the floor should not exceed 20%: the newly laid cement floor should dry the ground. Otherwise, the floor cannot be installed and used normally, and the optimal humidity is 50% 60%. Whether it is solid wood flooring, laminate flooring.

    Or laminate flooring.

    Wood has high requirements for both temperature and humidity. The temperature and humidity are relatively pleasant in the left and right seasons, and the temperature is very high in the summer. After the floor is laid, it expands and shrinks due to the heat in autumn and winter.

    and other physical factors, it is more likely to deform and crack. In winter, the temperature is low and the floor is relatively dry. In summer and autumn, it swells due to moisture and water absorption.

    2.Except for seasonal factors, the temperature of the ground pavement should be kept between 16-30. This temperature allows the wood to remain in its natural state, and it is best to avoid the afternoon and evening during the construction time.

    Try to do it after 2 p.m., when the temperature and humidity are the most suitable for the day. Floor paving is usually carried out after the completion of the wall, carpentry, oiling and other processes. to prevent other items from damaging the floor.

    Before laying the floor, if you want to do a good job of cleaning the ground, put the cement and putty on the ground.

    After cleaning up, ensuring that the ground is level, and taking moisture-proof measures to ensure that the ground has no sand residue, you can start laying the floor.

    3.After the floor is laid, it is necessary to paint the floor and polish and wax from time to time. Because floors are often damaged, brushing floor paint and polishing and waxing can help protect the floor, extend the life of the floor, and make it easier to clean.

    Floor paving is generally carried out after the completion of the wall, carpentry, oiling and other processes. to avoid damage to the floor during the construction of other projects. Before laying the floor, if you want to do a good job of cleaning the ground, clean the cement and putty of the ground, ensure that the ground is flat, and take moisture-proof measures after ensuring that the ground has no sand residue, you can start laying the floor.

    4.If there is a use of diatom mud.

    It is recommended to apply diatom mud after the installation of the floor. After painting or coating indoors, it is recommended to install the flooring at least after 2-3 days to prevent damage to the paint or coating. After installing the flooring, pay attention to ventilation, humidity, and temperature.

    The optimal installation temperature for flooring is between 18-24 degrees Celsius and the optimal humidity is between 45-60%. Optimal temperature and humidity help to extend the life of your floor!

  7. Anonymous users2024-02-06

    The temperature of 25 degrees to 35 degrees should be selected, and the humidity of spring or autumn should be selected for installation, so that the effect is better. Problems can also be avoided.

  8. Anonymous users2024-02-05

    The temperature should be around 15 and the humidity should be above 40%, so that it can be better installed and avoid the impact of thermal expansion and contraction.

  9. Anonymous users2024-02-04

    The temperature should be around 20 and the humidity should be between 20% and 40%, so that it can be better installed and avoid too large gaps.

  10. Anonymous users2024-02-03

    Summary. Hello, dear, humidity 45% 65%RH is the most suitable Simply raising the indoor temperature will reduce the indoor humidity, while the dry air will make people uncomfortable and even cause the phenomenon of "fire". When the air humidity is lower than 40%RH, bacteria and viruses easily spread with the dust in the air, while the mucous membrane of the human respiratory tract is easily dehydrated, the elasticity is reduced, and the mucus secretion is reduced.

    Hello, it's a pleasure to serve you, I have received your question from my side, it takes time to type, please wait a moment.

    Hello, dear, humid hall degree 45% 65%RH is the most suitable Simply increasing the indoor temperature will reduce the indoor humidity, and the dry air will make people uncomfortable, and even cause the phenomenon of "pants are on fire". When the air humidity is lower than 40%RH, bacteria and viruses can easily spread with the dust in the air, while the mucous membrane of the human respiratory tract is easily dehydrated, the elasticity is reduced, and the secretion of mucus is reduced.

    Hello, it's a pleasure to serve you, I have received your question from my side, it takes time to type, please wait a moment.

Related questions
17 answers2024-06-19

The floor is deformed or the board surface is cracked.

Phenomenon: Deformation of the floor or cracking of the board. >>>More

8 answers2024-06-19

Precautions: 1. The unevenness of the ground is less than 3 mm, if it is exceeded, the cement floor needs to be re-laid. >>>More

8 answers2024-06-19

Bamboo flooring is a natural material, its color, texture are different, can not be completely consistent, in addition to the floor production enterprises careful color packaging, please in the construction of the floor color, texture, length and so on for appropriate deployment, so that the floor is more natural. >>>More

14 answers2024-06-19

1. Prepare before purchasing.

Before choosing wood flooring, the owner should first understand the orientation and area of the house, so that before buying wood flooring, a floor plan can be drawn for the master plan, as well as the use of each room. >>>More

10 answers2024-06-19

Flooring is the most commonly used decoration material in our home decoration, and it is often used as the floor decoration of our private space. In the process of laying the floor, it is necessary to use the strip to fix or divide the area. We don't know much about decoration, so today we will introduce the relevant content of the floor strip below, let's take a look! >>>More